46 CFR Subpart 32.60 - Subpart 32.60—Hull Requirements for Tank Vessels Constructed On or After July 1, 1951
- § 32.60-1 Scantlings, material, and workmanship—TB/ALL.
- § 32.60-5 Subdivision of cargo space—TB/ALL.
- § 32.60-10 Segregation of cargo; Grade A, B, C, or D—TB/ALL.
- § 32.60-15 Segregation of cargo; Grade E—TB/ALL.
- § 32.60-20 Pumprooms on tank vessels carrying Grade A, B, C, D and/or E liquid cargo—TB/ALL.
- § 32.60-25 Living quarters—TB/ALL.
- § 32.60-30 Tank vessels with independent tanks—TB/ALL.
- § 32.60-35 Tank vessels carrying Grade A liquid cargo—TB/ALL.
- § 32.60-40 Construction and testing of cargo tanks and bulkheads—TB/ALL.
- § 32.60-45 Segregation of spaces containing the emergency source of electric power—TB/ALL.
Note:
Requirements for double hull construction for vessels carrying oil, as defined in 33 CFR 157.03, in bulk as cargo are found in 33 CFR 157.10d.