Rule 312 IAC 25-6 - Performance Standards

  1. § 312 IAC 25-6-1 - Coal exploration; applicability
  2. § 312 IAC 25-6-2 - Coal exploration; required documents
  3. § 312 IAC 25-6-3 - Coal exploration; performance standards
  4. § 312 IAC 25-6-4 - Coal exploration; permit requirements
  5. § 312 IAC 25-6-5 - Surface mining; applicability
  6. § 312 IAC 25-6-6 - Surface mining; signs and markers
  7. § 312 IAC 25-6-7 - Surface mining; coal recovery
  8. § 312 IAC 25-6-8 - Surface mining; casing and sealing drilled holes; general requirements
  9. § 312 IAC 25-6-9 - Surface mining; casing and sealing drilled holes; temporary
  10. § 312 IAC 25-6-10 - Surface mining; casing and sealing drilled holes; permanent
  11. § 312 IAC 25-6-11 - Surface mining; topsoil and subsoil
  12. § 312 IAC 25-6-12 - Hydrologic balance; general requirements
  13. § 312 IAC 25-6-12.5 - Hydrologic balance; application of ground water quality standards at surface coal mining and reclamation operations permitted under IC 14-34 on which coal extraction, including augering, coal processing, coal processing waste disposal, or spoil deposition, occurs after the effective date of this section, or on which disposal activity subject to IC 13-19-3-3 has occurred and the area is not fully released from the performance bond required by IC 14-34-6
  14. § 312 IAC 25-6-13 - Surface mining; hydrologic balance; water quality standards and effluent limitations
  15. § 312 IAC 25-6-14 - Hydrologic balance; diversion; general requirements
  16. § 312 IAC 25-6-15 - Hydrologic balance; diversions of perennial streams, intermittent streams, miscellaneous flows; supplemental requirements
  17. § 312 IAC 25-6-16 - Surface mining; hydrologic balance; sediment control measures
  18. § 312 IAC 25-6-17 - Surface mining; hydrologic balance; siltation structures
  19. § 312 IAC 25-6-18 - Hydrologic balance; discharge structures
  20. § 312 IAC 25-6-19 - Hydrologic balance; acid-forming and toxic-forming spoil
  21. § 312 IAC 25-6-20 - Surface mining; hydrologic balance; permanent and temporary impoundments
  22. § 312 IAC 25-6-21 - Hydrologic balance; ground water protection
  23. § 312 IAC 25-6-22 - Hydrologic balance; ground water recharge capacity protection
  24. § 312 IAC 25-6-23 - Surface mining; hydrologic balance; surface and ground water monitoring
  25. § 312 IAC 25-6-24 - Hydrologic balance; transfer of wells
  26. § 312 IAC 25-6-25 - Hydrologic balance; water rights and replacement
  27. § 312 IAC 25-6-26 - Hydrologic balance; water discharge into underground mine
  28. § 312 IAC 25-6-27 - Surface mining; hydrologic balance; siltation structures postmining rehabilitation; diversions, impoundments, and treatment facilities
  29. § 312 IAC 25-6-28 - Surface mining; hydrologic balance; stream buffer zone
  30. § 312 IAC 25-6-29 - Surface mining; explosives; general requirements
  31. § 312 IAC 25-6-30 - Surface mining; explosives; preblasting survey
  32. § 312 IAC 25-6-31 - Surface mining; explosives; publication of blasting schedule
  33. § 312 IAC 25-6-32 - Surface mining; explosives; blasting operations
  34. § 312 IAC 25-6-33 - Surface mining; explosives; records of blasting operations
  35. § 312 IAC 25-6-34 - Surface mining; disposal of excess spoil
  36. § 312 IAC 25-6-35 - Surface mining; protection of underground mines
  37. § 312 IAC 25-6-36 - Surface mining; coal mine waste; general requirements
  38. § 312 IAC 25-6-37 - Surface mining; coal mine waste; refuse piles; site inspection
  39. § 312 IAC 25-6-38 - Coal processing waste; refuse piles; water control measures
  40. § 312 IAC 25-6-39 - Surface mining; coal mine waste; refuse piles; construction requirements
  41. § 312 IAC 25-6-40 - Coal processing waste; burning
  42. § 312 IAC 25-6-41 - Coal processing waste; return to underground workings
  43. § 312 IAC 25-6-42 - Disposal of noncoal wastes
  44. § 312 IAC 25-6-43 - Surface mining; coal mine waste; dams and embankments; general requirements
  45. § 312 IAC 25-6-44 - Coal processing waste; dams and embankments; site preparation
  46. § 312 IAC 25-6-45 - Surface mining; coal mine waste; dams and embankments; design and construction
  47. § 312 IAC 25-6-46 - Surface mining; protection of fish, wildlife, and related environmental values
  48. § 312 IAC 25-6-47 - Surface mining; slides and other damage
  49. § 312 IAC 25-6-48 - Surface mining; contemporaneous reclamation
  50. § 312 IAC 25-6-49 - Surface mining; backfilling and grading; timing limitations
  51. § 312 IAC 25-6-50 - Surface mining; backfilling and grading; general requirements
  52. § 312 IAC 25-6-51 - Surface mining; stabilization of surface areas
  53. § 312 IAC 25-6-52 - Surface mining; backfilling and grading; thick overburden
  54. § 312 IAC 25-6-53 - Surface mining; backfilling and grading; previously mined areas
  55. § 312 IAC 25-6-54 - Surface mining; revegetation; general requirements
  56. § 312 IAC 25-6-55 - Surface mining; revegetation; use of introduced species
  57. § 312 IAC 25-6-56 - Surface mining; revegetation; timing
  58. § 312 IAC 25-6-57 - Surface mining; revegetation; mulching and other soil stabilizing practices
  59. § 312 IAC 25-6-58 - Surface mining; revegetation; grazing
  60. § 312 IAC 25-6-59 - Surface mining; revegetation; standards for success for nonprime farmland
  61. § 312 IAC 25-6-60 - Revegetation; sampling techniques for nonprime farmland
  62. § 312 IAC 25-6-61 - Revegetation; statistical methodology
  63. § 312 IAC 25-6-62 - Cessation of operations; temporary
  64. § 312 IAC 25-6-63 - Cessation of operations; permanent
  65. § 312 IAC 25-6-64 - Postmining land use
  66. § 312 IAC 25-6-65 - Surface mining; roads
  67. § 312 IAC 25-6-66 - Surface mining; primary roads
  68. § 312 IAC 25-6-67 - Surface mining; other transportation facilities
  69. § 312 IAC 25-6-68 - Support facilities and utility installations
  70. § 312 IAC 25-6-69 - Surveyor corner markers; replacement
  71. § 312 IAC 25-6-70 - Underground mining; applicability
  72. § 312 IAC 25-6-71 - Underground mining; signs and markers
  73. § 312 IAC 25-6-72 - Underground mining; casing and sealing exposed underground openings; general requirements
  74. § 312 IAC 25-6-73 - Underground mining; casing and sealing exposed underground openings; temporary
  75. § 312 IAC 25-6-74 - Underground mining; casing and sealing exposed underground openings; permanent
  76. § 312 IAC 25-6-75 - Underground mining; topsoil and subsoil
  77. § 312 IAC 25-6-76 - Underground mining; hydrologic balance; general requirements
  78. § 312 IAC 25-6-76.5 - Underground mining; hydrologic balance; application of ground water quality standards at underground coal mining and reclamation operations permitted under IC 14-34 on which coal extraction, coal processing, coal processing waste disposal, or underground development waste and spoil deposition occurs after the effective date of this section, or on which disposal activity subject to IC 13-19-3-3 has occurred and the area is not fully released from the performance bond required by IC 14-34-6
  79. § 312 IAC 25-6-77 - Underground mining; hydrologic balance; water quality standards and effluent limitations
  80. § 312 IAC 25-6-78 - Underground mining; hydrologic balance; diversions; general requirements
  81. § 312 IAC 25-6-79 - Underground mining; hydrologic balance; diversions of perennial streams, intermittent streams with a watershed greater than one square mile, miscellaneous flows; stream channel diversions; supplemental requirements
  82. § 312 IAC 25-6-80 - Underground mining; hydrologic balance; sediment control measures
  83. § 312 IAC 25-6-81 - Underground mining; hydrologic balance; siltation structures
  84. § 312 IAC 25-6-82 - Underground mining; hydrologic balance; discharge structures
  85. § 312 IAC 25-6-83 - Underground mining; hydrologic balance; acid-forming and toxic-forming materials
  86. § 312 IAC 25-6-84 - Underground mining; hydrologic balance; permanent and temporary impoundments
  87. § 312 IAC 25-6-85 - Underground mining; hydrologic balance; underground mine entry and access discharges
  88. § 312 IAC 25-6-86 - Underground mining; hydrologic balance; surface and ground water monitoring
  89. § 312 IAC 25-6-87 - Underground mining; hydrologic balance; transfer of wells
  90. § 312 IAC 25-6-88 - Underground mining; hydrologic balance; water rights and replacement
  91. § 312 IAC 25-6-89 - Underground mining; hydrologic balance; discharge of water into underground mine
  92. § 312 IAC 25-6-90 - Underground mining; hydrologic balance; postmining rehabilitation of siltation structures, diversions, impoundments, and treatment facilities
  93. § 312 IAC 25-6-91 - Underground mining; hydrologic balance; stream buffer zones
  94. § 312 IAC 25-6-92 - Underground mining; coal recovery
  95. § 312 IAC 25-6-93 - Underground mining; explosives; general requirements
  96. § 312 IAC 25-6-94 - Underground mining; explosives; preblasting survey
  97. § 312 IAC 25-6-95 - Underground mining; explosives; publication of blasting schedule
  98. § 312 IAC 25-6-96 - Underground mining; explosives; surface blasting operations
  99. § 312 IAC 25-6-97 - Underground mining; explosives; records of blasting operations
  100. § 312 IAC 25-6-98 - Underground mining; disposal of underground development waste and excess spoil
  101. § 312 IAC 25-6-99 - Underground mining; coal mine waste; general requirements
  102. § 312 IAC 25-6-100 - Underground mining; coal mine waste; refuse piles; site inspection
  103. § 312 IAC 25-6-101 - Underground mining; coal mine waste banks; refuse piles; water control measures
  104. § 312 IAC 25-6-102 - Underground mining; coal mine waste; refuse piles; construction requirements
  105. § 312 IAC 25-6-103 - Underground mining; coal processing waste; burning
  106. § 312 IAC 25-6-104 - Underground mining; coal processing waste; return to underground workings
  107. § 312 IAC 25-6-105 - Underground mining; disposal of noncoal wastes
  108. § 312 IAC 25-6-106 - Underground mining; coal mine waste; refuse piles; dams and embankments; general requirements
  109. § 312 IAC 25-6-107 - Underground mining; coal processing waste; dams and embankments; site preparation
  110. § 312 IAC 25-6-108 - Underground mining; coal mine waste; refuse piles; dams and embankments; design and construction
  111. § 312 IAC 25-6-109 - Underground mining; protection of fish, wildlife, and related environmental values
  112. § 312 IAC 25-6-110 - Underground mining; slides and other damage
  113. § 312 IAC 25-6-111 - Underground mining; contemporaneous reclamation
  114. § 312 IAC 25-6-112 - Underground mining; backfilling and grading; general requirements
  115. § 312 IAC 25-6-113 - Underground mining; stabilization of surface areas
  116. § 312 IAC 25-6-114 - Underground mining; backfilling and grading; previously mined areas
  117. § 312 IAC 25-6-115 - Underground mining; revegetation; general requirements
  118. § 312 IAC 25-6-116 - Underground mining; revegetation; use of introduced species
  119. § 312 IAC 25-6-117 - Underground mining; revegetation; timing
  120. § 312 IAC 25-6-118 - Underground mining; revegetation; mulching and soil stabilizing
  121. § 312 IAC 25-6-119 - Underground mining; revegetation; grazing
  122. § 312 IAC 25-6-120 - Underground mining; revegetation; standards for success for nonprime farmland
  123. § 312 IAC 25-6-121 - Underground mining; revegetation; sampling techniques
  124. § 312 IAC 25-6-122 - Underground mining; revegetation; statistical methodology
  125. § 312 IAC 25-6-123 - Underground mining; subsidence control; general requirements
  126. § 312 IAC 25-6-124 - Underground mining; subsidence control; public notice
  127. § 312 IAC 25-6-125 - Underground mining; subsidence control; buffer zones
  128. § 312 IAC 25-6-126 - Underground mining; cessation of operation; temporary
  129. § 312 IAC 25-6-127 - Underground mining; cessation of operation; permanent
  130. § 312 IAC 25-6-128 - Underground mining; postmining land use
  131. § 312 IAC 25-6-129 - Underground mining; roads
  132. § 312 IAC 25-6-130 - Underground mining; primary roads
  133. § 312 IAC 25-6-131 - Underground mining; other transportation facilities
  134. § 312 IAC 25-6-132 - Underground mining; support facilities and utility installations
  135. § 312 IAC 25-6-133 - Underground mining; surveyor corner markers; replacement
  136. § 312 IAC 25-6-134 - Concurrent surface and underground mining; applicability
  137. § 312 IAC 25-6-135 - Concurrent surface and underground mining; compliance with variance terms
  138. § 312 IAC 25-6-136 - Concurrent surface and underground mining; additional performance standards
  139. § 312 IAC 25-6-137 - Auger mining; special standards; applicability
  140. § 312 IAC 25-6-138 - Auger mining; special standards; additional performance standards
  141. § 312 IAC 25-6-139 - Prime farmland; special performance standards; scope, purpose, and applicability
  142. § 312 IAC 25-6-140 - Prime farmland; special performance standards; United States Soil Conservation Service criteria
  143. § 312 IAC 25-6-141 - Prime farmland; special performance standards; soil removal and stockpiling
  144. § 312 IAC 25-6-142 - Prime farmland; special performance standards; soil replacement
  145. § 312 IAC 25-6-143 - Prime farmland; special performance standards; revegetation and restoration of soil productivity
  146. § 312 IAC 25-6-144 - Steep slopes; backfilling and grading
  147. § 312 IAC 25-6-145 - Coal preparation plants not within permit area for a mine; permits; applicability
  148. § 312 IAC 25-6-146 - Coal preparation plants not within a permit area for a mine; special performance standards
  149. § 312 IAC 25-6-147 - In situ processing; special performance standards
  150. § 312 IAC 25-6-148 - In situ processing; monitoring
  151. § 312 IAC 25-6-149 - Annual report

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.