Ga. Comp. R. & Regs. R. 110-2-8-.05 - Building System Approval Application
Application to the Commissioner for building system approval shall include:
(1) A minimum of one
electronic set of documentation prepared by an architect or engineer licensed
to practice in the state of Georgia, except as exempted by law, quality control
manuals, calculations and any required test results for each system to be
approved. The manufacturer's evaluation agency shall approve or disapprove the
manufacturer's submittal and, if the submittal is approved, shall affix a stamp
authorized by the Commissioner on each plan print and the table of contents of
the supporting data in manual form. The table of contents or index shall
identify each sheet contained in the manual by sheet number and date. The seal
of an architect and/or engineer shall be by electronic means unless otherwise
prohibited by law or regulation; and
(2) Specifications of all materials,
equipment and devices to be used,
(3) Specifications and typical details for
methods of incorporating materials, equipment and devices into a
building,
(4) Calculations and/or
tests required to substantiate the system design or any variance from the
prescriptive requirements of the codes,
(5) Typical details in sufficient clarity to
show compliance with the codes. Such information shall be specific, and the
codes shall not be cited as a whole or in part, nor shall the term "approved"
or its equivalent be used as a substitute for specific information.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.