Ill. Admin. Code tit. 35, § 811.303 - Design Period
a) The design
period for putrescible and chemical waste disposal units shall be the estimated
operating life plus a postclosure care period of 30 years. The design period
for putrescible waste landfill units, other than MSWLF units, may be reduced if
measures are undertaken in compliance with subsections (b) and (c) to encourage
stabilization of putrescible waste. The design period for a MSWLF unit may be
reduced in accordance with subsection (d).
b) The design period for a disposal unit
which accepts only putrescible waste in shredded from shall be the estimated
operating life plus 20 years of postclosure care.
c) The design period for a putrescible waste
disposal unit that recycles leachate in accordance with Section
811.309(f)
shall be the estimated operating life plus
20 years of postclosure care.
d) An
owner or operator of a MSWLF unit may petition the Board for an adjusted
standard pursuant to Section 28.1 of the Act and 35 Ill. Adm. Code 106.Subpart
G to reduce the minimum postclosure care specified in accordance with the
requirements Sections
811.111(c),
811.309(h),
811.310(c),
and
811.319(a).
Notes
Amended in R93-10 at 18 Ill. Reg. 1308, effective January 13, 1994
BOARD NOTE: Subsection (d) is derived from 40 CFR 258.61(b)(1).
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.