Iowa Admin. Code r. 199-40.3 - Utility-build or lease cost estimates
(1)
General requirements. A
utility conducting a bidding process shall develop detailed cost estimates of
its own build or lease options. Those options may include units jointly planned
with other companies, plant upgrades or modifications, and plant extensions.
The cost estimates shall be detailed and filed on both a project and per-unit
basis.
(2)
Project cost
estimates. Project cost estimates shall be current and based on the
prices likely to be actually quoted by manufacturers and vendors of power plant
equipment. The utility-build or lease option shall be structured on an
incremental cost basis, including an allocation of common costs incurred for
the project's development. The utility shall detail in its filing the cost
allocations and methodologies used for overhead costs and any joint facilities
used in its estimates.
(3)
Per-unit cost estimates. The utility shall file estimates of
per-unit costs in the same measurements or units expected from other bidders on
the project sufficient for the board to determine the relative costs of the
utility-build or lease option versus like bids received from other bidders. The
per-unit cost estimates shall clearly identify the rate-making principles used
in calculating these costs.
(4)
Filing requirements. The utility-build or lease cost estimates
shall be submitted to the board seven days prior to the utility's receiving
competitive bids for new electric capacity and energy.