312 IAC 29-18-3 - Use of diverter systems or blowout prevention equipment

Authority: IC 14-10-2-4; IC 14-37-3

Affected: IC 14-37

Sec. 3.

When drilling a well for oil and gas purposes within one-half (½) mile of an underground gas storage reservoir, and to prevent loss of well control when drilling a well for oil and gas purposes through a storage formation, the operator shall use well control equipment and high pressure fittings attached to properly anchored and cemented casing strings adequate to withstand anticipated pressures as specified under 312 IAC 29-20-13(b) and 312 IAC 29-20-13(c).

Notes

312 IAC 29-18-3
Natural Resources Commission; 312 IAC 29-18-3; filed 12/1/2017, 10:35 a.m.: 20171227-IR-312160230FRA Readopted filed 1/17/2023, 1:53 p.m.: 20230215-IR-312220328RFA

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.