29 CFR Subpart T - Subpart T—Demolition
- § 1926.850 Preparatory operations.
- § 1926.851 Stairs, passageways, and ladders.
- § 1926.852 Chutes.
- § 1926.853 Removal of materials through floor openings.
- § 1926.854 Removal of walls, masonry sections, and chimneys.
- § 1926.855 Manual removal of floors.
- § 1926.856 Removal of walls, floors, and material with equipment.
- § 1926.857 Storage.
- § 1926.858 Removal of steel construction.
- § 1926.859 Mechanical demolition.
- § 1926.860 Selective demolition by explosives.
Authority:
40 U.S.C. 3701; 29 U.S.C. 653, 655, 657; and Secretary of Labor's Orders 12–71 (36 FR 8754), 8–76 (41 FR 25059), 9–83 (48 FR 35736), 1–90 (55 FR 9033), 6–96 (62 FR 111), 5–2007 (72 FR 31159), or 1–2012 (77 FR 3912), as applicable.