33 CFR § 147.T01-0073 - Safety Zones; South Fork Wind Farm Project Area, Outer Continental Shelf, Lease OCS-A 0517, Offshore Rhode Island, Atlantic Ocean.
(a) Description. The area within 500-meters of the center point of the positions (North American Datum of 1983 (NAD83)) provided in the following table is a safety zone:
Table 1 to Paragraph (a)
Name | Facility type | Latitude | Longitude |
---|---|---|---|
AM05 | WTG | N 41.10879493 | W−71.19110374 |
AM06 | WTG | N 41.10921219 | W−71.16906236 |
AM07 | WTG | N 41.10962524 | W−71.14702052 |
AM08 | WTG | N 41.11003408 | W−71.12497822 |
AN05 | WTG | N 41.09212418 | W−71.19054951 |
AN06 | WTG | N 41.09195639 | W−71.16788437 |
AN08 | WTG | N 41.09336261 | W−71.12444068 |
AN09 | WTG | N 41.093767 | W−71.1024035 |
AP05 | WTG | N 41.07545338 | W−71.18999573 |
AP06 | OSS | N 41.07587016 | W−71.16796548 |
AP07 | WTG | N 41.07628273 | W−71.14593476 |
AP08 | WTG | N 41.07669109 | W−71.12390359 |
AP09 | WTG | N 41.07709524 | W−71.10187197 |
(b) Definitions. As used in this section, designated representative means a Coast Guard Patrol Commander, including a Coast Guard coxswain, petty officer, or other officer operating a Coast Guard vessel and a Federal, State, and local officer designated by or assisting the First Coast Guard District Commander in the enforcement of the safety zones.
(c) Regulations. No vessel may enter or remain in the safety zone in paragraph (a) of this section except for the following:
(1) An attending vessel as defined in § 147.20; and
(2) A vessel authorized by the First Coast Guard District Commander or a designated representative.
(d) Request for permission. Persons or vessels seeking to enter the safety zone must request authorization from the First Coast Guard District Commander or a designated representative. If permission is granted, all persons and vessels must comply with lawful instructions of the First Coast Guard District Commander or designated representative via VHF-FM channel 16 or by phone at 866-842-1560 (First Coast Guard District Command Center).
(e) Effective and enforcement periods. This section is effective from January 1, 2024, through 11:59 p.m. on May 31, 2024. But it will only be enforced during active construction or other instances which may cause a hazard to navigation deemed necessary by the First Coast Guard District Commander. The First Coast Guard District Commander will make notification of the exact dates and times in advance of each enforcement period for the locations in paragraph (a) of this section to the local maritime community through the Local Notice to Mariners and will issue a Broadcast Notice to Mariners via marine channel 16 (VHF-FM) as soon as practicable in response to an emergency. If the project is completed before May 31, 2024, enforcement of the safety zones will be suspended, and notice given via Local Notice to Mariners. The First Coast Guard District Local Notice to Mariners can be found at: https://www.navcen.uscg.gov.