Ill. Admin. Code tit. 35, § 725.982 - Schedule for Implementation of Air Emission Standards
a) This subsection (a) corresponds with
40 CFR
265.1082(a), which required
compliance before dates long past. This statement maintains structural
consistency with the corresponding federal rules.
b) An owner or operator of a facility or unit
in existence on the effective date of statutory or regulatory amendments under
the Act that render the facility subject to Subpart I, J, or K must meet the
following requirements:
1) The owner or
operator must install and begin operation of all control equipment required to
comply with this Subpart CC and complete modifications of production or
treatment processes to satisfy exemption criteria of Section
725.983(c)
by the effective date of the amendment, except as provided in subsection
(b)(2).
2) When control equipment
or waste management units required to comply with this Subpart CC cannot be
installed and begin operation or when modifications of production or treatment
processes to satisfy the exemption criteria of Section
725.983(c)
cannot be completed by the effective date of the amendment, the owner or
operator must undertake the following actions:
A) Install and begin operation of the control
equipment or waste management unit and complete modification of production or
treatment processes as soon as possible, but no later than 30 months after the
effective date of the amendment; and
B) Maintenance of Implementation Schedule
i) For facilities subject to the
recordkeeping requirements of Section
725.173, enter
and maintain the implementation schedule specified in subsection (a)(2)(B) in
the operating record no later than the effective date of the amendment,
or
ii) For facilities not subject
to Section 725.173, the owner or operator must enter and maintain the
implementation schedule specified in subsection (a)(2)(B) in a permanent,
readily available file located at the facility site no later than the effective
date of the amendment.
c) The owner or operator of a facility or
unit that becomes newly subject to the requirements of this Subpart CC due to
an action other than those described in subsection (b) must comply with all
applicable requirements immediately (i.e., the owner or operator must have
control devices installed and operating on the date the facility or unit
becomes subject to the requirements of this Subpart CC; the 30-month
implementation schedule does not apply to the owner or operator of such a
facility).
d) This subsection (d)
corresponds with
40 CFR
265.1082(d), which allowed
extension of a long-past compliance date. This statement maintains structural
consistency with the federal rule.
Notes
Amended at 29 Ill. Reg. 6389, effective April 22, 2005