Haw. Code R. § 13-277-5 - Interim protection measures
Interim protection measures shall protect the significant historic property and its buffer zone during construction activities. Interim measures may include:
(1) Flagging the
perimeter of the buffer zone;
(2)
Erecting barriers (such as plastic fencing) along the buffer zone;
(3) Placing avoidance instructions on
construction plans and specifications;
(4) On-site, pre-construction briefing of the
hired construction firm; and
(5)
Having an archaeological monitor on-site during ground alteration
activities.