33 CFR Subpart B - Subpart B—Waterfront Facilities Handling Liquefied Natural Gas
- § 127.101 Design and construction: General.
- § 127.103 Piers and wharves.
- § 127.105 Layout and spacing of marine transfer area for LNG.
- § 127.107 Electrical power systems.
- § 127.109 Lighting systems.
- § 127.111 Communications systems.
- § 127.113 Warning signs.
-
Equipment (§§ 127.201 - 127.207)
-
Operations (§§ 127.301 - 127.321)
- § 127.301 Persons in charge of shoreside transfer operations: Qualifications and certification.
- § 127.303 Compliance with suspension order.
- § 127.305 Operations Manual.
- § 127.307 Emergency Manual.
- § 127.309 Operations Manual and Emergency Manual: Use.
- § 127.311 Motor vehicles.
- § 127.313 Bulk storage.
- § 127.315 Preliminary transfer inspection.
- § 127.317 Declaration of inspection.
- § 127.319 LNG transfer.
- § 127.321 Release of LNG.
-
Maintenance (§§ 127.401 - 127.409)
-
Personnel Training (§§ 127.501 - 127.503)