Ala. Admin. Code r. 400-1-6-.03 - Initial Bottom Hole Pressure Survey
Unless otherwise specified by the Supervisor, an operator completing a well in a new oil or gas pool shall perform an initial bottom hole pressure survey on said pool prior to receiving a temporary allowable from the Supervisor. The bottom hole pressure survey shall be performed with a bottom hole pressure gauge and results of the survey shall be reported to the Supervisor. The bottom hole pressure survey shall be conducted for at least twenty-four (24) hours and in accordance with industry standards.
Author: State Oil and Gas Board
Notes
Statutory Authority: Code of Ala. 1975, ยงยง 9-17-1, et seq.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.