Iowa Admin. Code r. 567-22.9 - Special requirements for visibility protection
(1) to (3)
Reserved.
(4)
Notification. For the purpose of the regional haze program
under 40 CFR Section
51.308, as amended through January 10, 2017,
the department shall notify in writing the owner, operator or designated
representative of a source of the department's determination that the source
may cause or contribute to visibility impairment in any mandatory Class I area
listed in 40 CFR Part 81, Subpart D, as amended through October 5,
1989.
(5)
Analysis. The owner, operator, or designated representative of
a source notified pursuant to 22.9(4) shall prepare and submit an analysis to
the department after receipt of written notification by the department that an
analysis is required.
(6)
Control technology implementation. Following the department's
review of the analysis submitted pursuant to 22.9(5), an owner or operator of a
source notified pursuant to 22.9(4) shall:
a.
Submit all necessary permit applications to achieve the emissions requirements
established following the completion of analysis performed in accordance with
22.9(5).
b. Install, operate, and
maintain the control technology as required by permits issued by the
department.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
(1) to (3) Reserved.
(4) Notification. For the purpose of the regional haze program under 40 CFR Section 51.308, as amended through January 10, 2017, the department shall notify in writing the owner, operator or designated representative of a source of the department's determination that the source may cause or contribute to visibility impairment in any mandatory Class I area listed in 40 CFR Part 81, Subpart D, as amended through October 5, 1989.
(5) Analysis. The owner, operator, or designated representative of a source notified pursuant to 22.9(4) shall prepare and submit an analysis to the department after receipt of written notification by the department that an analysis is required.
(6) Control technology implementation. Following the department's review of the analysis submitted pursuant to 22.9(5), an owner or operator of a source notified pursuant to 22.9(4) shall:
a. Submit all necessary permit applications to achieve the emissions requirements established following the completion of analysis performed in accordance with 22.9(5).
b. Install, operate, and maintain the control technology as required by permits issued by the department.