99-346 C.M.R. ch. 25, § 4 - Eligibility Determination

A. Eligibility for WAP shall be as provided for in the Weatherization Act.
B. Work on an eligible Dwelling Unit previously weatherized under WAP may be reopened if:
1. The reopening takes place within 6 months of completion of the original WAP service; and
2. The reopening is required because the previous service is the proximate cause of animmediate threat to the health and/or safety of the unit or its occupants; or the quality of Weatherization Materials or its installation is deemed deficient by Maine Housing.
C. Reworks
1. Maine Housing may order a Rework if it determines that the over all quality of work is poor, installed Weatherization Materials are in appropriate for the Dwelling Unit, or Weatherization Materials billed to Maine Housing have not been installed.
2. The Rework shall be completed within 30 days of the Subgrantee's receipt of a form issued by Maine Housing ordering the completion of the Rework, unless otherwise specified by Maine Housing in writing.
3. A Rework form shall be submitted to Maine Housing with a billing summary sheet.