Ill. Admin. Code tit. 83, § 467.10 - Scope

The Illinois Large Distributed Energy Resources Interconnection Standard applies to any distributed energy resources (DER) facility operated in parallel with an electric public utility distribution company in Illinois and whose nameplate capacity is greater than 10 megavolt amperes (MVA) (a large DER facility), provided that the electric distribution system facilities to which the DER facility is proposed to interconnect are not subject to the jurisdiction or interconnection requirements of either the Federal Energy Regulatory Commission (FERC) or the applicable Regional Transmission Organization (RTO) (either Midwest Independent Transmission System Operator, Inc. (MISO) or PJM Interconnection, LLC (PJM)).

Notes

Ill. Admin. Code tit. 83, § 467.10
Amended at 46 Ill. Reg. 9788, effective 5/26/2022

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.