40 CFR Appendix Table 3 to Subpart F of Part 63 - Table 3 to Subpart F of Part 63—General Provisions Applicability to Subparts F, G, and H a to Subpart F
Table 3 to Subpart F of Part 63—General Provisions Applicability to Subparts F, G, and H
a to Subpart F
Reference | Applies to subparts F, G, and H | Comment |
---|---|---|
63.1(a)(1) | Yes | Overlap clarified in § 63.101, § 63.111, § 63.161. |
63.1(a)(2) | Yes | |
63.1(a)(3) | Yes | § 63.110 and § 63.160(b) of subparts G and H identify which standards are overridden. |
63.1(a)(4) | No | Subpart F specifies applicability of each paragraph in subpart A to subparts F, G, and H. |
63.1 (a)(5)-(a)(9) | No | |
63.1(a)(10) | No | Subparts F, G, and H specify calendar or operating day. |
63.1(a)(11) | No | Subpart F § 63.103(d) specifies acceptable methods for submitting reports. a |
63.1 (a)(12)-(a)(14) | Yes | |
63.1(b)(1) | No | Subpart F specifies applicability. |
63.1(b)(2) | Yes | |
63.1(b)(3) | No | |
63.1(c)(1) | No | Subpart F specifies applicability. |
63.1(c)(2) | No | Area sources are not subject to subparts F, G, and H. |
63.1(c)(3) | No | |
63.1(c)(4) | Yes | |
63.1(c)(5) | No | Subparts G and H specify applicable notification requirements. |
63.1(c)(6) | Yes | |
63.1(d) | No | |
63.1(e) | No | Subparts F, G, and H established before permit program. |
63.2 | Yes | Subpart F § 63.101(a) specifies those subpart A definitions that apply to the HON. Subpart F definition of “source” is equivalent to subpart A definition of “affected source.” |
63.3 | No | Units of measure are spelled out in subparts F, G, and H. |
63.4 (a)(1)-(a)(3) | Yes | |
63.4(a)(4) | No | This is a reserved paragraph in subpart A of part 63. |
63.4(a)(5) | Yes | |
63.4(b) | Yes | |
63.4(c) | Yes | |
63.5(a)(1) | Yes | Except the terms “source” and “stationary source” in § 63.5(a)(1) should be interpreted as having the same meaning as “affected source.” |
63.5(a)(2) | Yes | |
63.5(b)(1) | Yes | Except § 63.100(l) defines when construction or reconstruction is subject to standards for new sources. |
63.5(b)(2) | No | This is a reserved paragraph in subpart A of part 63. |
63.5(b)(3) | Yes | |
63.5(b)(4) | Yes | Except the cross reference to § 63.9(b) is limited to § 63.9(b) (4) and (5). Subpart F overrides § 63.9 (b)(1) through (b)(3). |
63.5(b)(5) | Yes | |
63.5(b)(6) | Yes | Except § 63.100(l) defines when construction or reconstruction is subject to standards for new sources. |
63.5(c) | No | This is a reserved paragraph in subpart A of part 63. |
63.5(d)(1)(i) | No | For subpart G, see § 63.151(b) (2)(ii) and (2)(iii) for the applicability and timing of this submittal; for subpart H, see § 63.182(b) (2)(ii) and (b)(2)(iii) for applicability and timing of this submittal. |
63.5(d)(1)(ii) | Yes | Except § 63.5(d)(1)(ii)(H) does not apply. |
63.5(d)(1)(iii) | No | Subpart G requires submittal of the Notification of Compliance Status in § 63.152(b); subpart H specifies requirements in § 63.182(c). |
63.5(d)(2) | No | |
63.5(d)(3) | Yes—subpart G No—subpart H | Except § 63.5(d)(3)(ii) does not apply to subpart G. |
63.5(d)(4) | Yes | |
63.5(e) | Yes | |
63.5(f)(1) | Yes | |
63.5(f)(2) | Yes | Except the cross-reference to § 63.5(d)(1) is changed to § 63.151(b)(2)(ii) of subpart G and to § 63.182(b)(2)(ii) of subpart H. The cross-reference to § 63.5(b)(2) does not apply. |
63.6(a) | Yes | |
63.6(b)(1) | No | Subparts F and H specify compliance dates for sources subject to subparts F, G, and H. |
63.6(b)(2) | No | |
63.6(b)(3) | Yes | |
63.6(b)(4) | No | May apply when standards are proposed under Section 112(f) of the Clean Air Act. |
63.6(b)(5) | No | Subparts G and H include notification requirements. |
63.6(b)(6) | No | |
63.6(b)(7) | No | |
63.6(c)(1) | No | Subpart F specifies the compliance dates for subparts G and H. |
63.6(c)(2) | No | |
63.6(c)(3) | No | |
63.6(c)(4) | No | |
63.6(c)(5) | Yes | |
63.6(d) | [Reserved] | |
63.6(e) | Yes c | Except as otherwise specified for individual paragraphs. Does not apply to Group 2 emission points unless they are included in an emissions average. bc |
63.6(e)(1)(i) | No | This is addressed by § 63.102(a)(4) and (f) of subpart F. |
63.6(e)(1)(ii) | Yes, before July 15, 2027. No, beginning on and after July 15, 2027 | |
63.6(e)(1)(iii) | Yes | |
63.6(e)(2) | [Reserved] | |
63.6(e)(3)(i) | Yes, before July 15, 2027. No, beginning on and after July 15, 2027 | |
63.6(e)(3)(i)(A) | No | This is addressed by § 63.102(a)(4). |
63.6(e)(3)(i)(B) | Yes, before July 15, 2027. No, beginning on and after July 15, 2027 | |
63.6(e)(3)(i)(C) | Yes, before July 15, 2027. No, beginning on and after July 15, 2027 | |
63.6(e)(3)(ii) | [Reserved] | |
63.6(e)(3)(iii) | No | Recordkeeping and reporting are specified in § 63.103(c)(2) of subpart F and § 63.152(d)(1) of subpart G. |
63.6(e)(3)(iv) | No | Recordkeeping and reporting are specified in § 63.103(c)(2) of subpart F and § 63.152(d)(1) of subpart G. |
63.6(e)(3)(v) | No | Records retention requirements are specified in § 63.103(c). |
63.6(e)(3)(vi) | Yes, before July 15, 2027. No, beginning on and after July 15, 2027 | |
63.6(e)(3)(vii) | Yes, before July 15, 2027. No, beginning on and after July 15, 2027 | |
63.6(e)(3)(viii) | Yes, before July 15, 2027. No, beginning on and after July 15, 2027 | |
63.6(e)(3)(ix) | Yes, before July 15, 2027. No, beginning on and after July 15, 2027 | |
63.6(f)(1) | No | § 63.102(a) and (e) of subpart F specifies when the standards apply. |
63.6(f)(2)(i) | Yes | |
63.6(f)(2)(ii) | Yes—subpart G No—subpart H | § 63.152(c)(2) of subpart G specifies the use of monitoring data in determining compliance with subpart G. |
63.6(f)(2)(iii) (A), (B), and (C) | Yes | |
63.6(f)(2)(iii)(D) | No | |
63.6(f)(2)(iv) | Yes | |
63.6(f)(2)(v) | Yes | |
63.6(f)(3) | Yes | |
63.6(g) | No | Procedures specified in § 63.102(b) of subpart F. |
63.6(h) | No | |
63.6(i)(1) | Yes | |
63.6(i)(2) | Yes | |
63.6(i)(3) | No | For subpart G, § 63.151(a)(6) specifies procedures; for subpart H, § 63.182(a)(6) specifies procedures. |
63.6(i)(4)(i)(A) | Yes | |
63.6(i)(4)(i)(B) | No | Dates are specified in § 63.151(a)(6)(i) of subpart G and § 63.182(a)(6)(i) of subpart H. |
63.6(i)(4)(ii) | No | |
63.6(i) (5)-(14) | Yes | |
63.6(i)(15) | No | |
63.6(i)(16) | Yes | |
63.6(j) | Yes | |
63.7(a)(1) | No | Subparts F, G, and H specify required testing and compliance demonstration procedures. |
63.7(a)(2) | No | For subpart G, test results must be submitted in the Notification of Compliance Status due 150 days after compliance date, as specified in § 63.152(b); for subpart H, all test results subject to reporting are reported in periodic reports. |
63.7(a)(3) | Yes | |
63.7(a)(4) | Yes | |
63.7(b) | No | |
63.7(c) | No | |
63.7(d) | Yes | |
63.7(e)(1) | Yes, before July 15, 2027. No, beginning on and after July 15, 2027 | See § 63.103(b)(3). |
63.7(e)(2) | Yes | |
63.7(e)(3) | No | Subparts F, G, and H specify test methods and procedures. |
63.7(e)(4) | Yes | |
63.7(f) | Yes | |
63.7(g) | No | Performance test reporting specified in § 63.152(b) of subpart G: Not applicable to subpart H because no performance test required by subpart H. |
63.7(h)(1) | Yes | |
63.7(h)(2) | Yes | |
63.7(h)(3) | No | § 63.103(b)(5) of subpart F specifies provisions for requests to waive performance tests. |
63.7(h)(4) | No | |
63.7(h)(5) | Yes | |
63.8(a)(1) | Yes | |
63.8(a)(2) | No | |
63.8(a)(3) | [Reserved] | |
63.8(a)(4) | Yes, except for flares subject to § 63.108 | |
63.8(b)(1) | Yes | |
63.8(b)(2) | No | Subparts G and H specify locations to conduct monitoring. |
63.8(b)(3) | Yes | |
63.8(c)(1)(i) | Yes, before July 15, 2027. No, beginning on and after July 15, 2027 | |
63.8(c)(1)(ii) | No | For subpart G, submit as part of periodic report required by § 63.152(c); for subpart H, retain as required by § 63.181(g)(2)(ii). |
63.8(c)(1)(iii) | Yes, before July 15, 2027. No, beginning on and after July 15, 2027 | |
63.8(c)(2) | Yes | |
63.8(c)(3) | Yes | |
63.8(c)(4) | No | Subpart G specifies monitoring frequency by kind of emission point and control technology used (e.g., § 63.111, § 63.120(d)(2), § 63.143, and § 63.152(f)); subpart H does not require use of continuous monitoring systems. |
63.8 (c)(5)-(c)(8) | No | |
63.8(d) | No | |
63.8(e) | No | |
63.8 (f)(1)-(f)(3) | Yes | |
63.8(f)(4)(i) | No | Timeframe for submitting request specified in § 63.151(f) or (g) of subpart G; not applicable to subpart H because subpart H specifies acceptable alternative methods. |
63.8(f)(4)(ii) | Yes | |
63.8(f)(4)(iii) | No | |
63.8(f)(5)(i) | Yes | |
63.8(f)(5)(ii) | No | |
63.8(f)(5)(iii) | Yes | |
63.8(f)(6) | No | Subparts G and H do not require continuous emission monitoring. |
63.8(g) | No | Data reduction procedures specified in § 63.152(f) and (g) of subpart G; not applicable to subpart H. |
63.9(a) | Yes | |
63.9(b)(1) | No | Specified in § 63.151(b)(2) of subpart G; specified in § 63.182(b) of subpart H. |
63.9(b)(2) | No | Initial Notification provisions are specified in § 63.151(b) of subpart G; in § 63.182(b) of subpart H. |
63.9(b)(3) | No | |
63.9(b)(4) | Yes | Except that the notification in § 63.9(b)(4)(i) shall be submitted at the time specified in § 63.151(b)(2)(ii) of subpart G; in § 63.182(b)(2) of subpart H. |
63.9(b)(5) | Yes | Except that the notification in § 63.9(b)(5) shall be submitted at the time specified in § 63.151(b)(2)(ii) of subpart G; in § 63.182 (b)(2) of subpart H. |
63.9(c) | Yes | |
63.9(d) | Yes | |
63.9(e) | No | |
63.9(f) | No | |
63.9(g) | No | |
63.9(h) | No | § 63.152(b) of subpart G and § 63.182 (c) of subpart H specify Notification of Compliance Status requirements. |
63.9(i) | Yes | |
63.9(j) | Yes | Only as related to change to major source status. |
63.9(k) | Yes | |
63.10(a) | Yes | |
63.10(b)(1) | No | § 63.103(c) of subpart F specifies record retention requirements. |
63.10(b)(2) | No | § 63.103(c) of subpart F specifies required records. |
63.10(b)(3) | No | |
63.10(c) | No | |
63.10(d)(1) | No | |
63.10(d)(2) | No | § 63.152(b) of subpart G specifies performance test reporting; not applicable to subpart H. |
63.10(d)(3) | No | |
63.10(d)(4) | Yes | |
63.10(d)(5) | Yes, before July 15, 2027. No, beginning on and after July 15, 2027 | Except that, before July 15, 2027, reports required by § 63.10(d)(5) shall be submitted at the time specified in § 63.152(d) of subpart G and in § 63.182(d) of subpart H. |
63.10(e) | No | |
63.10(f) | Yes | |
63.11-63.15 | Yes, except 63.11(b) does not apply to flares subject to § 63.108 |
a Wherever subpart A specifies “postmark” dates, submittals may be sent by methods other than the U.S. Mail (e.g., by fax or courier). Submittals shall be sent by the specified dates, but a postmark is not necessarily required.
b Except as specified in footnote c of this table, the plan, and any records or reports of start-up, shutdown, and malfunction do not apply to Group 2 emission points unless they are included in an emissions average.
c On and after July 15, 2027, footnote b of this table does not apply and the row for the “63.6(e)” entry of this table is no longer applicable.
[62 FR 2737, Jan. 17, 1997, as amended at 71 FR 20456, Apr. 20, 2006; 85 FR 73887, Nov. 19, 2020; 89 FR 43174, May 16, 2024]