30 CFR Subpart E - Subpart E—Field Approval of Electrically Operated Mining Equipment
prev | next
- § 18.90 Purpose.
- § 18.91 Electric equipment for which field approvals will be issued.
- § 18.92 Quality of material and design.
- § 18.93 Application for field approval; filing procedures.
- § 18.94 Application for field approval; contents of application.
- § 18.95 Approval of machines constructed of components approved, accepted or certified under Bureau of Mines Schedule 2D, 2E, 2F, or 2G.
- § 18.96 Preparation of machines for inspection; requirements.
- § 18.97 Inspection of machines; minimum requirements.
- § 18.98 Enclosures, joints, and fastenings; pressure testing.
- § 18.99 Notice of approval or disapproval; letters of approval and approval plates.
Source:
36 FR 7007, Apr. 13, 1971, unless otherwise noted.