18 AAC 32.220 - Permit requirements

(a) A person may not produce cheese or cheese products subject to 18 AAC 32.210 - 18 AAC 32.295 except as authorized by permit under this section.
(b) A permit issued under this section
(1) is valid for one year
(2) is issued to a particular cheese producer and is not transferable;
(3) is subject to modification, suspension, revocation, or reinstatement under 18 AAC 32.285; and
(4) must be prominently posted for public view in the facility.
(c) At least 30 days before commencing construction of a cheese production facility, initiating cheese or cheese product production, or changing ownership, a cheese producer must apply for a permit for each operation subject to the requirements of this section, using a form provided by the department. The application must
(1) be accompanied by a permit fee as set out in 18 AAC 32.295;
(2) include
(A) a plot plan of the premises showing the location of buildings and property boundaries;
(B) plumbing schematics that depict hot and cold potable water lines, nonpotable water lines, wastewater lines, and floor drains;
(C) building floor plans depicting locations of equipment, plumbing fixtures, toilets, and sinks;
(D) Finish material specifications for floors, walls, and ceilings;
(E) types and locations of lighting and ventilation;
(F) a general description of types of cheese products and processing methods; and
(G) other information required by the department to demonstrate compliance with 18 AAC 32.225 - 18 AAC 32.265.
(d) If applying for an annual renewal of a permit for continuing operations, a cheese producer may submit, subject to department approval and in place of the information required by (c)(2) of this section, a written statement that changes to the facility or its operations have not occurred, and that changes are not intended for the next year.
(e) A cheese producer shall notify the department of any change to the facility or operations authorized by a permit. Based on whether the change complies with 18 AAC 32.225 - 18 AAC 32.265, the department will approve, conditionally approve, or deny a change. An application for a permit or an annual permit renewal must reflect each prior change to the facility or operations

Notes

18 AAC 32.220
Eff. 12/3/2010, Register 196

Authority:AS 03.05.011

AS 03.05.040

AS 17.20.005

AS 44.46.020

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.