Ala. Admin. Code r. 400-1-6-.05 - Procedures For Multiple Completions
(1) Information shall be submitted to the
Supervisor for approval showing the top and bottom of all zones proposed for
completion, including a partial electrical log and a diagrammatic sketch
showing such zones and equipment to be used.
(2) If zones approved for multiple completion
become intercommunicated, the operator shall, after obtaining approval from the
Supervisor, immediately repair the well so as to separate such zones.
Author: State Oil and Gas Board