10- 144 C.M.R. ch. 205, § 8 - SUBMISSION OF PLANS FOR NEW CONSTRUCTION
8.A.Plan information: A complete plan of any
proposed new, expanded or altered park shall be submitted to the Department for
approval before construction and licensing. The following information shall be
included in any plans submitted to the Department:
8.A.1. Applicant: Name and address of
applicant.
8.A.2. Legal
description: Location and legal description of the park.
8.A.3. Engineering plans: Complete
engineering plans, drawn to scale, and specifications of the proposed park or
area showing, when applicable:
8.A.4. Location of sites: The number and
location of R.V.'s and tenting sites.
8.A.5. Roads: The location of
roadways.
8.A.6. Water and sewer
lines: The location of water and sewer lines and riser pipes.
8.A.7. Buildings: Plans, location and
specifications of all buildings constructed or proposed within the park.
8.A.8. Lighting: The location and
details of lighting and electrical systems.
8.A.9. Type of park: The type of park
proposed, R.V. and tent or wilderness recreational park.
8.A.10. Water supply: The source of the
drinking water supply and water test results along with a well approval form if
source is a well.
8.A.11.
Wastewater disposal: Design of wastewater disposal system on HHE-200 form.
8.A.12. Date: The date the plans
were drawn up.
8.A.13. Signature:
Signature of the preparer of the plan.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.