Iowa Admin. Code r. 199-45.2 - Scope
(1) This chapter
applies to utilities, and distributed generation facilities seeking to operate
in parallel with utilities, provided the facilities are not subject to the
interconnection requirements of an affected system, the Federal Energy
Regulatory Commission (FERC), the Midcontinent Independent System Operator,
Inc. (MISO), the Southwest Power Pool (SPP), the Midwest Reliability
Organization (MRO), or the SERC Reliability Corporation (SERC).
(2) If the nameplate capacity of the facility
is greater than 10 MVA, the interconnection customer and the utility shall
start with the Level 4 review process and agreements under rule
199-45.11 (476)
and modify the process and agreements as needed by mutual agreement. In
addition, the interconnection customer and the utility shall start with the
technical standards under rule
199-45.3
(476) and modify the standards as needed by mutual agreement. If the
interconnection customer and the utility cannot reach mutual agreement, the
interconnection customer may seek resolution through the rule
199-45.12 (476) dispute
process.