A. Applicability and Exceptions.
(1) The provisions of this regulation apply
to:
(a) Fuel burning equipment burning coal,
fuel oil, tars, or waste combustible fluid at any time and that has a rated
heat input capacity of 250 million Btu per hour or greater;
(b) Fuel burning equipment burning coal with
a rated heat input capacity of 100 million Btu per hour or greater but less
than 250 million Btu per hour and was constructed on or before June 19,
1984;
(c) A cement kiln;
(d) A fluidized bed combustor of any size;
and
(e) A municipal waste combustor
with a burning capacity of 35 tons or greater per day.
(2) The owner or operator of an installation
subject to this regulation may also be subject to the requirements of 40 CFR
Parts 60 and 75, as amended.
(3)
This regulation does not apply to fuel burning equipment that:
(a) Burns only distillate fuel oil or a
mixture of gas and distillate fuel oil;
(b) Is able to comply with the applicable
particulate matter and opacity emission limitations without using particulate
matter control equipment; and
(c)
Has never been found in a final order to be in violation of any visible
emissions standard.
(4)
The owner or operator of fuel burning equipment subject to this regulation may,
with approval by the Department, discontinue use of a COM only in accordance
with the provisions in COMAR
26.11.09.05 a C.
(5) The owner or operator of a cement
manufacturing installation may discontinue use of a COM when a PM CPMS is
installed and operated in accordance with the requirements of COMAR
26.11.30.
(6) Sources may request
for approval by the Department and EPA an alternate limit for specific
operating conditions in which the technological limitations of the control
equipment adversely affects the ability of the source to comply with visible
emissions limits by following the recommendations at 80 FR 33980. The alternate
limit shall be submitted to EPA as a SIP revision and included in 40 CFR Part
52 Subpart V 52.1070(d) for Maryland Source Specific SIP
revisions.
B. General
Requirements for COMs.
(1) The owner or
operator of an installation subject to this regulation shall:
(a) Install and continuously operate a COM
that complies with a plan approved by the Department and EPA in accordance with
§B(1)(b) of this regulation; and
(b) Before installing a COM, submit to the
Department for approval, a plan containing the COM design specifications,
proposed location, and a description of a proposed alternative measurement
method consisting of a schedule for utilizing the EPA Reference Method 9
observational procedures.
(2) The Department shall submit the plan to
EPA for review and approval.
(3) A
COM shall comply with the applicable requirements in 40 CFR Part 51, Appendix
P, as amended, which is incorporated by reference.
(4) The owner or operator of fuel burning
equipment that is required by this regulation to install and operate a COM is
subject to the provisions in COMAR
26.11.09.05 a.
(5) The owner or operator of a cement kiln or
clinker cooler that is operating a COM is subject to the following
requirements.
(a) The owner or operator of a
cement kiln or clinker cooler may not cause or permit the discharge of
emissions which exceed the visibility standards in COMAR
26.11.30.05B.
(b) The visibility standards in
COMAR 26.11.30.05B(1) and
(2) do not apply to emissions as specified in
COMAR 26.11.06.02A(2)
during EPA reference Method 9 observations.
(c) For the purpose of demonstrating
compliance with COMAR
26.11.30.05B(2)
when using a COM, emissions that are visible to a human observer are those that
are equal to or greater than 10 percent opacity.
(d) For the owner or operator of a cement
kiln or clinker cooler that is operating a COM, compliance with visible
emission standards is achieved if visible emissions do not exceed the
applicable visible emission limitations in
26.11.30.05B(1) or
(2) as applicable.
(e) Notwithstanding the requirements in
§B(5)(a)-(d) of this regulation, the Department may determine compliance
and non-compliance with the visible emission limitations by performing EPA
reference Method 9 observations.
(f) The owner or operator of a cement kiln or
clinker cooler that is operating a COM shall meet the quality assurance
requirements under COMAR 26.11.31.
(6) The owner or operator of a municipal
waste combustor that is required to install and operate a COM is subject to the
following requirements:
(a) The owner or
operator of a municipal waste combustor may not cause or permit the discharge
of emissions which exceed the visibility standards in COMAR
26.11.08.04 as determined by EPA
reference Method 9 observations.
(b) For the purpose of demonstrating
compliance with COMAR
26.11.08.04 when using a COM,
emissions that are visible to a human observer are those that are equal to or
greater than 10 percent opacity.
(c) For the owner or operator of a municipal
waste combustor that is required to install and operate a COM, compliance with
visible emission standards is achieved if visible emissions do not exceed 10
percent opacity for a 6-minute block average during the unit's operating
time.
(d) Notwithstanding the
requirements in §B(6)(a)-(c) of this regulation, the Department may
determine compliance and non-compliance with the visible emission limitations
by performing EPA reference Method 9 observations.
(e) The owner or operator of a municipal
waste combustor that is operating a COM shall meet the quality assurance
requirements under COMAR 26.11.31.
C. Certification and Quality Assurance
Procedures.
(1) All certification testing,
including certification performance tests and audits, shall be performed in
accordance with 40 CFR Part 60, Appendix B, as amended, which is incorporated
by reference.
(2) For fuel burning
equipment subject to the federal Acid Rain Program, all certification testing,
including certification performance tests and audits, shall be performed in
accordance with 40 CFR Part 75, Appendix A, as amended.
(3) Certification testing shall be repeated
when the Department determines that the data are invalid because of component
replacement or other conditions that affect the accuracy of generated
data.
(4) The owner or operator
that is required to perform a certification performance test shall:
(a) At least 60 days before the test, submit
a test protocol to the Department for review and approval;
(b) Schedule the test at a reasonable time
and notify the Department at least 10 days before the test is to be conducted;
and
(c) Submit the test results to
the Department not later than 45 days after the completion of the
test.
(5) The owner or
operator of fuel-burning equipment required to install and operate a COM shall
meet the quality assurance procedures contained in COMAR 26.11.31.
D. Record Keeping and Reporting
Requirements.
(1) System Downtime Reporting
Requirements.
(a) All COM downtime that lasts
or is expected to last more than 24 hours shall be reported to the Department
by telephone before 10 a.m. of the first regular business day following the
first day on which downtime occurs.
(b) The COM downtime report shall include the
reason, if known, for the breakdown and the estimated period of time that the
COM will be down. The owner or operator shall notify the Department by
telephone when the COM has met performance specifications for accuracy,
reliability, and durability of acceptable monitoring systems, as provided in 40
CFR Part 51 Appendix P, and is producing data.
(c) Except as otherwise approved by the
Department and the EPA, a COM shall operate in compliance with the requirements
of §B(2) of this regulation and collect data for at least 95 percent of
the source's operating time during any calendar quarter. The alternative
measurement plan required in §B(1)(b) of this regulation shall be used at
all times when the COM fails to conform to performance standards required by
§B(2) of this regulation during data collection.
(2) Data Reporting Requirements.
(a) A COM shall automatically reduce all data
to six-minute block averages calculated from 24 or more equally spaced data
points.
(b) All COM data shall be
reported in a format approved by the Department.
(c) A quarterly summary report shall be
submitted to the Department not later than 30 days following each calendar
quarter. The report shall be in a format approved by the Department, and shall
include the following:
(i) The cause, time
periods, and the opacity of all emissions which exceed the applicable
quarterly, daily and hourly emission standards as provided in COMAR
26.11.09.05 a A(4);
(ii) The COM and installation downtimes,
including the time and date of the beginning and end of each downtime period,
and whether the downtime was scheduled;
(iii) The cause of all COM
downtime;
(iv) The total operating
time for the quarter, and the total time and percent of the operating time
during the quarter that excess emissions occurred, and the percentage of COM
downtime, during the calendar quarter;
(v) Quarterly quality assurance
activities;
(vi) Daily calibration
activities that include reference values, actual values, absolute or percent of
span differences, and drift status;
(vii) Other information that the Department
determines is necessary to evaluate the data or to ensure that compliance is
achieved.
E. All information required by this
regulation to be maintained or reported to the Department shall be retained and
made available for review by the Department for a minimum of 5 years from the
time the report is submitted.
Notes
Regulation .10 amended effective September 22, 1997 (24:19 Md. R. 1343)
Regulation .10 repealed and new Regulation .10 adopted effective May 17, 2010 (37:10 Md. R. 724)
Regulation .10A, C amended effective August 22, 2011 (38:17 Md. R. 1014)
Regulation .10F amended effective August 22, 2011 (38:17 Md. R. 1014)
Regulation .10 amended effective 42:14 Md. R. 884, eff.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.