Kan. Admin. Regs. § 82-3-1215 - Long-term monitoring, measurement, and testing for reservoir storage facilities and reservoir storage wells
(a) Each operator shall perform long-term
monitoring, measurement, and testing for each reservoir storage facility and
reservoir storage well pursuant to a long-term monitoring, measurement, and
testing plan signed by a licensed professional engineer and a licensed
professional geologist. Each operator shall submit a long-term monitoring,
measurement, and testing plan that includes the information required by, and
demonstrates compliance with, subsections (b) through (j) and includes the
information specified in this subsection.
(1)
Each operator shall demonstrate that each reservoir storage well has internal
mechanical integrity by using a hydraulic casing test or, if the well is
constructed with tubing and packer, a pressure test of the production tubing
and production casing annulus.
(2)
Each operator shall demonstrate that each reservoir storage well has external
mechanical integrity by running gamma ray, neutron, noise, and temperature logs
from 50 feet above the point of injection continuously to the surface. A depth
lower than 50 feet may be required by the director if the director deems that
this requirement is necessary to determine whether the reservoir storage well
has external mechanical integrity.
(3) Each operator shall meet the long-term
monitoring, measurement, and testing requirements in paragraphs (a)(1) and
(a)(2) according to the following:
(A) At
least once each five years;
(B)
after any workover involving the production casing cemented in the storage
reservoir or the innermost casing or liner inside the production
casing;
(C) before commencing
plugging operations if the most recent tests or logs were not performed within
the previous five years; and
(D)
whenever required by the director, if the director determines that it is
necessary to protect public health, usable water, or soil.
(4) Each operator shall evaluate the
production casing or innermost casing or liner that extends the entire length
of the production casing with a magnetic flux log if the director determines
that it is necessary to protect public safety, usable water, or soil.
(b) Each operator performing a
hydraulic casing test shall perform the following:
(1) The operator shall set a retrievable
bridge plug or packer in the storage well opposite a cemented interval at a
point immediately above the uppermost perforation or open-hole
interval.
(2) The operator shall
test the storage well at the maximum allowable operating pressure. The operator
shall test the well for at least 30 minutes, and the well shall be considered
to have internal mechanical integrity if the pressure does not decrease by more
than 10 percent.
(c) Any
operator may perform a pressure test of the production tubing and production
casing annulus if the well is constructed with tubing and a packer. The
operator performing a pressure test of the production tubing and production
casing annulus shall apply a minimum fluid pressure of 300 psig to the tubing
casing annulus at the surface for 30 minutes, and the well shall be considered
to have mechanical integrity if the pressure does not decrease by more than 10
percent.
(d) Any operator may use
an alternative method for the long-term monitoring, measurement, and testing
activity if approved by the director. The alternative method shall be approved
by the director if this method will allow the conservation division to verify
mechanical integrity according to the following information submitted by the
operator:
(1) A description of the alternate
method and the theory for its operation;
(2) a description of the reservoir storage
well conditions necessary for the use of the alternate method;
(3) specifications for the logging tool,
surveys, or tests including the tool dimensions, maximum temperature and
pressure rating, recommended logging speed for the tool, approximate image
resolution, and casing and hole size range;
(4) the procedure for interpreting the
results of the alternate method; and
(5) an interpretation of the results after
the alternate method has been used.
(e) No operator shall inject air into or
withdraw air from a reservoir storage well that fails to demonstrate mechanical
integrity through the performance of any test or log in subsections (a) through
(d), until the storage well is repaired, if necessary, and successfully
retested.
(f) Each operator shall
submit the long-term monitoring, measurement, and testing plan at least 60 days
before commencing any long-term monitoring, measurement, and testing activity.
Each operator shall ensure that an employee witnesses any activity. The
operator shall schedule the activity to facilitate witnessing by a conservation
division agent.
(g) Each operator
shall submit a summary, including all supporting documents, of the long-term
monitoring, measurement, or testing activity to the conservation division
within 30 days after completion of the activity.
(h) Each operator shall submit a report to
the conservation division, annually on or before April 1 on a form provided by
the conservation division, listing any activity in subsection (a) performed on
any reservoir storage well during the previous calendar year.
(i) Each operator shall monitor, measure,
sample, and report water quality at any shallow monitoring well and deep
monitoring well in a manner that allows the director to determine whether
groundwater has been affected by any spill or loss of containment.
(j) Each operator shall monitor, measure, and
sample at any leak detector in a manner that allows the director to determine
that leaks are not occurring.