Ill. Admin. Code tit. 35, § 301.411 - Total Maximum Daily Load
"Total Maximum Daily Load" or "TMDL" is the sum of the individual wasteload allocations for point sources and load allocations for nonpoint sources and natural background, as more fully defined at 40 CFR 130.2(i). A TMDL sets and allocates the maximum amount of a pollutant that may be introduced into a water body and still assure attainment and maintenance of water quality standards.
Notes
Added at 23 Ill. Reg. 11277, effective August 26, 1999
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.