3 CCR 710-1.5 - INCORPORATION BY REFERENCE

This Rule is promulgated pursuant to sections 12-20-204, 12-115-107(2)(a), and 24-4-103 (12.5), C.R.S.

A. The Board hereby incorporates by reference the National Fire Protection Association standard number 70, hereafter known as the National Electrical Code, 2023 Edition, and as may be amended by the Board. These standards are incorporated by reference as the minimum standards governing the planning, laying out, and installing or the making of additions, alterations, and repairs in the installation of wiring apparatus and equipment for electric light, heat, and power in this state. This Rule does not include later amendments to or editions of the National Electrical Code, 2023 Edition. The effective date shall be August 1, 2023. The incorporated code is available for public inspection at 1560 Broadway, Suite 1350, Denver, CO, 80202.
B. A copy of the provisions of the National Electrical Code, 2023 edition is available for public inspection during regular business hours at the Board office at the Division of Professions and Occupations, Department of Regulatory Agencies, 1560 Broadway, Suite 110, Denver, Colorado, 80202, and at any state publications depository library. For further information regarding how this material can be obtained or examined, contact the Program Director for the Board ("Program Director") at 1560 Broadway, Suite 110, Denver, Colorado, 80202, (303) 894-2300. The National Electric Code, 2023 Edition, is available directly from the National Fire Protection Association (NFPA), 1 Batterymarch Park, Quincy MA 02169-7471, phone 1-800-344 -3555. Copies are also available from the NFPA website at NFPA.org, as well as most online and retail book vendors.
C. Pursuant to section 12-115-107(3), C.R.S., on or after March 1, 2024, a permit applicant for electric vehicle (EV) power transfer infrastructure must comply with the requirements of section 12-115-107(3), C.R.S., and the Colorado Energy Office's EV power transfer infrastructure requirements for multifamily buildings found in the Model Electric Ready and Solar Ready Code.

The Model Electric Ready and Solar Ready Code can be accessed through the Colorado Energy Office within the Energy Policy sections at energyoffice.colorado.gov/. For further information regarding how this material can be obtained or examined, contact the Program Director for the Board ("Program Director") at 1560 Broadway, Suite 110, Denver, Colorado, 80202, (303) 894-2300.

Notes

3 CCR 710-1.5
40 CR 04, February 25, 2017, effective 3/17/2017 40 CR 08, April 25, 2017, effective 6/1/2017 40 CR 12, June 25, 2017, effective 7/15/2017 41 CR 04, February 25, 2018, effective 3/17/2018 41 CR 20, October 25, 2018, effective 11/14/2018 43 CR 12, June 25, 2020, effective 7/15/2020 44 CR 12, June 25, 2021, effective 7/15/2021 44 CR 21, November 10, 2021, effective 11/30/2021 45 CR 12, June 25, 2022, effective 7/15/2022 45 CR 21, November 10, 2022, effective 11/30/2022 46 CR 13, July 10, 2023, effective 7/30/2023 46 CR 16, August 25, 2023, effective 7/26/2023 (EMERGENCY) 46 CR 20, October 25, 2023, effective 11/14/2023

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.