Ga. Comp. R. & Regs. R. 120-3-7-.06 - In-Plant Primary Inspection Agency (IPIA) Inspection Procedures; Disagreements With Procedures
(1) Inspections of manufactured homes by the
IPIA or the Commissioner's designee will be conducted pursuant to Subpart H of
the U.S. Department of Housing and Urban Development's "Manufactured Homes
Procedural and Enforcement Regulations" (24 C.F.R. 3282.351,
adopted May 11, 1976, as amended).
(2) Whenever a manufacturer disagrees with a
finding by an IPIA acting in accord with Subpart H, the manufacturer may
request a Presentation of Views or a Hearing as hereafter provided in Rule
120-3-7-.10 of these Rules and
Regulations
(3) Fees in connection
with permitting of new manufactured housing plants in Georgia will be in
accordance with the following schedule:
º Initial five-day (40-hour) inspection period ........$5,000
º Second five-day (40-hour) inspection period.......$5,000
º Third five-day (40-hour) inspection period..........$5,000
º Fourth five-day (40-hour) inspection period........$5,000 PER DAY
(4) If certification is not completed after
four five-day inspection periods, the representatives of the manufacturer and
representatives of the Commissioner will arrange a meeting to evaluate the
inspection process.
(5) For any
inspection lasting longer than four five-day inspection periods, the
manufacturer will be responsible for additional fees incurred by the
inspectors, including cost lodging and per diem costs.