40 CFR Appendix Table 4 to Subpart BB of Part 63 - Table 4 to Subpart BB of Part 63—Operating Parameters, Operating Limits and Data Monitoring, Recordkeeping and Compliance Frequencies
Table 4 to Subpart BB of Part 63—Operating Parameters, Operating Limits and Data Monitoring, Recordkeeping and Compliance Frequencies
For the operating parameter applicable to you, as specified in Table 3 . . . | You must establish the following operating limit during your performance test . . . | And you must monitor, record, and demonstrate continuous compliance using these minimum frequencies . . . | ||
---|---|---|---|---|
Data measurement | Data recording | Data averaging
period for compliance |
||
|
||||
Influent liquid flow | Minimum inlet liquid flow | Continuous | Every 15 minutes | Daily. |
Influent liquid flow rate and gas stream flow rate | Minimum influent liquid-to-gas ratio a | Continuous | Every 15 minutes | Daily. |
For the operating parameter applicable to you, as specified in Table 3 | You must establish the following operating limit | And you must monitor, record, and demonstrate continuous compliance using these minimum frequencies . . . | ||
Data measurement | Data recording | Data averaging
period for compliance. |
||
Pressure drop | Pressure drop range | Continuous | Every 15 minutes | Daily. |
|
||||
Sorbent injection rate | Minimum injection rate | Continuous | Every 15 minutes | Daily. |
Sorbent injection carrier gas flow rate | Minimum carrier gas flow rate | Continuous | Every 15 minutes | Daily. |
|
||||
Alarm time | Maximum alarm time is not established on a site-specific basis but is specified in § 63.605(f)(9) | Continuous | Each date and time of alarm start and stop | Maximum alarm time specified in § 63.605(f)(9). |
|
||||
Secondary voltage | Secondary voltage range | Continuous | Every 15 minutes | Daily. |
[82 FR 45201, Sept. 28, 2017]