06-096 C.M.R. ch. 574, § 6 - Variance
The department may grant a site-specific variance from the siting or operational requirements in this chapter when it determines that doing so will not have an adverse impact on water quality or the environment.
A.
Variance from
siting requirements. Factors used in consideration of a variance from
the siting requirements specified in Section 3(B) include, but are not limited
to, whether homes or businesses in the area are serviced by a public water
supply; whether the site is located in an area zoned for commercial or
industrial development by the municipality; the proximity to a major river,
marine waters or public water supply intake; and the availability of
practicable alternative sites that meet the specified siting
criteria.
B.
Variance from
operational requirements. Factors used in consideration of a variance
from the operational requirements specified in Section 4 include, but are not
limited to, the duration for which the storage area will be used; the proximity
to a major river or marine waters; and the ability to demonstrate control over
and discharge location of stormwater runoff from the site.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.