18 AAC 32.220 - Permit requirements
(a) A person may not produce cheese or cheese
products subject to
18 AAC 32.210 -
18 AAC 32.295 except as authorized
by permit under this section.
(b) A
permit issued under this section
(1) is valid
for one year
(2) is issued to a
particular cheese producer and is not transferable;
(3) is subject to modification, suspension,
revocation, or reinstatement under
18 AAC 32.285; and
(4) must be prominently posted for public
view in the facility.
(c) At least 30 days before commencing
construction of a cheese production facility, initiating cheese or cheese
product production, or changing ownership, a cheese producer must apply for a
permit for each operation subject to the requirements of this section, using a
form provided by the department. The application must
(1) be accompanied by a permit fee as set out
in 18 AAC 32.295;
(2) include
(A) a plot plan of the premises showing the
location of buildings and property boundaries;
(B) plumbing schematics that depict hot and
cold potable water lines, nonpotable water lines, wastewater lines, and floor
drains;
(C) building floor plans
depicting locations of equipment, plumbing fixtures, toilets, and
sinks;
(D) Finish material
specifications for floors, walls, and ceilings;
(E) types and locations of lighting and
ventilation;
(F) a general
description of types of cheese products and processing methods; and
(G) other information required by the
department to demonstrate compliance with
18 AAC 32.225 -
18 AAC 32.265.
(d) If applying for an
annual renewal of a permit for continuing operations, a cheese producer may
submit, subject to department approval and in place of the information required
by (c)(2) of this section, a written statement that changes to the facility or
its operations have not occurred, and that changes are not intended for the
next year.
(e) A cheese producer
shall notify the department of any change to the facility or operations
authorized by a permit. Based on whether the change complies with
18 AAC 32.225 -
18 AAC 32.265, the department will
approve, conditionally approve, or deny a change. An application for a permit
or an annual permit renewal must reflect each prior change to the facility or
operations