Conn. Agencies Regs. § 26-141a-5 - Filing requirements
(a) Operators of
existing impoundments or diversions subject to these regulations shall file the
following information within twelve (12) months after the effective date of
these regulations. Operators of new impoundments or diversions subject to these
regulations shall file such information three (3) months before the start of
operation of such facilities.
(1) Name of
structure; name, address and telephone number of owner and operator; location
of structure on U.S. Geological Survey topographic map; purpose and use of
structure; location of discharge.
(2) Drainage area above structure; reservoir
capacity at various elevations; stream flow records; the safe yield of the
facility; demand requirements.
(3)
Frequency of recurrence of water surface elevations on the first day of each
calendar month. Such water surface elevations and the frequency of occurrence
may be corrected to what they would have been under conditions of current
demand and current diversion requirements.
(4) Type, capacity and control capability of
all discharge devices.
When two or more structures are operated as a single facility and the safe yield is interdependent, the method of operation shall be described, including the anticipated method of compliance with the requirements of Section 26-141a-6.
(b) Such data for new
structures or for existing structures when not available from records shall be
computed by standard engineering methods which methods shall be clearly
outlined in the submission and approved by the Commissioner.
(c) Operators shall, within sixty (60) days,
report any changes in data provided in accordance with this section.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.