(1)
General.
(a) Unless otherwise specifically provided in
310 CMR
4.10, timely action schedules and application fees in effect on the day
the application is filed, shall apply to that application.
(b) The following permit category sets as
established in 310 CMR
4.10 effective January 1, 1991 are consolidated
effective July 1, 1992: WP 06 and 07, WP 08 and 09, WP 21 and 22, WP 23 and 24,
WP 35 and 36; IW 03 and 04, IW 05, 06 and 07, IW 08 and 09, IW 10 and 11, IW 13
and 14, IW 12 and 15, IW 16 and 17, IW 18 and 19, IW 21 and 22.
For reviews pending on July 1, 1992 in categories WP 06, 08,
21, 23, 35, IW 03, 05, 06, 08, 10, 12, 14, 16, 18, 21, the applicant may upon
issuance of that permit, file an application in the consolidated category. The
consolidated category timely action schedule and permit application fee amount
for such application shall be that which would have been applicable prior to
July 1, 1992 for the remaining permits of the set.
Permit categories WS13 and 14 and WS15 and 16 are consolidated
effective July 1, 1993. For reviews pending on July 1, 1993 in WS 13 or 15, the
applicant may upon issuance of that permit, file an application in the
consolidated category. The schedule and fee amount for such application shall
be that which would have been applicable prior to July 1, 1993 for the
remaining permit of the set.
(c)
State Agency
Applicants. For state agency applicants, any permit application
fee of $100 or less shall be waived as representing an administrative expense
associated with transfer of funds between state agencies that is a substantial
portion of the fee. Notwithstanding the prior sentence, fees pursuant to M.G.L.
c. 21E shall be required of state agency applicants.
(d)
Refund. The
Department shall notify applicants and allow submission of an application for a
refund within 30 days for those permit applications filed on January 1, 1992
through June 30, 1992 with a review pending on July 1, 1992, and for which a
reduced fee may have been available if the application had been filed on or
after July 1, 1992. The amount of the refund, if any, shall be the difference
between the old and new fee. 310 CMR
4.10(1)(d) shall not apply to individual
rule and alternative schedule projects.
(e)
Index and Key
BUREAU OF AIR AND WASTE
(2)
Air Quality
Control.
Plan Approvals.
(a) (
AQ01) Permits
for air quality, plan approvals.
1. Category:
limited plan approvals.
2.
Description: permit to construct, substantially reconstruct or alter any
facility required to obtain a limited plan approval pursuant to
310 CMR
7.02(4):
Limited
Plan Application (LPA).
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after March 24, 2017,
a.
Within 24 days of receipt of an application and payment of the permit
application fee, the Department shall complete an administrative completeness
review.
b. Within 48 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 180 days of the
Department's statement identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $645.
(b) (
AQ02) Permits
for air quality, plan approvals.
1. Category:
non-major comprehensive plan approval.
2. Description: effective March 24, 2017
Permit to construct, substantially reconstruct or alter a facility pursuant to
310 CMR
7.02(5):
Comprehensive Plan Application (CPA) that is not listed in 310
CMR
4.10(2)(c).
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after May 1, 2020,
a. Within 24 days of
receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 72 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee: $2,370.
(c)
(
AQ03) Permits for air quality, plan approvals.
1. Category: major comprehensive plan
approval.
2. Description:
a. Effective March 24, 2017 Permit to
construct, substantially reconstruct or alter a facility pursuant to
310 CMR
7.02(5):
Comprehensive Plan Application (CPA) where the construction,
substantial reconstruction or alteration has potential emissions greater than
or equal to 100 tons per year of any criteria air contaminant, excluding
products of combustion, or;
b.
(Reserved);
c. Permit subject to
310 CMR
7.02(5):
Comprehensive Plan Application (CPA) and
310 CMR
7.00:
Appendix A (Non-attainment
Review) or;
d. (Reserved)
e. Permit to construct, substantially
reconstruct or alter a fuel utilization facility where the portion being
constructed, substantially reconstructed or altered has an energy input
capacity equal to or greater than the threshold requirements of
310 CMR
7.02(5)(a)2.:
Fuel
Utilization Emission Units, and will result in increased potential
emissions greater than or equal to 100 tons per year of any criteria air
contaminant; or f. Permit subject to
310 CMR
7.02(5):
Comprehensive Plan Application (CPA) and
40 CFR
52.21 (Prevention of Significant
Deterioration); or g. A permit to construct an incinerator having a waste
capacity greater than 2000 pounds per hour of waste.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after May 1, 2020,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 128 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 128 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 72 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee: $24,305.
(c)
(1)
(
AQ33) Permits for Air Quality: Consolidated Plan
Approval.
1. Category: consolidated plan
approval.
2. Description:
consolidated plan for a facility's applicable requirements pursuant to
310 CMR
7.02(12):
U
Consolidation of Applicable Requirements.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 30 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 90 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 60 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,500 plus $150 per requirement consolidated for each
emission unit up to a maximum total fee of $5,000.
Emission Control Plans.
(d)
(
AQ08) Permits for Emission Control Plans.
1. Category: emission control
plans.
2. Description: emission
control plan required pursuant to
310 CMR
7.18:
U Volatile and Halogenated
Organic Compounds or
310
CMR
7.19:
U Reasonably Available
Control Technology (RACT) for Sources of Oxides of Nitrogen
(NOX).
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. where compliance can be achieved by
meeting emission limitations specifically articulated in
310 CMR
7.00:
Air Pollution Control,
including through the use of emissions averaging or trading as described in
310 CMR
7.00:
Appendix B
(i) Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
(ii) Within 63 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
(iii) The permit applicant
may remedy identified deficiencies within 45 days of the Department's statement
identifying deficiencies, if any.
(iv) Within 63 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
(v) Within 30 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
b. Where approval is required by the US
Environmental Protection Agency as a single source SIP (State Implementation
Plan) revision to demonstrate compliance with federally mandated RACT because
compliance cannot be achieved by meeting emission limitations specifically
articulated in
310 CMR
7.00:
Air Pollution Control, or to
satisfy
310 CMR
7.18(17):
Reasonable
Technology or 7.19(12):
Miscellaneous RACT,
(i) Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
(ii) Within 128 days of making a
determination of administrative completeness, the Department shall complete a
technical review.
(iii) The permit
applicant may remedy identified deficiencies within 180 days of the
Department's statement identifying deficiencies, if any.
(iv) Within 128 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
(v) Within 72 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee:
a. Permits meeting the description of 310 CMR
4.10(2)(d)3.a.: $1,880.
b. Permits
meeting the description of 310 CMR
4.10(2)(d)3.b.: $22,310.
(d)
(1) (
AQ22) - Permits
for Emission Control Plan for Municipal Waste Combustors.
1. Category: Municipal Waste Combustor
emission control plan.
2.
Description: Emission Control Plan required pursuant to
310 CMR
7.08(2):
Municipal
Waste Combustors for sources constructed prior to 1994.
3. Schedule for timely action: for projects
for which application is filed and fee received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy any identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental review.
e. Within 24 days of the close of the period
for public comment, the Department will issue or deny the permit.
4. Permit application fee:
$8,820.
Restrictions on Potential Emissions.
(e) (
AQ09) Permit to
restrict potential emissions.
1. Category:
permit restrictions or Restricted Emission Status (RES).
2. Description: permit restriction issued to
any facility pursuant to
310 CMR
7.02(9):
Restricted
Emission Status (RES) to restrict potential emissions in order to:
a. allow redesignation for purposes of annual
compliance fee for permittees for regulated air contaminants; or
b. lower potential emissions below the
Reasonably Available Control Technology (RACT) applicability thresholds for
halogenated organic compounds (HOC) (310 CMR
7.18:
U Volatile and Halagonated
Organic Compounds); or
c.
lower federal potential emissions below the Reasonably Available Control
Technology (RACT) applicability thresholds for volatile organic compounds
(310 CMR
7.18:
U Volatile and Halagonated
Organic Compounds and
310 CMR
7.00:
Appendix C where applicable);
or
d. lower federal potential
emissions below the Reasonably Available Control Technology (RACT)
applicability thresholds for oxides of nitrogen (NO) (310
CMR
7.19:
U Reasonable Available
Control Technology (RACT) for Sources of Oxides of Nitrogen
(NOx and
310 CMR
7.00:
Appendix C where applicable);
or
e. restrict federal potential
emissions of regulated pollutants to eliminate applicability to an otherwise
applicable requirement, including but not limited to,
310 CMR
7.00
Appendix C.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical review e.
Within ten days of the close of the period for public comment, including public
hearing, if applicable, the Department will complete a public comment
review.
4. Permit
application fee: $1,900.
Asbestos and Construction
Notifications
(f) (
AQ04) Permits
for Asbestos.
1. Category: asbestos removal
notification.
2. Description:
notification submitted to satisfy the requirements of
310 CMR
7.15(6):
Notification Requirements for asbestos abatement activity at
industrial, commercial and institutional sites and residential property,
excluding owner-occupied residential property with four or fewer units.
3. Schedule for timely action: for
projects for which applications are filed and fees received on or after March
24, 2017,
a. Within ten working days of
receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review. The
notification form shall be deemed accepted by the Department, unless the
applicant is notified in writing of deficiencies.
b. The permit applicant may remedy identified
deficiencies within 30 days of the Department's statement identifying
deficiencies, if any.
c. Within ten
working days of receipt of materials from the applicant in response to the
Department's statement identifying deficiencies, the Department shall complete
a final review.
4. Permit
application fee: $100.
(g) (
AQ05) Permits
for Asbestos.
1. Category: asbestos blanket
notification.
2. Description:
notification submitted of plan for multiple demolition or renovation jobs
within a single facility during a period not to exceed one year, where
permitted by the Department pursuant to
310 CMR
7.15(6)(j):
Facility
Blanket Notification.
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after May 1, 2020,
a.
Within 20 days of receipt of an application and payment of the permit
application fee, the Department shall complete a technical review and notify
the applicant of any deficiencies.
b. The permit applicant may remedy identified
deficiencies within 30 days of the Department's statement identifying
deficiencies, if any.
c. Within 20
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
4. Permit application fee:
a. Asbestos blanket notification application:
$200.
b. Asbestos removal
notification submitted under an approved asbestos blanket notification:
$100.
(h)
(
AQ06) Construction and Demolition Notification.
1. Category: notification prior to
construction or demolition of an industrial, commercial, or institutional
building or residential building with 20 or more units, pursuant to
310 CMR
7.09(2).
2. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within ten working days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review and indicate deficiencies, if
any, to the applicant.
b. The
permit applicant may remedy identified deficiencies within 60 days of the
Department's statement identifying deficiencies, if any. Submission of amended
information, except as provided in 310 CMR
4.10, within the 60-day period shall
not constitute a new notification.
c. Within ten working days of receipt of
materials from the applicant in response to the Department's statement
identifying deficiencies, the Department shall complete a final
review.
3. Permit
application fee: $100.
(h)
(1)
(
AQ35) Permits for Asbestos.
1. Category: revised asbestos removal
notification.
2. Description: the
revision of an asbestos removal notification, or an asbestos removal
notification submitted under an approved blanket notification, to satisfy the
requirements of
310 CMR
7.15(6):
Notification Requirements; or a construction and demolition
notification submitted to satisfy the requirements of
310 CMR
7.09(2).
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within ten working days of receipt of an
application and payment of the permit application fee, the Department will
complete an administrative completeness review. The revised notification form
shall be deemed accepted by the Department unless the applicant is notified in
writing of deficiencies.
b. The
permit applicant may remedy identified deficiencies within 30 days of the
Department's statement identifying deficiencies, if any.
c. Within ten working days of receipt of
materials from the applicant in response to the Department's statement
identifying deficiencies, the Department shall complete a final
review.
4. Permit
application fee: $35.
(h)
(2)
(
AQ36) Permits for Asbestos.
1. Category: non-traditional asbestos
abatement work practice approval.
2. Description: non-traditional asbestos
abatement work practice approvals for sites where traditional practices cannot
be implemented due to specific circumstances as specified in
310 CMR
7.15(14):
Non-traditional Asbestos Abatement Work Practice
Approvals.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within ten
working days of receipt of an application and payment of the permit application
fee, the Department shall complete an administrative completeness
review.
b. The permit applicant may
remedy identified deficiencies within 30 days of the Department's statement
identifying deficiencies, if any.
c. Within ten working days of receipt of
materials from the applicant in response to the Department's statement
identifying deficiencies, the Department shall complete a final
review.
4. Permit
application fee: $600.
Operating Permits
(j)
(4) (
AQ14) Permits
for Air Quality Control.
1. Category: initial
operating permit application for a facility subject to
310 CMR
7.00:
Appendix C.
2. Description: operating permit for a
facility subject to
310 CMR
7.00:
Appendix C.
3. Schedule for timely action: for
applications which are filed and fees received on or after March 24, 2017,
a. Within 60 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 180 days of a determination of
administrative completeness, the Department shall conduct a technical
review.
c. The permit applicant may
remedy identified deficiencies within 30 days of the Department's statement
identifying deficiencies, if any.
d. Within 180 days of receipt of materials
from the applicant, in response to the Department's statement identifying
deficiencies, the Department shall conduct a supplemental technical
review.
e. Within 45 days of the
completion of a public comment period including public hearing, if applicable,
the Department shall complete a proposed decision for submission to
EPA.
f. Within 45 days of the
receipt of EPA final comment on the proposed decision, the Department shall
complete a final review.
4. Permit application fee: the amount shall
be calculated, in accordance with definitions in
310 CMR
7.00:
Air Pollution Control, by
adding (AA x $ 9) plus (EC x $ 549) plus (EU x $ 405), but the amount shall not
be less than $ 2312; where AA is the Adjusted Actual Emissions tons per year of
criteria pollutants for the calendar year prior to the submittal of an
application for an operating permit, excluding carbon monoxide, capped at 4000
tons/year per pollutant; and EC is an Emissions Unit with Air Pollution Control
Equipment; and EU is an Emissions Unit with no Air Pollution Control Equipment.
Emission Reduction
Certification
(l) (
AQ18) Permits
for Air Quality; Emission Reduction Certification.
1. Category: certification of emission
reductions for emission banking and trading pursuant to
310 CMR
7.00:
Appendix B.
2. Description: certification of emission
reductions which exceed state and federal requirements as Emission Reduction
Credits (ERCs).
3. Schedule for
timely action: for projects for which applications are filled and fees received
on or after March 24, 2017,
a. Within 48 days
of receipt of an application and payment of the permit application fee the
Department shall complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies if any.
d.
Within 48 days of receipt of materials from the applicant in response to the
Department's statement identifying deficiencies, if any, the Department shall
complete a supplemental technical review.
e. Within 36 days of the close of the period
for public comment, including any public hearing, the Department shall complete
public comment review and issue final decision.
4. Permit application fee:
$1,225 greater than or equal to five, but less than ten tons or
tpy ERC;
$6,140 greater than or equal to ten, but less than 50 tons or
tpy ERC;
$9,215 greater than or equal to 50, but less than 100 tons or
tpy ERC; $15,360 greater than or equal to 100, but less than 500 tons or tpy
ERC; $18,430 greater than or equal to 500 tons or tpy ERC.
(3)
Hazardous
Waste.
Hazardous Waste Recycling
(a)
(1)
(HW21) Hazardous waste recycling permits.
1. Category: Class A recycling presumptive
approval permit/renewal.
2.
Description: Class A recycling permit and permit renewals for Class A regulated
recyclable material pursuant to
310 CMR
30.221(2)
for recycling activities described in
310 CMR
30.221:
Table 1 and
designated by an "N".
3. Schedule
for timely action: for projects for which applications are filed and fees
received on or after May 1, 2020,
a. Within
ten days the Department shall complete an administrative completeness
review.
b. Within 21 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 21 days of the Department's
statement identifying deficiencies, if any.
d. Within 21 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a final review.
4. Permit application fee:
$155.
(b)
(1)
(HW22) Hazardous
waste recycling permits.
1. Category: Level I
recycling permits and permit renewals.
2. Description:
a. Applications pursuant to
310
CMR
30.261:
Applications for Class
B(3) Permits for Generators to Market Off-specification Used Oil Fuel
or
310 CMR
30.264:
Class B(3) Permits to Market
Specification Used Oil Fuel for a permit or permit renewal to market
Class B(3) regulated recyclable materials described in
310 CMR
30.213(3), except those
proposing to burn such materials for energy recovery;
b. Applications pursuant to
310 CMR
30.232:
Class B(1) Permits and Permit
Applications for a permit or permit renewal to recycle regulated
materials described in
310 CMR
30.213(1):
Class
B(1);
c. Applications
pursuant to
310
CMR
30.280:
Requirements for
Recycling Class B(5) Regulated Recyclable Materials for a permit or
permit renewal to recycle regulated recyclable materials described in
310 CMR
30.213(5):
Class
B(5);
d. Applications
pursuant to
310 CMR
30.273:
Generator Permits and Permit
Applications for a permit or permit renewal to recycle regulated
recyclable materials described in
310 CMR
30.213(4):
Class
B(4).
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after May 1, 2020,
a.
Within ten days of receipt of an application and payment of the permit
application fee the Department shall complete an administrative completeness
review.
b. Within 24 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 60 days of the Department's
statement identifying deficiencies, if any.
d. Within 24 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $245.
(c)
(1)
(
HW23) Hazardous waste recycling permits.
1. Category: Level II recycling
permits.
2. Description:
a. applications pursuant to
310
CMR
30.247:
Permits and Permit
Applications for Those Who Burn Hazardous Waste Fuel at the Site of
Generation for a permit to recycle regulated recyclable materials
described in
310 CMR
30.213(2):
Class
B(2);
b. applications
pursuant to
310
CMR
30.260(3) or (4) for a
permit to recycle regulated recyclable materials described in
310 CMR
30.213(3):
Class
B(3) in amounts less than 100,000 gallons per year;
c. applications for transfer stations
pursuant to
310 CMR
30.010:
Definitions and 30.277:
Recycling and Transfer Station
Permits and Permit Applications concerning the regulated recyclable
materials described in
310 CMR
30.213(4):
Class
B(4).
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after March 24, 2017,
a.
Within 36 days of receipt of an application and payment of the permit
application fee, the department shall complete an administrative completeness
review.
b. Within 36 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 60 days of the Department's
statement identifying deficiencies, if any.
d. Within 36 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,235.
(c)
(2)
(
HW24) Hazardous waste recycling permits.
1. Category: Level II recycling permit
renewals or modifications.
2.
Description: Level II recycling permit renewals or permit modifications for
HW23.
3. Schedule for timely
action: for projects for which applications are filed and fees received on or
after March 24, 2017,
a. Within 24 days of
receipt of an application and payment of the permit application fee, the
department shall complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $325.
(d) (
HW12) Hazardous
waste recycling permits.
1. Category: Level
III Recycling Permit - Precious Metals.
2. Description: application for recycling
facilities pursuant to 310 CMR
30. 277:
Recycling and Transfer Station
Permits and Permit Applications for a permit to recycle regulated
recyclable material described in
310 CMR
30.213(4):
Class
B(4).
3. Schedule for
timely action: for projects for which applications are filed and/or fees
received on or after March 24, 2017,
a. Within
24 days of receipt of an application and payment of the permit application fee,
the Department shall complete an administrative completeness review.
b. Within 96 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 96 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $5,845.
(d)
(1)
(HW25) Hazardous waste recycling permits.
1. Category: Level III recycling
permits.
2. Description:
a. applications pursuant to
310 CMR
30.224:
Applications for Class A
Permits for a permit to recycle regulated recyclable materials
described in
310 CMR
30.212(3) or (5) through (8)
allowing applicants to accept for recycling such materials generated off
site;
b. applications pursuant to
310
CMR
30.260(2) for a permit
to market regulated recyclable materials described in
310 CMR
30.213(3):
Class
B(3);
c. applications
pursuant to
310
CMR
30.260(3) or (4) for a
permit to recycle regulated recyclable materials described in
310 CMR
30.213(3):
Class
B(3) in amounts equal to or greater than 100,000 gallons per
year;
d. applications pursuant to
310
CMR
30.290:
Requirements for
Recycling Class C Regulated Recyclable Materials for a permit to
recycle regulated recyclable materials described in
310 CMR
30.214:
Class C Regulated Recyclable
Materials.
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after March 24, 2017,
a.
Within 24 days of receipt of an application and payment of the permit
application fee, the department shall complete an administrative completeness
review.
b. Within 96 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 180 days of the
Department's statement identifying deficiencies, if any.
d. Within 96 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 24 days of the
close of the period for public comment, including any public hearing, the
department shall complete a public comment review.
4. Permit application fee: $9,550.
(d)
(2)
(HW26) Hazardous
waste recycling permits.
1. Category: Level
III recycling permit renewals or modifications.
2. Description: Level III recycling permits
renewals or permit modifications for permits HW12 and HW25.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after May 1, 2020,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the department shall
complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,065.
Hazardous Waste Transporters
(g) (
HW05) Permits
for Transporters of Hazardous Waste.
1.
Category: permits to transport hazardous waste, including mixed waste, pursuant
to
310 CMR
30.400:
Requirements for Transporters
of Hazardous Waste, and
310 CMR
30.800:
Licensing Requirements and
Procedures.
2. Schedule
for timely action: for projects for which applications are filed and fees
received on or after May 1, 2020,
a. Within
30 days of receipt of an application and payment of the permit application fee,
the Department shall complete an administrative completeness review.
b. Within 60 days of making a determination
of administrative completeness, the Department shall complete a technical
review, including the response to any public comments made during a public
comment period if any,
c. The
permit applicant may remedy identified deficiencies within 60 days of the
Department's statement identifying deficiencies, if any.
d. Within 60 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
3. Permit
application fee: $3,450.
(g)
(1)
(HW28) Permits for Transporters of Hazardous Waste.
1. Category: annual vehicle identification
device (VID).
2. Description: one
or more vehicle VID(s) for use during a single calendar year pursuant to
310 CMR
30.010:
Definitions and
310 CMR
30.414:
Vehicle Identification
Device by a licensed hazardous waste transporter. After issuance of
VID(s) for use during a single calendar year, additional or replacement VID(s)
for the same calendar year may be requested without an additional
fee.
3. Schedule for timely action:
for projects for which application is filed and fees received on or after March
24, 2017,
a. Within 72 days of receipt of an
application and payment of the application fee, the Department shall complete a
technical review.
b. The permit
applicant may remedy identified deficiencies within 90 days of the Department's
statement identifying deficiencies, if any,
c. Within 72 days of receipt of materials in
response to the Department's statement identifying deficiencies, the Department
shall complete a final review.
4. Permit application fee: calculated in
accordance with 310 CMR
30.000:
Hazardous Waste and
801 CMR
4.07:
Hazardous Waste Transporters
Fee by adding the volume in pounds of all nonexempt hazardous waste
manifested for transport in Massachusetts during the 12 months ending the March
31
st prior to the application, and multiplying
pounds by $0.00084 for calendar year 2003 VID(s) and by $0.00172 for
applications for each year thereafter; but regardless of calculation, the fee
shall be a minimum of $60.
(h)
(1)
(
HW14) Permit Renewals for Transporters of Hazardous
Waste.
1. Category: renewal of Hazardous Waste
Transporter permits, including mixed waste, pursuant to
310 CMR
30.400:
Requirements for Transporters
of Hazardous Waste and
310 CMR
30.800:
Licensing Requirements and
Procedures.
2. Schedule of
timely action: for projects for which applications are filed and/or fees
received on or after May 1, 2020,
a. Within
30 days of receipt of an application and payment of the permit application fee,
the Department shall complete an administrative completeness review.
b. Within 60 days of making a determination
of administrative completeness, the Department shall complete a technical
review, including the response to any public comments made during a public
comment period if any,
c. The
permit applicant may remedy identified deficiencies within 60 days of the
Department's statement identifying deficiencies, if any.
d. Within 60 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
3. Permit
application fee: $2,375.
Transporters of Class B(4) Regulated Recyclable
Material
(i) (
HW06) permits
for Transporters of Class B(4) Regulated recyclable material.
1. Category: permits for Transporters of
Class B(4) Regulated recyclable material.
2. Description: permit to transport Class
B(4) Regulated Recyclable Materials pursuant to
310 CMR
30.213(4):
Class
B(4) and
310 CMR
30.275:
Transporter Permits and
Permit Applications.
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after May 1, 2020,
a.
Within ten days of receipt of an application and payment of the permit
application fee, the Department shall complete an administrative completeness
review.
b. Within 48 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 60 days of the Department's
statement identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,290.
(j)
(1)
(
HW15) Permit Renewal for Transporters of Regulated
Recyclable Material
1. Category: permit
Renewal for Transporters of Regulated Recyclable Material.
2. Description: renewal of permit to
transport Class B(4) Regulated Recyclable Material pursuant to
310 CMR
30.213(4):
Class
B(4) and
310 CMR
30.275:
Transporter Permits and
Permit Applications.
3.
Schedule of Timely Action: for projects for which applications are filed and/or
fees received on or after May 1, 2020,
a.
Within ten days of receipt of an application and payment of the permit
application fee, the Department shall complete an administrative completeness
review.
b. Within 48 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 60 days of the Department's
statement identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $890.
Hazardous Waste Transporter Permit and Class B(4)
Regulated Recyclable Material Transporter Permit
Modifications
(j)
(3) (
HW27) Permit
Modification for Hazardous Waste Transporter Permit and Class B(4) Regulated
Recyclable Material Transporter Permit.
1.
Category: presumptive approval permit modification for Hazardous Waste
transporter permits and Class B(4) Regulated Recyclable Material pursuant to
310 CMR
30.200:
Provisions for Recyclable
Material and for Waste Oil,
310 CMR
30.400:
Requirements for Transporters
of Hazardous Waste, and
310 CMR
30.800:
Licensing Requirements and
Procedures, as applicable.
2. Description: approval of a change in
address, E.P.A. identification number, telephone number, waste
categories/codes, and the following which are not
310 CMR
30.828:
Transfer of Licenses
license transfers: name changes, stock transfers (less than 5%
equity/liability), and new owners/operators.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after May 1, 2020,
a. Within ten days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 20 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy any identified deficiencies within 30 days of the Department's statement
identifying deficiencies, if any.
d. Within 20 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a final review.
4. Permit application fee: $280.
Treatability Studies
(k)
(
HW07) Permits for hazardous waste.
1. Category: approval of hazardous waste
treatability studies pursuant to
310 CMR
30.010:
Definitions and
310 CMR
30.104(3)(c).
2. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 36 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 36 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
3. Permit
application fee: $2,695.
TSD Facilities
(l)
(
HW08) Permits for hazardous waste treatment, storage,
or disposal (TSD) facilities.
1. Category:
license to operate or approval of closure plan for TSD facility.
2. Description: licenses for facilities that
treat, store, or dispose of hazardous wastes, pursuant to
310 CMR
30.010:
Definitions,
310 CMR
30.099:
Interim Status
Facilities, and
310 CMR
30.800:
Licensing Requirements and
Procedures; approval of closure plans for such facilities pursuant to
310 CMR
30.010 and
310 CMR
30.580:
Closure.
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after March 24, 2017, individual rule project subject to
310 CMR
4.05.
4. Permit application fee: individual rule
project subject to
310 CMR
4.05.
TSD Facility Modification
(m) (
HW09) Permits
for TSD Facility Modifications.
1. Category:
Class I modifications.
2.
Description: modifications to TSD licenses pursuant to
310
CMR
30.852:
Facility License
Modification at the Request of the Licensee, which require prior
written approval of the Department pursuant to
310
CMR
30.852(2)(b) and Table
30.852:
Classification of License Modifications; and
modifications to TSD licenses pursuant to
310 CMR
30.099(5):
Changes
during Interim Status and
310
CMR
30.852 which require prior written
approval of the Department pursuant to
310
CMR
30.852(2)(b) and Table
30.852. 3. Schedule for timely action: for projects for which applications are
filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 24 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. The applicant may elect
to follow the procedures for Class II modifications. If the applicant so
elects, the fee and schedule provisions applicable to Class II modifications at
310 CMR
4.10(3)(n) shall apply.
4. Permit application fee: $215.
(n)
(
HW10) Permits for TSD Facility Modifications.
1. Category: Class II
modifications.
2. Description:
modifications of licenses for TSD facilities pursuant to
310
CMR
30.852(3):
Class
2 Modifications and Table 30.852:
Classification of License
Modifications; and modifications to TSD licenses pursuant to
310 CMR
30.099(5):
Changes
during Interim Status and
310
CMR
30.852(2):
Class
1 Modifications.
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after May 1, 2020,
a.
Within ten days of the latest date of receipt of the application, payment of
the application fee and filing of the public notice required by
310
CMR
30.852(2):
Class
1 Modifications, the Department shall complete an administrative
completeness review.
b. Within 96
days of making a determination of administrative completeness, the Department
shall complete a technical review.
c. The permit applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
d. Within 36
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
4. Permit application fee: $12,525.
(o)
(
HW11) Permits for TSD Facility Modifications.
1. Category: Class III
modifications.
2. Description:
modifications of licenses for TSD facilities pursuant to
310
CMR
30.852(4):
Class
1 Modifications and Table
310
CMR
30.852:
Classification of License
Modifications or
310
CMR
30.852(5):
Other
Modifications; and modifications to TSD licenses pursuant to
310 CMR
30.099(5):
Changes
During Interim Status, and
310
CMR
30.852(3):
Class
2 Modifications or
310
CMR
30.852(4):
Class
3 Modifications.
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after October 8, 2004, individual rule project subject to
310 CMR
4.05.
4. Permit application fee: individual rule project subject to
310 CMR
4.05.
Declassification
(p) (
HW16) Permit
for Declassification.
1. Category: approval
of declassification.
2.
Description: approval of petition to classify waste as nonhazardous pursuant to
310 CMR
30.141:
When a Hazardous Waste Ceases
to Be a Hazardous Waste and
310 CMR
30.142:
Petition to Classify a Waste
as Nonhazardous.
3.
Schedule for timely action: individual rule project subject to
310 CMR
4.05.
4. Permit application fee: for projects for
which applications are filed and fees received on or after July 1, 1992,
individual rule project subject to
310 CMR
4.05.
Research Facilities
(q) (
HW20) Permits
for hazardous waste research facilities.
1.
Category: license to operate a research facility where research studies are
conducted.
2. Description: licenses
for facilities which intend to conduct research studies or otherwise engage in
continuous research, development, and demonstration activities as defined in
310 CMR
30.010:
Definitions and which require prior Department approval or
approval to continue activities as required by
310 CMR
30.104(3)(d):
Research Study Samples and 30.864:
Research Facility
License.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on and after October 8, 2004, individual rule project subject to
310 CMR
4.05.
4. Permit application fee: individual rule
project subject to
310 CMR
4.05.
(4)
Solid Waste.
Facility Siting
(a) (
SW01) Permits
for solid waste facility siting.
1. Category:
solid waste facility site suitability report pursuant to
310 CMR 16.00:
Site
Assignment Regulations for Solid Waste Facilities for a new site or
expanded site or for a site assigned site applying for a major modification
where the site had never received a site suitability report.
2. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 21 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 60 days of receipt of proof that
the public notice requirement set forth in
310 CMR
16.10(4):
Public
Notice Application has been satisfied by the applicant, the Department
shall finish review and issue the site suitability report.
3. Permit application fee: $10,585.
(a)
(1) (
SW38) Permits
for solid waste facility siting.
1. Category:
solid waste facility site suitability report pursuant to
310
CMR
16.22:
Modifications to and
Rescissions and Suspensions of Site Assignments for a major
modification to site assignment where a site suitability report has previously
been issued for the site.
2.
Schedule for timely action: for projects for which applications are filed and
fees received on or after March 24, 2017,
a.
Within 21 days of receipt of an application and payment of the permit
application fee, the Department shall complete an administrative completeness
review.
b. Within 60 days of
receipt of proof that the public notice requirement set forth in
310 CMR
16.10(4):
Public
Notice Application has been satisfied by the applicant, the Department
shall finish review and issue the site suitability report.
3. Permit application fee: $1,920.
(b)
(1) (
SW46) Permits
for solid waste: recyclable and organic material management.
1. Category: permits for a new recycling,
composting or conversion operation handling recyclable or organic
material.
2. Description:
recycling, composting, or conversion operation pursuant to
310
CMR
16.05:
Permit for Recycling,
Composting or Conversion (RCC) Operations.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 60 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee:
a. A transfer operation limited to organic
material only that receives a maximum of two tons per day and has no more than
five tons on-site at any time: $1,000
b. Any other recycling, composting or
conversion operation: $8,750
(b)
(2)
(
SW47) Permits for solid waste: recyclable and organic
material management.
1. Category: permit
renewal or modification for recycling, composting, or conversion operation
handling recyclable or organic material.
2. Description: permit renewal or
modification for recycling, composting or conversion operation pursuant to
310
CMR
16.05:
Permit for Recycling,
Composting or Conversion (RCC) Operations.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 24 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 24 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 60 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee:
a. A transfer operation limited to organic
material only that receives a maximum of two tons per day and has no more than
five tons on site at any time: $200.
b. Any other recycling, composting or
conversion operation: $1,458.
Certain Modifications to Any
Facility
(d)
(1) (
SW45) Permits
for solid waste management.
1. Category:
presumptive approval procedure for certain modifications of any type of solid
waste management facility pursuant to
310
CMR
19.029(3):
Use
of Presumptive Approval Procedure at
310 CMR
19.034
.
2. Description: review of a notice of
modification pursuant to
310
CMR
19.029(3):
Use
of Presumptive Approval Procedure at
310 CMR
19.034
.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after May 1, 2020,
a. Within ten days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 45 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 45 days of the Department's statement
identifying deficiencies, if any.
d. Within 45 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $595.
Transfer Station and Handling
Facilities
(g)
(
SW05) Permits for solid waste transfer stations or
handling facilities.
1. Category: permit and
authorization to construct a new or expanded large transfer station, C&D
transfer station, large C&D processing facility, or other large handling
facility pursuant to
310
CMR
19.029(1):
Use
of Permit Procedure at
310
CMR 19.032
, and
310 CMR
19.041:
Authorization to
Construct.
2. Description:
authorization to construct a large transfer station, C&D transfer station,
large C&D processing facility or other large handling facility, any of
which receives 50 tons per day or more.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 60 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 60 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 60 days of the
close of the period of public comment, including any public hearing, the
Department shall complete a public comment review.
f. Where a variance is required pursuant to
310 CMR
19.080:
Variances, the time periods for completion of technical and
public comment reviews shall each be increased by 30 days.
4. Permit application fee:
$7,235.
(h)
(
SW19) Permits for solid waste transfer stations or
other handling facilities.
1. Category:
permit and authorization to construct a new or expanded small transfer station,
small C&D processing facility or other small handling facility pursuant to
310
CMR
19.029(1):
Use
of Permit Procedure at
310
CMR 19.032
, and 19.041:
Authorization to Construct.
2. Description: authorization to construct a
small transfer station, small C&D processing facility, or other small
handling facility, any of which receives less than 50 tons per day.
3. Schedule for timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 24 days of the
close of the period of public comment, including any public hearing, the
Department shall complete a public comment review.
f. Where a variance pursuant to
310 CMR
19.080:
Variances is required, the time periods for completion of
technical and public comment reviews shall each be increased by 30
days.
4. Permit
application fee: $2,075.
(i) (
SW06) Permits
for solid waste transfer stations or other handling facility.
1. Category: authorization to operate or
renew operation permit for a C&D transfer station, large C&D processing
facility, or other large handling facility pursuant to
310
CMR
19.029(2):
Use
of Permit Procedures at
310
CMR 19.033
and 19.042:
Authorization to Operate.
2. Description: authorization to operate or
renew operation permit for a C&D transfer station, large C&D processing
facility, or other large handling facility any of which receives 50 tons per
day or more excluding non-C&D transfer station.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 36 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 36 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,940.
(j) (
SW20) Permits
for solid waste transfer station or other handling facility.
1. Category: authorization to operate or
renew operation permit for a small C&D processing facility or other small
handling facility pursuant to
310
CMR
19.029(2):
Use
of Permit Procedures at
310
CMR 19.033
and 19.042:
Authorization to Operate.
2. Description: authorization to operate or
renew operation permit for a small C&D processing facility or other small
handling facility, any of which receives less than 50 tons per day excluding
all small transfer stations.
3.
Schedule for timely action: for projects for which applications are filed
and/or fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 20 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 20 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $985.
(k) (
SW07) Permits
for solid waste transfer stations or other handling facilities.
1. Category: modification of permit for
previously approved C&D transfer station, large C&D processing facility
or other large handling facility pursuant to
310
CMR
19.029(2):
Use
of Permit Procedure at
310
CMR 19.033
.
2. Description: modification of permit for a
C&D transfer station, large C&D processing facility or other large
handling facility which receives 50 tons per day or more excluding all small
transfer stations.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $3,235.
(l) (
SW21) Permits
for solid waste transfer stations or other handling facilities.
1. Category: modification of permit for
previously approved, small C&D processing facility or other small handling
facility pursuant to
310
CMR
19.029(2):
Use
of Permit Procedure at
310
CMR 19.033
.
2. Description: modification of permit for a
small C&D processing facility or other small handling facility which
receives less than 50 tons per day excluding non-C&D transfer
station.
3. Schedule for timely
action: for projects for which applications are filed and/or fees received on
or after March 24, 2017,
a. Within 24 days of
receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 20 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 20 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,380.
Existing Landfill
(m)
(
SW08) Permits for solid waste landfill.
1. Category: authorization to construct in an
existing permitted landfill pursuant to
310 CMR
19.041:
Authorization to
Construct.
2. Description:
authorization to construct in an existing permitted landfill area where
construction requires additional approval in phases pursuant to
310 CMR
19.041:
Authorization to
Construct and the initial permit.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 36 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 36 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 72 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee: $1,780.
(o)
(
SW10) Permits for solid waste landfill.
1. Category: authorization to operate a
landfill, pursuant to 310 CMR
19. 042:
Authorization to
Operate.
2. Description:
authorization to operate new phases of a permitted landfill as required
pursuant to
310 CMR
19.042:
Authorization to
Operate and the initial permit.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 36 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 36 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,940.
(p) (
SW11) Permits
for solid waste landfill.
1. Category: major
modification of landfill permit pursuant to
310
CMR
19.029(2):
Use
of Permit Procedure at
310
CMR 19.033
.
2. Description: major modification of a
landfill plan where a design change will result in the construction of an
appurtenance or structure.
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after March 24, 2017,
a.
Within 24 days of receipt of an application and payment of the permit
application fee, the Department shall complete an administrative completeness
review.
b. Within 72 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 180 days of the
Department's statement identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Where a variance
pursuant to
310 CMR
19.080:
Variances is required, the time periods for completion of
technical reviews shall each be increased by 30 days.
4. Permit application fee,
a. Where the Secretary of Energy and
Environmental Affairs determines that additional review pursuant to the
Massachusetts Environmental Policy Act (MEPA) and
301 CMR
11.00:
MEPA Regulations is required:
$5,290.
b. Where additional review
pursuant to MEPA is not required: $3,880.
(q) (
SW22) Permits
for solid waste landfill.
1. Category: minor
modification of a landfill pursuant to
310
CMR
19.029(2):
Use
of Permit Procedure at
310
CMR 19.033
.
2. Description: modification of a landfill
permit with a change in operations, equipment or daily capacity but not
construction of an appurtenance or structure.
3. Schedule for timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 20 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 20 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Where a variance
pursuant to
310 CMR
19.080:
Variances is required, the time periods for completion of
technical reviews shall each be increased by 30 days.
4. Permit application fee
$1,380.
(r)
(
SW12) Permits for solid waste landfill.
1. Category: approval of landfill closure and
assessment evaluation pursuant to
310 CMR
19.150:
Landfill Assessment
Requirements.
2.
Description: approval of complete initial site assessment and draft scope of
work for a comprehensive site assessment pursuant to
310 CMR
19.150(4):
Initial
Site Assessment.
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after March 24, 2017,
a.
Within 24 days of receipt of an application and payment of the permit
application fee, the Department shall complete an administrative completeness
review.
b. Within 36 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 90 days of the Department's
statement identifying deficiencies, if any.
d. Within 36 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,380.
(s) (
SW23) Permit
for solid waste landfill.
1. Category:
approval of landfill closure and assessment evaluation pursuant to
310 CMR
19.150:
Landfill Assessment
Rewuirements.
2.
Description: approval of complete landfill comprehensive site assessment
pursuant to
310 CMR
19.150(5):
Comprehensive Site Assessment.
3. Schedule of timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 60 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 60 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $5,645.
(t) (
SW24) Permit
for solid waste landfill.
1. Category:
approval of landfill closure and assessment evaluation pursuant to
310 CMR
19.150:
Landfill Assessment
Requirements.
2.
Description: Approval of a corrective action alternative analysis report
pursuant to
310 CMR
19.150(6):
Comprehensive Site Assessment.
3. Schedule of timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $3,565.
(u) (
SW25) Permit
for solid waste landfill.
1. Category:
approval landfill closure and assessment evaluation pursuant to
310 CMR
19.150:
Landfill Assessment
Requirements.
2.
Description: approval of the corrective action design pursuant to
310 CMR
19.151(2)(a):
Corrective Action Design.
3. Schedule of timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $4,255.
(u)
(1)
(
SW43) Permits for solid waste landfill.
1. Category: Determination of landfill
closure completion pursuant to
310 CMR
19.140(6):
Completion of Closure.
2. Description: approval of documentation of
closure and post-closure planning.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Where a variance
pursuant to
310 CMR
19.080:
Variances is required, the time periods for completion of
technical reviews shall each be increased by 30 days.
4. Permit application fee:
$2,435.
New Landfill or Expanded Existing
Landfill
(v)
(
SW26) Permit for solid waste landfill.
1. Category: permit and authorization to
construct new large landfill or large expansion of permitted landfill pursuant
to
310
CMR
19.029(1):
Use
of Permit Procedure at
310
CMR 19.032
and 19.041:
Authorization to Construct.
2. Description: permit to construct a new
landfill with 250 acre-feet or more of disposal volume or expand a permitted
landfill by 250 feet or more of disposal volume.
3. Schedule of timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017, individual rule project subject to
310 CMR
4.05.
4. Permit application fee: individual rule
project subject to
310 CMR
4.05.
(w) (
SW27) Permit
for solid waste landfill.
1. Category: Permit
and authorization to construct new medium sized landfill or medium expansion of
permitted landfill pursuant to
310
CMR
19.029(1):
Use
of Permit Procedure at
310
CMR 19.032
and 19.041:
Authorization to Construct.
2. Description: permit to construct a new
landfill with greater than 25 acre-feet but less than 250 feet of disposal
volume or to expand a permitted landfill by greater than 25 feet but less than
250 feet of disposal volume.
3.
Schedule of timely action: for projects for which applications are filed and/or
fees received on or after March 24, 2017,
a.
Within 24 days of receipt of an application and payment of the permit
application fee, the Department shall complete an administrative completeness
review.
b. Within 80 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 180 days of the
Department's statement identifying deficiencies, if any.
d. Within 80 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 72 days after the
close of any public comment period including public hearing, the Department
shall complete a public comment review, make any adjustments to the draft
permit and issue a final permit decision.
f. Where a variance pursuant to
310 CMR
19.080:
Variances is required, the time periods for completion of
technical and public comment reviews shall each be increased by 30
days.
4. Permit
application fee: $28,555.
(x) (
SW28) Permit
for solid waste landfill.
1. Category: permit
and authorization to construct new small landfill or to construct small
expansion of permitted landfill pursuant to
310
CMR
19.029(1):
Use
of Permit Procedure at
310
CMR 19.032
and 19.041:
Authorization to Construct.
2. Description: permit to construct a new
landfill with no more than 25 acre-feet of disposal volume or to expand a
permitted landfill by no more than 25 acre-feet disposal volume.
3. Schedule of timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 72 days after the
close of any public comment period including public hearing, the Department
shall complete a public comment review, make any adjustments to the draft
permit and issue a final permit decision.
f. Where a variance pursuant to
310 CMR
19.080:
Variances is required, the time periods for completion of
technical and public comment reviews shall each be increased by 30
days.
4. Permit
application fee: $14,275.
(y) (
SW29) Permit
for solid waste landfill.
1. Category: permit
and authorization to construct new woodwaste landfill or to construct the
expansion of a permitted woodwaste landfill pursuant to
310
CMR
19.029(1):
Use
of Permit Procedure at
310
CMR 19.032
and 19.041:
Authorization to Construct.
2. Description: permit and authorization to
construct a new woodwaste landfill or expand woodwaste capacity of a permitted
landfill to dispose of uncontaminated woodwaste pursuant to
310 CMR
19.006:
Definitions, including reclamation activities but excluding
construction and demolition material.
3. Schedule of timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 72 days after the
close of any public comment period including public hearing, the Department
shall complete a public comment review, make any adjustments to the draft
permit and issue a final permit decision.
f. Where a variance pursuant to
310 CMR
19.080:
Variances is required, the time periods for completion of
technical and public comment reviews shall each be increased by 30
days.
4. Permit
application fee: $14,275.
(z) (
SW48) Permit
for a Solid Waste Facility Third Party Inspector.
1. Category: registration of solid waste
facility inspector pursuant to
310 CMR
19.018(5):
General
Requirements, Registration and Qualification for Third Party
Inspectors.
2.
Description: filing of a Solid Waste Facility Inspector Qualifications
Statement.
3. Schedule of timely
action: for a qualifications statement filed and fees received on or after
March 24, 2017,
a. Within 24 days of receipt
of a qualifications statement and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 24 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 24 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $595.
Determinations
(z)
(1) (
SW39) Permits
for solid waste management.
1. Category:
determination of beneficial use - use of secondary materials in commercial
products pursuant to
310 CMR
19.060(14):
Category
1 - Use of Secondary Materials in Commercial Products.
2. Description: determination that the
proposed use of a solid waste constitutes the beneficial use of a secondary
material when reviewed in accordance with
310 CMR
19.060(14):
Category
1 - Use of Secondary Materials in Commercial Products and that such
material is no longer classified as a solid waste per approval.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 24 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 24 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $ 2,375.
(aa)
(1)
(
SW40) Permits for solid waste management.
1. Category: determination of beneficial use
- use of secondary materials in a DEP regulated system pursuant to
310 CMR
19.060(15):
Category
2 - Use of Secondary Materials in Regulated Systems.
2. Description: a determination that the
proposed use of a solid waste constitutes the beneficial use of a secondary
material when reviewed in accordance with
310 CMR
19.060(15):
Category
1 - Use of Secondary Materials in Regulated Systems and that such
material is adequately regulated and no longer classified as a solid waste per
approval.
3. Schedule for timely
action: for projects for which applications are filed and/or fees received on
or after March 24, 2017,
a. Within 24 days of
receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 24 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 24 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $2,375.
(aa)
(2)
(
SW41) Permits for solid waste management.
1. Category: determination of beneficial use
- use of secondary materials in restricted applications pursuant to
310 CMR
19.060(16):
Category
3 - Use if Secondary Materials in Regulated Applications.
2. Description: determination that the
proposed use of a solid waste constitutes the beneficial use of a secondary
material when reviewed in accordance with
310 CMR
19.060(16):
Category
3 - Use of Secondary Materials in Regulated Applications and that such
material is no longer classified as a solid waste per approval.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $4,455.
(aa)
(3)
(
SW42) Permits for solid waste management.
1. Category: determination of beneficial use
- use of a secondary material in an unrestricted application pursuant to
310 CMR
19.060(17):
Category
4 - Use of Secondary Materials in Unrestricted Applications.
2. Description: a determination that the
proposed use of a solid waste constitutes the beneficial use of a secondary
material when reviewed in accordance with
310 CMR
19.060(17):
Category
4 - Use of Secondary Materials in Unrestricted Applications and that
such material is no longer classified as a solid waste per approval.
3. Schedule of timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017 individual rule project subject to
310 CMR
4.05.
4. Permit application fee: individual rule
project subject to
310 CMR
4.05.
(aa)
(4)
(
SW44) Permits for solid waste management.
1. Category: determination of beneficial use
- modification.
2. Description:
modification of a previously approved determination of beneficial use permit in
accordance with
310 CMR
19.060:
Beneficial Use of Solid
Waste.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 24 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 24 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,065.
(aa)
(5)
(
SW49) Permits for solid waste management.
1. Category: certification of transfer of
permit for any type of solid waste management facility pursuant to
310 CMR
19.044:
Transfer of
Permits.
2. Description:
submission of a transfer of permit certification pursuant to
310 CMR
19.044:
Transfer of
Permits.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after May 1, 2020,
a. Within ten days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 45 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 45 days of the Department's statement
identifying deficiencies, if any.
d. Within 45 of receipt of materials from the
applicant in response to the Department's statement identifying deficiencies,
the Department shall complete a supplemental technical review.
4. Permit application fee:
$595.
(bb)
(
SW14) Permits for solid waste management.
1. Category: special waste
determination.
2. Description:
approval for a facility to accept a listed special waste pursuant to
310
CMR
19.029(3):
Use
of Presumptive Approval Procedure at
310 CMR
19.034
and
310 CMR
19.061:
Special Waste.
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after May 1, 2020,
a.
Within ten days of receipt of an application and payment of the permit
application fee, the Department shall complete an administrative completeness
review.
b. Within 45 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 45 days of the Department's
statement identifying deficiencies, if any.
d. Within 45 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,940.
Combustion Facility
(dd) (
SW15) Permits
for solid waste combustion facility.
1.
Category: Permit and authorization to construct a new solid waste combustion
facility or expansion of an existing facility, pursuant to
310
CMR
19.029(1):
Use
of Permit Procedure at
310
CMR 19.032
and 19.041:
Authorization to Construct.
2. Schedule for timely action: for projects
filed on or after March 24, 2017, individual rule project subject to
310 CMR
4.05.
3. Permit application fee: individual rule
project subject to
310 CMR
4.05.
(ee) (
SW16) Permits
for solid waste combustion facility.
1.
Category: Authorization to operate or modify an existing combustion facility
pursuant to
310
CMR
19.029(2):
Use
of Permit Procedure at
310
CMR 19.033
.
2. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Where a variance
pursuant to
310 CMR
19.080:
Variances is required, the time periods for completion of
technical reviews shall each be increased by 30 days.
3. Permit application fee: $5,290.
Demonstration Projects
(ff)
(
SW32) Permit for Solid Waste Demonstration Project.
1. Category: approval for a demonstration
project pursuant to 310 CMR
19. 062:
Demonstration Projects or
Facilities.
2.
Description: Approval of a scope of work for demonstrating the effectiveness
and utility of a new or innovative solid waste management technology.
3. Schedule for timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $2,075.
(gg) (
SW33) Permit
for Solid Waste Demonstration Project.
1.
Category: approval of a demonstration project report pursuant to
310 CMR
19.062(4):
Department Evaluation of Demonstration Projects.
2. Description: Approval of a report
providing the results of a demonstration project approved pursuant to 310 CMR
4.10(4)(ff).
3. Schedule for timely
action: for projects for which applications are filed and/or fees received on
or after March 24, 2017,
a. Within 24 days of
receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $4,950.
(hh) (
SW35) Permit
for Solid Waste: Recycling, Composting, or Conversion Demonstration Project.
1. Category: approval of a demonstration
project pursuant to
310
CMR
16.05(8):
Demonstration Project for Recycling, Composting or Converting
Recyclable or Organic Material.
2. Description: approval for a project to
demonstrate the effectiveness and utility of a new or innovative recycling,
composting, or conversion technology for recyclable or organic
material.
3. Schedule for timely
action: for projects for which applications are filed and/or fees received on
or after March 24, 2017,
a. Within 24 days of
receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 24 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 24 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 24 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee: $1,458.
(ii)
(
SW36) Permits for Post-closure Use.
1. Category: permit for post-closure use:
major category. Approval of a post-closure use at a solid waste management
facility site pursuant to
310 CMR
19.016:
Post-closure Use, 19.029(2):
Use of Permit Procedure
at
310
CMR 19.033
and, when the
post-closure use is at a landfill,
310 CMR
19.143:
Post-closure
Use.
2. Description:
approval for post-closure use that is not subject to SW37.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy any identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $3,425.
(jj) (
SW37) Permits
for Post-closure Use.
1. Category: permit for
post-closure use: minor category. Approval of a post-closure use at a solid
waste management facility site pursuant to
310 CMR
19.016:
Post-closure Use, 19.029(3):
Use of Presumptive
Approval Procedure at
310 CMR
19.034
and, when the post-closure
use is at a landfill,
310 CMR
19.143:
Post-closure
Use.
2. Description:
approval for post-closure use that:
a. does
not affect the facility's appurtenances, or
b. is not located on the final cover of a
landfill.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after May 1, 2020,
a. Within ten days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 45 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy any identified deficiencies within 45 days of the Department's statement
identifying deficiencies, if any.
d. Within 45 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,330.
(6)
Water Supply.
(a) (WS)
reserved
(b)
(WS) reserved
(c) (WS)
reserved
(d)
(WS) reserved
(e) (
WS) reserved
Underground Injection Control
(f)
(
WS06) Permits for water supply, underground injection
control.
1. Category: registration of
underground injection wells and Pre-closure Notification.
2. Description: registration of underground
injection wells pursuant to
310 CMR
27.08:
Registration and Pre-closure Notification pursuant to
310 CMR
27.04:
Prohibited Activities
and
310 CMR
27.12:
Corrective Action; excluding registration for residential
facilities up to four units having only residential activities; and excluding
registration in communities where permit review for the UIC well type has been
delegated by the Department pursuant to an approved Memorandum of
Agreement.
3. Schedule for timely
action: for projects for which applications are filed and fees received on or
after March 24, 2017,
a. Within 24 days of
receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 24 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 24 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee:
a. Well codes 5A24 with the
exception of abandoned wells, 5B6, 5C4, 5G1, and 5K pursuant to
40 CFR
144.6 and
146.5:
$585.
b. Well codes 4P, 5A19, 5A23,
5B2, 5B3, 5C3, 5C5, 5H2, 5H3, and 5X pursuant to
40 CFR
144.6 and
146.5:
$290.
c. Well codes 5A18, 5A24
abandoned wells only, 5B1, 5C2, 5E, and 5H1 pursuant to
40 CFR
144.6 and
146.5:
$110.
d. Pre-closure Notification
pursuant to 310 CMR
27. 04:
Prohibited Activities and 27.12:
Corrective Action: $110.
(g) (WS )
reserved
(h)
(WS) reserved
Zone 2 Determination for Existing Sources of
Drinking Water
(i)
(
WS07) Zone 2 determination for existing sources of
drinking water
1. Category: approval to
conduct a pumping test at an existing source for purposes of Zone II
delineation.
2. Schedule for timely
action: for projects for which applications are filed and fees received on or
after March 24, 2017,
a. Within 24 days of
receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 36 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 36 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $970.
(j) (
WS08) Zone 2
determination for existing sources of drinking water.
1. Category: approval of Zone II delineation
for existing source.
2. Schedule
for timely action: for projects for which applications are filed and fees
received on or after March 24, 2017,
a. Within
24 days of receipt of an application and payment of the permit application fee,
the Department shall complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
3. Permit
application fee: $3,235.
(k) (WS)
reserved
(l)
(
WS) reserved
Cross Connection
(n) (
WS10) Permits
for water supply: cross connections.
1.
Category: certification of backflow prevention device testers and cross
connection surveyors pursuant to
310 CMR
22.22(13):
Inspection Surveying and Overhauling of Devices.
2. Schedule for timely action: for projects
for which applications are filed and fees received on or after May 1, 2020,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 24 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 24 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee:
a. certification of cross
connection surveyor excluding currently certified testers: $65.
b. certification of backflow prevention
device tester excluding currently certified surveyors: $65.
c. certification of backflow prevention
device tester and cross connection surveyor: $65.
New Technology Approval
(o) (
WS11) Permits
for water supply: new technology approval.
1.
Category: approval of minor new technology for treatment of drinking
water.
2. Description: minor new
technology approval pursuant to
310
CMR
22.04(8):
New
Product or Technology where no other Department program or interagency
review is required of the new technology. Pilot testing may be
required.
3. Schedule for timely
action: for projects for which applications are filed and fees received on or
after March 24, 2017,
a. Within 24 days of
receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $2,265.
(p) (
WS27) Permits
for water supply: new technology approval.
1.
Category: approval of new technology additives and coatings.
2. Description: approval of drinking water
new technology additives and coatings previously approved by a third-party
pursuant to
310
CMR
22.04(8):
New
Product or Technology.
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after March 24, 2017,
a.
Within 24 days of receipt of an application and payment of the permit
application fee, the Department shall complete an administrative completeness
review.
b. Within 24 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 30 days of the Department's
statement identifying deficiencies, if any.
d. Within 24 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $290.
(q) (
WS31) Permits
for vending and POU/POE Devices.
1. Category:
approval pursuant to
310
CMR
22.04(1):
New or
Substantially Modified Public Water Systems and 22.23(4) for vending
machines and POU/POE treatment devices that have previous third party
approval.
2. Schedule for timely
action: for projects for which applications are filed and fees received on or
after March 24, 2017,
a. Within 24 days of
receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
3. Permit
application fee: $290.
(r) (
WS28) Permits
for new technology.
1. Category: approval of
one vending site/source prototype pursuant to
310
CMR
22.04(4):
Prohibition on Construction or Substantially Modification of a Public
Water System Without Prior Department Approval -- minor.
2. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
3. Permit
application fee: $1,380.
(s) (
WS12) Permits
for water supply: new technology approval.
1.
Category: approval of major new technology for treatment of drinking
water.
2. Description: major new
technology approval for treatment of drinking water pursuant to
310
CMR
22.04(8):
New
Product Technology where no other Department program or inter-agency
review is required of the new technology.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
2009, individual rule project subject to
310 CMR
4.05.
4. Permit application fee: individual rule
project.
Water Quality Assurance/New Source
Approval
(t) (
WS13) Permits
for water supply, water quality assurance: new source approval.
1. Category: Approval to site source under 70
gallons per minute pursuant to
310 CMR
22.21:
Ground Water Supply
Protection.
2.
Description: approval of exploratory phase work, site examination and land use
survey, and approval to conduct pumping test in accordance with the current
guidelines and policies for public water systems and
310 CMR
22.21:
Ground Water Supply
Protection.
3. Schedule
for timely action: for projects for which applications are filed and fees
received on or after March 24, 2017,
a.
Within 24 days of receipt of an application and payment of the permit
application fee, the Department shall complete an administrative completeness
review.
b. Within 48 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 60 days of the Department's
statement identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,380.
(u) (Reserved)
(v) (
WS15) Permits
for water supply: water quality assurance: new source approval.
1. Category: approval of pumping test report
and approval to construct sources under 70 gallons per minute in accordance
with current guidelines and policies for public water systems and
310 CMR
22.21:
Ground Water Supply
Protection.
2. Schedule
for timely action: for projects for which applications are filed and fees
received on or after March 24, 2017,
a.
Within 24 days of receipt of an application and payment of the permit
application fee, the Department shall complete an administrative completeness
review.
b. Within 48 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 60 days of the Department's
statement identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,585.
(v)
(1)
(
WS37) Permits for water supply, water quality
assurance: new source approval.
1. Category:
approval of new transient non-community source under 10,000 gallons per
day.
2. Description: approval of
land use survey, pumping test report, and approval to construct source pursuant
to
310 CMR
22.21:
Ground Water Supply
Protection.
3. Schedule
for timely action: for projects for which applications are filed and fees
received on or after March 24, 2017,
a.
Within 24 days of receipt of an application and payment of the permit
application fee, the Department shall complete an administrative completeness
review.
b. Within 48 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 60 days of the Department's
statement identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $810.
(x) (
WS17) Permits
for water supply, water quality assurance: new source approval.
1. Category: approval to site source 70
gallons per minute or greater and to conduct pumping test.
2. Description: approval to site source 70
gallons per minute or greater by approval of exploratory phase work, site
screening, site examination, land use survey, and approval to conduct pumping
test pursuant to
310 CMR
22.21:
Ground Water Supply
Protection.
3. Schedule
for timely action: for projects for which applications are filed and fees
received on or after March 24, 2017,
a. Within
24 days of receipt of an application and payment of the permit application fee,
the Department shall complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $4,850.
(z) (
WS19) Permits
for water supply: water quality assurance: new source approval.
1. Category: approval of pumping test report
for source 70 gallons per minute or greater pursuant to
310 CMR
22.21:
Ground Water Supply
Protection.
2. Schedule
for timely action: for projects for which applications are filed and fees
received on or after March 24, 2017,
a.
Within 48 days of receipt of an application and payment of the permit
application fee, the Department shall complete an administrative completeness
review.
b. Within 96 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 180 days of the
Department's statement identifying deficiencies, if any.
d. Within 96 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
3. Permit
application fee: $8,205.
(aa) (
WS20) Permits
for water supply: water quality assurance: new source approval.
1. Category: approval to construct source 70
gallons per minute or greater pursuant to
310 CMR
22.21:
Ground Water Supply
Protection.
2. Schedule
for timely action: for projects for which applications are filed and fees
received on or after March 24, 2017,
a. Within
24 days of receipt of an application and payment of the permit application fee,
the Department shall complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. A WS20 application may
be submitted concurrently with a WS19 application in which case both permits
will be subject to the WS19 application schedule for timely action.
3. Permit application fee: $2,910.
Water Quality Assurance/Water
Treatment
(bb)
(
WS21) Permits for water supply, water quality
assurance: water treatment.
1. Category:
approval to conduct pilot study.
2.
Description: approval to conduct pilot study pursuant to
310 CMR
22.03(1) and
(2) and
22.04:
Construction, Operation and Maintenance of Public Water
Systems.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 48 days
of receipt of an application and payment of the permit application fee, the
Department shall complete a technical review.
b. The permit applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 48
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
4. Permit application fee:
a. Less than 40,000 gallons per day:
$320.
b. 40,000 gallons per day or
more and less than 200,000 gallons per day: $485.
c. 200,000 gallons per day or more and less
than one million gallons per day: $850.
d. One million gallons per day or more:
$1,135.
(cc)
(
WS22) Permits for water supply, water quality
assurance: water treatment.
1. Category:
approval of pilot study report.
2.
Description: approval of pilot study report pursuant to
310 CMR
22.03(1) and
(2) and
22.04:
Construction, Operation and Maintenance of Public Water
Systems.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 48 days
of receipt of an application and payment of the permit application fee, the
Department shall complete a technical review.
b. The permit applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 48
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
4. Permit application fee:
a. Less than 40,000 gallons per day:
$915.
b. 40,000 gallons per day or
more and less than 200,000 gallons per day: $1,600.
c. 200,000 gallons per day or more and less
than one million gallons per day: $2,160.
d. One million gallons per day or more:
$2,850.
(dd)
(
WS23) Permits for water supply: water treatment.
1. Categories: approval to construct a
facility to treat drinking water.
2. Description: approval to construct a
facility to treat drinking water in daily volumes of less than one million
gallons per day pursuant to
310 CMR
22.03(1) and
(2) and
22.04:
Construction, Operation and Maintenance of Public Water
Systems.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee:
a. Less than 40,000 gallons
per day: $1,125.
b. 40,000 gallons
per day or more, and less than 200,000 gallons per day: $1,780.
c. 200,000 gallons per day or more, and less
than one million gallons per day: $5,005.
(ee) (
WS24) Permits
for water supply water quality assurance: water treatment.
1. Category: treatment approval to construct
a facility to treat 1 mgd or greater pursuant to
310 CMR
22.03(1) and
(2) and
22.04:
Construction, Operation and Maintenance of Public Water
Systems.
2. Schedule for
timely action: for applications filed on or after March 24, 2017, individual
rule project subject to
310 CMR
4.05.
3. Permit application fee: individual rule
project subject to
310 CMR
4.05.
(ff) (
WS25) Permits
for water supply water quality assurance: water treatment
1. Category: approval of treatment facility
modification.
2. Description:
approval of treatment facility modification permit pursuant to
310 CMR
22.03(1) and
(2) and
22.04:
Construction, Operation and Maintenance of Public Water
Systems.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee:
a. Less than 40,000 gallons
per day: $550.
b. 40,000 gallons
per day or more, and less than 200,000 gallons per day: $860.
c. 200,000 gallons per day or more, and less
than one million gallons per day: $2,210.
d. One million gallons per day or more:
$3,070.
(gg)
(
WS29) Permits for water quality assurance: water
treatment.
1. Category: approval of chemical
addition retrofit of water systems that serve more than 3300 people.
2. Description: approval of water treatment
modifications for the addition of chemicals pursuant to
310 CMR
22.03(1) and
(2) and
22.04:
Construction, Operation and Maintenance of Public Water
Systems.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $705.
(gg)
(1)
(
WS34) Permits for water quality assurance: water
treatment.
1. Category: approval of chemical
addition retrofit of water systems that serve less than or equal to 3300
people.
2. Description: approval of
water treatment modifications for the addition of chemicals pursuant to
310 CMR
22.03(1) and
(2) and
22.04:
Construction, Operation and Maintenance of Public Water
Systems.
3. Schedule of
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $350.
Water Quality Assurance
(hh) (
WS26) Permits
for water quality assurance.
1. Category:
approval of sale of land for water supply purposes pursuant to
310
CMR
22.24:
Sale, Transfer of Property
Interest, or Change in Use of Water Supply Land, or of acquisition of
land to be used for water supply purposes pursuant to M.G.L. c. 165, §
4B.
2. Schedule for timely action:
for projects for which applications are filed and fees received on or after
March 24, 2017
a. Within 48 days of receipt
of an application and payment of the permit application fee, the Department
shall complete a technical review.
b. The permit applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 48
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
3. Permit Application fee:
$1,290.
(hh)
(1) (
WS32) Permits
for water quality assurance: Distribution System Modifications.
1. Category: approval of distribution system
modifications such as storage tanks, distribution pump stations, transmission
main installation, etc. for water systems that serve more than
3300 people.
2. Description:
approval of distribution system modifications pursuant to
310 CMR
22.03(1) and
(2) and
22.04:
Construction, Operation and Maintenance of Public Water
Systems.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,055.
(hh)
(2)
(
WS33) Permits for water quality assurance:
Distribution System Modifications.
1.
Category: approval of distribution system modifications such as storage tanks,
distribution pump stations, transmission main installation,
etc. for water systems that serve less than or equal to 3300
people.
2. Description: approval of
distribution system modifications pursuant to
310 CMR
22.03(1) and
(2) and
22.04:
Construction, Operation and Maintenance of Public Water
Systems.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $525.
(hh)
(3)
(
WS36) Permits for water quality assurance.
1. Category: approval of abandonment of a
water source pursuant to
310 CMR
22.25:
Abandonment of Water Supply
Sources.
2. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017.
a. Within 48 days
of receipt of an application and payment of the permit application fee, the
Department shall complete a technical review.
b. The permit applicant may remedy any
identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
c. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
3. Permit
application fee: $70.
(ii) (
WS30) Permits
for water supply: vending machine and POU/POE treatment device.
1. Category: approval to install vending
machine or POU/POE water treatment device.
2. Description: approval to install one type
of vending machine or POU/POE water treatment device at one to nine locations
on the same public water distribution system pursuant to
310 CMR
22.03(1) and
(2) and
22.04:
Construction, Operation and Maintenance of Public Water
Systems.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee:
a. One type of vending
machine at one to nine locations: $290.
b. One type of POU/POE device at one to nine
locations: $290.
(ii)
(1)
(WS35) Permits for water supply: vending machine and
POU/POE treatment device.
1. Category:
approval to install vending machine or POU/POE water treatment
device.
2. Description: approval to
install one type of vending machine or POU/POE water treatment device at ten or
more locations on the same public water distribution system pursuant to
310 CMR
22.03(1) and
(2) and
22.04:
Construction, Operation and Maintenance of Public Water
Systems.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials for
the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee:
a. One type of vending
machine at ten or more locations: $1,630.
b. One type of POU/POE device at ten or more
locations: $1,630.
Well Drilling
(ii)
(2)
(
WS39) Permits for water supply, well drillers.
1. Category: well driller
certification.
2. Description: well
driller certification pursuant to
310 CMR
46.02:
Certification
Requirements.
3. Schedule
for timely action: for projects for which applications are filed and fees
received on or after March 24, 2017,
a.
Within 45 days of receipt of an application and payment of the permit
application fee, the Department shall complete a technical review.
b. The permit applicant may remedy identified
deficiencies within 90 days of the Department's statement identifying
deficiencies, if any.
c. Within 45
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
4. Permit application fee: $200.
(ii)
(3) (
WS40) Permits
for water supply, well drillers.
1. Category:
well driller certification renewal.
2. Description: well driller certification
renewal and renewal of certification with waiver pursuant to
310 CMR
46.02:
Certification
Requirements and 46.03(4):
Annual Renewal.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 45 days of receipt of an
application and payment of the permit application fee, the Department shall
complete a technical review.
b. The
permit applicant may remedy identified deficiencies within 90 days of the
Department's statement identifying deficiencies, if any.
c. Within 45 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $100.
(ii)
(4)
(
WS41) Permits for water supply, well drillers.
1. Category: well driller certification with
waiver.
2. Description: initial
well driller certification with waiver of some requirements pursuant to
310 CMR
46.02(3):
Waiver.
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after March 24, 2017,
a.
Within 45 days of receipt of an application and payment of the permit
application fee, the Department shall complete a technical review.
b. The permit applicant may remedy identified
deficiencies within 90 days of the Department's statement identifying
deficiencies, if any.
c. Within 45
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
4. Permit application fee: $400.
(ii)
(5) (
WS42) Permits
for water supply, well drillers.
1. Category:
well drilling rig permit and decal and renewal of permit and decal.
2. Description: well drilling rig permit and
decal pursuant to
310 CMR
46.03(1)(c):
Rig
Permit and Rig Markings for Field Identification and renewal of permit
and decal pursuant to
310 CMR
46.03(4):
Annual
Renewal.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 45 days
of receipt of an application and payment of the permit application fee, the
Department shall complete a technical review.
b. The permit applicant may remedy identified
deficiencies within 90 days of the Department's statement identifying
deficiencies, if any.
c. Within 45
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
4. Permit application fee: $100 per
rig.
Watershed Management
Water Withdrawals
(mm) (
WM01) Permits
for watershed management.
1. Category:
transfer of right to withdraw water pursuant to
310 CMR
36.09:
Transfer of a Registration
Statement (registrations) or
310 CMR
36.33:
Transfer of a Permit
(permits).
2. Schedule for
timely action: for projects for which applications are filed and fees received
on or after May 1, 2020,
a. Within 24 days of
receipt of an application and payment of the permit application fee, the
Department shall complete a technical review.
b. The permit applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 24
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
3. Permit application fee:
$215.
(nn)
(
WM02) Permits for watershed management.
1. Category: amendments to existing
withdrawal permits pursuant to
310 CMR
36.29:
Permit Amendments,
Suspensions, and Terminations.
2. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 36 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 36 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
3. Permit
application fee: $1,940.
(oo) (
WM03) Permits
for watershed management.
1. Category:
withdrawal permits.
2. Description:
withdrawal permits pursuant to
310 CMR 36.00:
Massachusetts Water Resources Management Program.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 30 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies.
d. Within
72 days of receipt of materials from the applicant in response to the
Department's statement identifying deficiencies, the Department shall complete
a supplemental technical review.
4. Permit application fee: $4,100.
Herbicide Applications
(pp) (
WM04) Permits
for watershed management.
1. Category:
approval to apply herbicide(s) to waters of the Commonwealth pursuant to M.G.L.
c. 111, § 5E.
2. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 24 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 14 days of the Department's statement
identifying deficiencies, if any.
d. Within 24 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
3. Permit
application fee: $95.
Surface Water NPDES Permits
(qq) (
WM05) Permits
for watershed management.
1. Category: major
NPDES surface water discharge permit and renewal.
2. Description: permit to discharge pursuant
to
314 CMR
3.03:
Discharges Requiring a
Permit and defined by the USEPA as a major NPDES discharge pursuant to
40 CMR
122.2.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 30 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 200 days of making a determination
of administrative completeness or receipt of EPA's draft NPDES permit,
whichever is later, the Department shall complete a technical review.
c. The permit applicant may remedy identified
deficiencies within 200 days of the Department's statement identifying
deficiencies, if any.
d. Within 200
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
e.
Within 90 days of the close of the period for public comment, including any
public hearing, the Department shall complete a public comment
review.
4. Permit
application fee: $6,785.
(rr) (
WM06) Permits
for watershed management.
1. Category: minor
surface water discharge permit and renewal.
2. Description: permit to discharge pursuant
to
314 CMR
3.03:
Discharges Requiring a
Permit and not otherwise defined as a major NPDES discharger by the
USEPA pursuant to
40
CFR
122.2.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 30 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 150 days of making a determination
of administrative completeness or receipt of EPA's draft NPDES permit,
whichever is later, the Department shall complete a technical review.
c. The permit applicant may remedy identified
deficiencies within 180 days of the Department's statement identifying
deficiencies, if any.
d. Within 150
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
e.
Within 90 days of the close of the period for public comment, including any
public hearing, the Department shall complete a public comment
review.
4. Permit
application fee: $3,170.
(ss) (
WM07) Permits
for watershed management.
1. Category: permit
modification or renewal.
2.
Description: renewals or modifications of permits for existing permitted
facilities as defined in WM05, WM06, IW16, and IW18.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 30 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 90 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 90 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 60 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee:
$985.
(uu)
(
WM09) Permits for watershed management.
1. Category: approval of stormwater
management plan.
2. Description:
review and approval of a stormwater management plan for discharges to
Outstanding Resource Waters and coastal Areas of Critical Environmental Concern
and other stormwater discharges pursuant to
314 CMR
3.06:
General Permits as required by the Department, and that file
and qualify for inclusion in EPA's NPDES general permit for
stormwater.
3. Schedule for timely
action: for projects for which applications are filed and fees received on or
after March 24, 2017,
a. Within 24 days of
receipt of an application and payment of the appropriate fee, the Department
shall complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completion, the Department shall complete a technical
review.
c. The permit applicant may
remedy any identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical review and
approve or disapprove the plan.
4. Permit application fee: $890.
(uu)
(1) (
WM15) Permits
for watershed management.
1. Category:
general permit coverage for surface water discharge.
2. Description: Notice of Intent for coverage
under a general permit for discharges pursuant to
314 CMR
3.06:
General Permits and that file and qualify for inclusion in
EPA's NPDES general permits.
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after March 24, 2017,
a.
Within ten days of receipt of an application and payment of the permit
application fee, the department shall complete an administrative completeness
review.
b. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
c. Within ten days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a second administrative
completeness review.
d. Within 21
days of making a determination of administrative completeness the Department
shall complete a technical review.
e. The permit applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
f. Within 21
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
4. Permit application fee:
$500.
(uu)
(2)
(WM16) Permits
for watershed management.
1. Category:
treatment works plan approval.
2.
Description: plan approval for a new facility or plan approval for a
modification to an existing facility holding permit IW16, IW18, WM05, or
WM06.
3. Schedule for timely
action: for projects for which applications are filed and fees received on or
after March 24, 2017,
a. Within 24 days of
receipt of an application and payment of the permit application fee, the
department shall complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $980.
(7)
Water Pollution
Control.
Title 5
(a)
(1)
(
WP57) Permits for Water Pollution Control: Title 5.
1. Category: approval for installation of a
recirculating sand filter or approved equivalent alternative technology
pursuant to
310 CMR
15.202:
Use of Recirculating Sand
Filters.
2. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 45 days
of receipt of an application and payment of the permit application fee, the
Department shall complete a technical review.
b. The permit applicant may remedy identified
deficiencies within 30 days of the Department's statement identifying
deficiencies, if any.
c. Within 45
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
3. Permit application fee: $525.
(a)
(2) (
WP58) Permits
for Water Pollution Control: Title 5.
1.
Category: approval of plans to aggregate nitrogen loading or approval for
installation of a shared system.
2.
Description:
a. Approval of nitrogen
aggregation plans pursuant to
310 CMR
15.216:
Aggregate Determinations of
Flows and Nitrogen Loadings, or
b. Approval for the installation of a shared
system pursuant to
310 CMR
15.290:
Shared Systems.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Nitrogen aggregation.
i. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
ii. Within 60 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
iii. The permit applicant
may remedy any identified deficiencies within 60 days of the Department's
statement identifying deficiencies, if any.
iv. Within 60 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
b. Shared System.
i. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
ii. Within 30 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
iii. The permit applicant
may remedy any identified deficiencies within 60 days of the Department's
statement identifying deficiencies, if any.
iv. Within 30 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4.
Permit application fee: $1,940.
(a)
(3)
(
WP59) Permits for Water Pollution Control: Title 5
1. Category: approval of variance.
2. Description: approval of the following
variances,
a. (Reserved)
b. Approval of variances pursuant to
310 CMR
15.410:
Variances - Standard of
Review, granted by Board of Health, except variance for increased flow
to existing system, or c. Approval of variance granted by Board of Health for
increased flow pursuant to
310 CMR
15.414:
Variances for Increased Flow
to Existing System or DEP issuance of variance for increased flow
pursuant to
310 CMR
15.414:
Variances for Increased Flow
to Existing System.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 30 days of receipt of an
application and payment of the permit application fee, the Department shall
complete a technical review.
b. The
permit applicant may remedy any identified deficiencies within 60 days of the
Department's statement identifying deficiencies, if any.
c. Within 30 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $335.
(a)
(4)
(
WP60) Permits for Water Pollution Control: Title 5.
1. Category: variance from Title 5 provisions
for schools.
2. Description:
approval of a variance from Title 5 provisions for schools pursuant to
310 CMR
15.416:
Variances for
Schools.
3. Schedule for
timely action: or projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 30 days
of receipt of an application and payment of the permit application fee, the
Department shall complete a technical review.
b. The permit applicant may remedy identified
deficiencies within 90 days of the Department's statement identifying
deficiencies, if any.
c. Within 30
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
4. Permit application fee:
$1,940.
(a)
(5)
(WP61) Permits
for Water Pollution Control: Title 5.
1.
Category: approval or certification of alternative systems.
2. Description:
a. Approval of alternative systems for
remedial use pursuant to
310 CMR
15.284:
Approval for Remedial
Use, or
b. Approval of
alternative systems for pilot use, provisional use, or certification for
general use pursuant to
310 CMR
15.281:
Purpose through 15.288:
Certification of Alternative
Systems for General Use.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the department shall
complete an administrative review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $3,675.
(a)
(6)
(WP62) Permits for Water Pollution Control: Title 5.
1. Category: determination of acceptability
for the use of septic system additives, soil absorption conditioners, approval
of effluent tee filters, and approval of alternative devices for grease
removal.
2. Description:
a. Determination of acceptability for the use
of septic system additives pursuant to
310 CMR
15.027:
Prohibition of Septic System
Additives, or
b. Soil
absorption conditioners pursuant to
310 CMR
15.027:
Prohibition of Septic System
Additives, or
c. Effluent
tee filters pursuant to
310 CMR
15.281:
Purpose through 15.288:
Certification of Alternative
Systems for General Use, or
d. Alternative devices for grease removal
pursuant to
310 CMR
15.230(12).
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the department shall
complete an administrative review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,140.
(a)
(7)
(
WP63) Permits for Water Pollution Control: Title 5.
1. Category: disposal system construction
permit for state or federal facilities.
2. Description: disposal system construction
permit for new systems, upgrade of small systems, upgrade of large systems
which do not trigger failure criteria at
310
CMR
15.303:
Systems Failing to
Protect Public Health and Safety and the Environment, and/or expansion
at state or federal facilities, with or without variances which accompany the
permit pursuant to
310 CMR 15.000:
The
State Environmental Code, Title 5: Standard Requirements for the Siting,
Construction, Inspection, Upgrade and Expansion of On-site Sewage Treatment and
Disposal Systems and for the Transport and Disposal of
Septage.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,140.
(a)
(8)
(
WP64) Permits for Water Pollution Control: Title 5.
1. Category: approval of site use of
alternative technology not included in other categories, and approval of tight
tanks.
2. Description:
a. Approval of a tight tank pursuant to
310 CMR
15.260:
Tight Tanks, or
b.
Approval of installation of an alternative system for pilot use pursuant to
310 CMR
15.281:
Purpose and 15.285:
Approval for Piloting,
excluding approved grease devices or systems approved pursuant to WP61 for
piloting, provisional or general use, and excluding permits under WP57,
or
c. Approval of installation of
alternative system pursuant to
310 CMR
15.284:
Approval for Remedial
Use for remedial use.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Tight Tanks.
i. Within 30 days of receipt of an
application and payment of the permit application fee, the permit is
presumptively approved unless the Department approves the permit with
conditions, denies the permit, or issues a statement of technical
deficiencies.
ii. The permit
applicant may remedy identified deficiencies within 30 days of the Department's
statement identifying deficiencies, if any.
iii. Within 30 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
b. Installation
of alternative system for pilot use or remedial use i. Within 24 days of
receipt of an application and payment of the permit application fee, the
Department shall complete an administrative review.
ii. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
iii. The permit applicant
may remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
iv. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4.
Permit application fee: $525.
(a)
(10)
(
WP66) Permits for Water Pollution Control: Title 5.
1. Category: upgrade, expansion or continued
use of large systems or review determined necessary pursuant to
310 CMR
15.003(2)(b).
2. Description:
a. approval for upgrade, expansion or
continued use of large systems pursuant to
310 CMR
15.003(2)(b), excluding
permits W61 or WP63.
b. approval of
system required by the Department pursuant to
310 CMR
15.003(2)(b).
3. Schedule for timely action: for
projects for which applications are filed and fees received on or after March
24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,140.
(a)
(12)
(
WP70) Permits for Water Pollution Control: Title 5.
1. Category: request for alternative design
flow pursuant to
310 CMR
15.203(6) or approval to
discharge non-sanitary wastewater to a septic system pursuant to
310 CMR
15.004(4).
2. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 48 days of receipt of an
application and payment of the permit application fee, the Department shall
complete a technical review.
b. The
permit applicant may remedy identified deficiencies within 90 days of the
Department's statement identifying deficiencies, if any.
c. Within 24 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
3. Permit
application fee: $700.
(a)
(13)
(
WP75) Permits for Water Pollution Control: Title 5.
1. Category: modification or renewal of
alternative systems.
2.
Description:
a. Modification or renewal of
alternative systems for remedial use pursuant to
310 CMR
15.284: Approval for Remedial
Use, or
b.
Modification or renewal of alternative systems for pilot use, provisional use,
or certification for general use, pursuant to
310 CMR
15.281:
Purpose through 15.288:
Certification of Alternative
Systems for General Use.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the department shall
complete an administrative review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $ 2,160.
Sanitary Groundwater Discharges
(l)
(
WP11) Permits for water pollution control:
groundwater discharges.
1. Category: permit
modification or renewal, with plan approval.
2. Description: permit renewal or major
modification with plan approval pursuant to
314
CMR
5.12:
Modification, Suspension,
Revocation, Renewal, and Transfer of Permits and reclaimed water
pursuant to
314 CMR 20.00:
Reclaimed Water Permit Program and Standards for WP05, WP06,
WP08, WP10, WP79, WP84, and WP85 permits.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 36 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 30 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 60 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee: $1,830.
(m) (
WP12)
Permits for water pollution control: groundwater discharges.
1. Category: permit modification or renewal
without plan approval.
2.
Description: permit renewal or major modification without plan approval
pursuant to
314
CMR
5.12:
Modification, Suspension,
Revocation, Renewal, and Transfer of Permits and reclaimed water
pursuant to
314 CMR 20.00:
Reclaimed Water Permit Program and Standards for WP05, WP06,
WP08, WP10, WP79, WP84, WP85 permits.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 36 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 30 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 60 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee: $890.
(m)
(1) (
WP79) Permits
for water pollution control: groundwater discharges.
1. Category: individual sewage treatment
permit.
2. Description: individual
sewage treatment permit not included under WP81 pursuant to
314 CMR
5.03:
Discharges Requiring a
Permit.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 36 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 30 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 60 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee: $5,000.
(m)
(2) (
WP80) Permits
for water pollution control: groundwater discharges.
1. Category: general permit or general permit
renewal for specified discharges.
2. Description: general permit or general
permit renewal for discharge of reject water from reverse osmosis facility,
boiler blowdown, carwash, laundromat, wastewater from water purification plant
and or water treatment lagoon, and point source agricultural discharge pursuant
to
314 CMR
5.03:
Discharges Requiring a
Permit, and
310 CMR
5.13(1):
Authority
to Issue General Permits.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 30 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness and technical review.
b. The permit applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 21
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
d.
Within 15 days of the close of public comment period or public hearing, if any,
the Department shall complete a final decision.
4. Permit application fee: $745.
(m)
(3) (
WP81) Permits
for water pollution control: groundwater discharges.
1. Category: small sewage treatment works
general permit to discharge or general permit renewal.
2. Description: small sewage treatment work
designed to receive 50,000 gpd or less general permit to discharge or renewal
of general permit pursuant to
314 CMR
5.03:
Discharges Requiring a
Permit, and
310 CMR
5.13(1):
Authority
to Issue General Permits.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 30 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness and technical review.
b. The permit applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 21
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
d.
Within 15 days of the close of public comment period or public hearing, if any,
the Department shall complete a final decision.
4. Permit application fee: $755.
(m)
(4) (
WP82) Permits
for water pollution control: groundwater discharges.
1. Category: administrative renewal of
groundwater discharge permit.
2.
Description: administrative renewal of groundwater discharge permit pursuant to
314
CMR
5.12(9):
Administrative Renewal of Permits.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after May 1, 2020,
a. Within 45 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness and technical review.
b. The permit applicant may remedy identified
deficiencies within 30 days of the Department's statement identifying
deficiencies, if any.
c. Within 15
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
4. Permit application fee: $265.
(m)
(5) (
WP83) Permits
for water pollution control: groundwater discharges.
1. Category: hydrogeologic report.
2. Description: hydrogeologic report approval
and authorization pursuant to 314 CMR
5. 09:
Duty to Submit
Hydrogeological Evaluation.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 45 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness and technical review.
b. The permit applicant may remedy identified
deficiencies within 90 days of the Department's statement identifying
deficiencies, if any.
c. Within 30
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
4. Permit application fee: $10,005.
(m)
(6) (
WP84) Permits
for water pollution control: groundwater discharges.
1. Category: reclaimed water
system.
2. Description: reclaimed
water system construction, modification, and operation pursuant to
314 CMR
20.03:
Permit Requirements for
Reclaimed Water Systems.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 36 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 30 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 60 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee: $5,000.
(m)
(7) (
WP85) Permits
for water pollution control: groundwater discharges.
1. Category: other groundwater discharge
individual permits.
2. Description:
permit for project requiring an individual discharge permit not specifically
included in category WP79 or WP80.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 36 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 30 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 60 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee: $2,470.
Industrial Groundwater
Discharges
(m)
(8) (
WP86) Permits
for Industrial Wastewater: groundwater discharge.
1. Category: permit and plan approval for
Type II industrial wastewater treatment facility (formerly IW03).
2. Description: permit to discharge pursuant
to
314 CMR
5.03:
Discharges Requiring a
Permit and authorization to construct and operate a Type II industrial
wastewater treatment facility, as defined in
257 CMR
2.15:
Permit for
Discharge.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 120 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 120 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 72 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee: $6,190.
(m)
(9) (
WP87) Permits
for Industrial Wastewater: groundwater discharge.
1. Category: permit and plan approval for
Type I industrial wastewater treatment facility, (formerly IW05).
2. Description: permit to discharge pursuant
to
314 CMR
5.03:
Discharges Requiring a
Permit and authorization to construct and operate a Type I industrial
wastewater treatment facility, as defined in
257 CMR
2.15:
Permit for
Discharge.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 96 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 96 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 72 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee: $3,185.
(m)
(10) (
WP88) Permits
for Industrial Wastewater: groundwater discharge.
1. Category: permit renewal or modification,
with plan modification of industrial wastewater treatment facility; (formerly
IW30).
2. Description: permit
renewal or modification, with plan modification, for facility holding permit
IW03, IWP05, WP86, or WP87.
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after March 24, 2017,
a.
Within 24 days of receipt of an application and payment of the permit
application fee, the department shall complete an administrative completeness
review.
b. Within 88 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 180 days of the
Department's statement identifying deficiencies, if any.
d. Within 88 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 72 days of the
close of the period for public comment including any period for public hearing,
the Department shall complete a public comment review.
4. Permit application fee: $1,445.
(m)
(11) (
WP89) Permits
for Industrial Wastewater: groundwater discharge.
1. Category: permit renewal or modification,
without plan modification of industrial wastewater treatment facility (formerly
IW31).
2. Description: permit
renewal or modification, without plan modification, for facility holding permit
IW03, IW05, WP86, or WP87.
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after March 24, 2017,
a.
Within 24 days of receipt of an application and payment of the permit
application fee, the department shall complete an administrative completeness
review.
b. Within 72 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 90 days of the Department's
statement identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 72 days of the
close of the period for public comment, including any period for public
hearing, the Department shall complete a public comment review.
4. Permit application fee: $645.
(m)
(12) (
WP90) Permits
for Industrial Wastewater: groundwater discharge.
1. Category: plan approval modification for
industrial wastewater treatment system (formerly IW32).
2. Description: plan approval modification
for facility holding permit IW03, IW05, WP86, or WP87.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the department shall
complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $940.
Treatment Works Plan Approval
(n)
(
WP68) Permits for Water Pollution Control: treatment
works plan approval.
1. Category: treatment
works plan approval.
2.
Description: plan approval for a new facility or plan approval for
modifications to existing facilities with permitted discharges to the ground or
surface water pursuant to
310 CMR
5.00:
Ground Water Discharge Permit
Program.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
3. Permit
application fee: $970.
Holding Tanks
(o) (WP56) Permits for Holding Tanks.
1. Category: certification of industrial
wastewater holding tank pursuant to M.G.L. c. 21, § 27, and
314 CMR
18.10:
Certification.
2.
Description: certification covers new industrial wastewater holding tank
installation and conversion of existing tanks into industrial wastewater
holding tanks.
3. Schedule for
timely action: for projects for which application is filed and fees received on
or after May 1, 2020,
a. Within 30 days of
receipt of an application and payment of the application fee, the Department
shall complete an administrative review.
b. Within 30 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 90 days of the Department's statement
identifying deficiencies, if any,
d. Within 30 days of receipt of materials in
response to the Department's statement identifying deficiencies, the Department
shall complete a supplemental technical review. In the absence of a written
decision, the certification shall be presumptively approved.
4. Permit application fee: $140.
Sewer Connections/Extensions
(y) (WP91) Permits for
water pollution control: sewer connections/extensions.
1. Category: sewer connection/
extension.
2. Description: sewer
connection permit as determined by the Department permit pursuant to
314 CMR
7.03(3).
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 90 days of receipt of an
application and payment of the permit application fee, the Department shall
complete a technical review.
b. The
permit applicant may remedy identified deficiencies within 180 days of the
Department's statement identifying deficiencies, if any.
c. Within 45 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
d. Within 20 days of the
close of the period for public comment, including a public hearing, if any, the
Department shall complete a public comment review.
4. Permit application fee:
$3,000.
(z) (WP92)
Permits for industrial sewer connections.
1.
Category: sewer connection.
2.
Description: permit pursuant to
314 CMR
7.03(2).
3. Schedule for timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017,
a. Within 45 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness and technical review.
b. The permit applicant may remedy identified
deficiencies within 90 days of the Department's statement identifying
deficiencies, if any.
c. Within 45
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
d.
Within 20 days of the close of the period for public comment, including a
public hearing, if any, the Department shall complete a public comment
review.
4. Permit
application fee: $1,795.
Residuals Management
(aa)
(
WP28) Permits for water pollution control: residuals
management.
1. Category: approval of sampling
and analysis plan for land application of residuals, as required prior to
classification and permit for land application.
2. Description: approval of sampling and
analysis plan pursuant to
310 CMR 32.00:
Land
Application of Sludge and Septage for beneficial use of sludge, sludge
products or septage.
3. Schedule
for timely action: for projects for which applications are filed and fees
received on or after March 24, 2017,
a. Within
24 days of receipt of an application and payment of the permit application fee,
the Department shall complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $860.
(bb) (
WP29) Permits
for water pollution control: residuals management.
1. Category: determination of suitability for
land application of residuals.
2.
Description: classification of sludge, sludge products, or septage prior to
land application for beneficial use, pursuant to
310 CMR 32.00:
Land
Application of Sludge and Septage.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 72 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee: $3,500.
(cc)
(
WP30) Permits for water pollution control: residuals
management.
1. Category: certification
pursuant to
310 CMR 32.00:
Land
Application of Sludge and Septage of major projects for land
application of sludge, sludge products, or septage.
2. Description: land application
certification for Type 2 or Type 3 classified residuals, for projects of 0.5
acres or more.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 72 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee: $2,910.
(dd)
(
WP31) Permits for water pollution control: residuals
management.
1. Category: certification
pursuant to
310 CMR 32.00:
Land
Application of Sludge and Septage of minor projects for land
application of sludge, sludge products, or septage.
2. Description: land application
certification for Type 2 or Type 3 classified residuals, for projects of less
than 0.5 acre.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 72 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee: $755.
(ee)
(
WP32) Permits for water pollution control: residuals
management.
1. Category: renewal or
modification of certification pursuant to
310 CMR 32.00:
Land
Application of Sludge and Septage of projects for land application of
sludge, sludge products, or septage.
2. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
d. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 48 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
4. Permit application fee: $315.
(ff)
(
WP33) Permits for water pollution control: residuals
management.
1. Category: approval of
wastewater treatment residuals landfill, pursuant to M.G.L. c. 21, § 27 or
§ 43(2), M.G.L. c. 83, §§ 6 and 7, or M.G.L. c. 21A, § 13,
314 CMR 5.00:
Ground
Water Discharge Permit Program or 3.00:
Surface Water
Discharge Permit Program, or 7.00:
Sewer System Extension and
Connection Permit Program.
2. Schedule of timely action: for
applications received on or after March 24, 2017, individual rule project
subject to
310 CMR
4.05.
3. Permit application fee: for projects for
which applications are filed and fees received on or after March 24, 2017,
individual rule project subject to
310 CMR
4.05.
(gg) (
WP34) Permits
for water pollution control: residuals management.
1. Category: approval of closure of
wastewater treatment residuals landfill, pursuant to M.G.L. c. 21, §§
27 and 43(2), M.G.L. c. 83, §§ 6 and 7, M.G.L. c. 21A, § 13 or
314 CMR 3.00:
Surface
Water Discharge Permit Program, 5.00:
Ground Water Discharge
Permit Program, or 7.00:
Sewer System Extension and Connection
Permit Program.
2.
Schedule for timely action: for projects for which applications are filed and
fees received on or after March 24, 2017,
a.
Within 24 days of receipt of an application and payment of the permit
application fee, the Department shall complete an administrative completeness
review.
b. Within 72 days of making
a determination of administrative completeness, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 180 days of the
Department's statement identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
3. Permit
application fee: $8,745.
(hh) (
WP35) Permits
for water pollution control: residuals management.
1. Category: approval of design plans and
specifications for residuals management facilities, pursuant to M.G.L. c. 21,
§ 27 or § 43(2), M.G.L. c. 83, §§ 6 and 7, or M.G.L. c.
21A, § 13 or
314 CMR 12.00:
Operation and Maintenance and Pretreatment Standards for Wastewater
Treatment Works and Indirect Dischargers.
2. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 120 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 120 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
e. Within 72 days of the
close of the period for public comment, including any public hearing, the
Department shall complete a public comment review.
3. Permit application fee: $5,350.
(ii)
(
WP44) Permits for water pollution control: residuals
management.
1. Category: modifications to
permits for residuals landfills.
2.
Description: modifications to existing approvals including but not limited to
changes in design, operation, and monitoring plans.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
3. Permit
application fee: $2,180.
(jj) (
WP45) Permits
for water pollution control: residuals management.
1. Category: modifications to residuals
management facilities.
2.
Description: modifications to existing plan approvals for all residual
management facilities excluding residual landfills, but including and not
limited to revisions to design, operation, monitoring, and material processing
operations.
2. Schedule for timely
action: for projects for which applications are filed and fees received on or
after March 24, 2017,
a. Within 24 days of
receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
c. The permit applicant may
remedy identified deficiencies within 180 days of the Department's statement
identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
3. Permit
application fee: $1,280.
(kk) (
WP93) Permits
for water pollution control: residuals management.
1. Category: renewal for land application of
Type I residuals.
2. Description:
renewal of Type I approval pursuant to
310 CMR
32.13(11).
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
(
see
310 CMR
32.13(11)) for the terms of
presumptive approval),
a. Within 45 days of
receipt of an application and payment of the permit application fee, the
Department shall complete a technical review.
b. The permit applicant may remedy any
identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
c. Within 45 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $1,700.
Wastewater Treatment Plant
Operators
(pp) (
WP47) Permits
for water pollution control: licenses for wastewater treatment plant operators.
1. Category: certification through
reciprocity.
2. Description:
certifications for the seven grades of wastewater treatment plant operators
pursuant to
257 CMR 2.00:
Certification of Operators of Wastewater Treatment Facilities
by reciprocity review and status.
3. Schedule for timely action: for
certifications for which applications are filed and fees received on or after
March 24, 2017,
a. Within 24 days of receipt
of an application and payment of the application fee, the Board shall complete
an administrative review.
b. Within
24 days of making a determination of administrative completeness, the Board
shall complete a technical review.
c. The applicant may remedy identified
deficiencies within 30 days of the Board statement of deficiencies.
d. Within 24 days of receipt of materials
from the applicant in response to a statement identifying deficiencies, the
Board shall complete a supplemental technical review.
4. Permit application fee: $95.
(qq)
(
WP48) Permits for water pollution control: licenses
for wastewater treatment plant operators.
1.
Category: emergency and provisional certifications.
2. Description: approval of emergency and
provisional certifications for the seven grades of wastewater treatment plant
operators pursuant to
257 CMR 2.00:
Certification of Operators of Wastewater Treatment
Facilities.
3. Schedule
for timely action: for certifications for which applications are filed and fees
received on or after March 24, 2017,
a. Within
24 days of receipt of an application and payment of the application fee, the
Board shall complete an administrative review.
b. Within 24 days of making a determination
of administrative completeness, the Board shall complete a technical
review.
c. The applicant may remedy
identified deficiencies within 30 days of the Board statement of
deficiencies.
d. Within 24 days of
receipt of materials from the applicant in response to a statement identifying
deficiencies, the Board shall complete a final technical
review.
4. Permit
application fee: $35.
(8)
Wetlands and
Waterways
Waterways Permits
(a) (
WW01) Permits
for waterways.
1. Category: waterways license
or permit: water-dependent use projects.
2. Description: license or permit pursuant to
310 CMR
9.04:
Geographic Areas Subject to
Jurisdiction,
314 CMR
9.05:
Activities Subject to
Jurisdiction, and 9.11(2)(a).
3. Schedule for timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017,
a. Within 30 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative review.
b. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 30
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental administrative review.
d. Within 60 days of the close of the public
comment period and notification by the applicant that the public notice has
been published, the Department shall complete a technical review by issuing a
statement of deficiencies or a written document ending this review timeline
pursuant to
310 CMR 4.00.
e. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
f. Within 60
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review and issue a written document ending this review
timeline pursuant to
310 CMR
4.00.
4. Permit application fee:
a. Residential water-dependent use projects
for four dwelling units or less: $215.
b. Other water-dependent use projects:
$330.
c. Licenses with extended
terms, or facilities described in 310 CMR
9. 00:
Waterways:
$3,350.
(a)
(1) (
WW14) Permits
for waterways.
1. Category: waterways license
or permit for nonwater-dependent projects with partial initial
application.
2. Description:
license or permit pursuant to
310 CMR
9.04:
Geographic Areas Subject to
Jurisdiction and 9.05:
Activities Subject to
Jurisdiction, when an applicant initially submits a partial
application and completes the application after the public hearing.
3. Schedule for timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017,
a. Within 45 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative review.
b. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 45
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental administrative review.
d. Within 90 days of the close of the public
comment period and notification by the applicant that the public notice has
been published, the Department shall complete a technical review by issuing a
statement of deficiencies or a written determination ending this timeline
pursuant to
310 CMR 4.00.
e. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
f. Within 60
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review by issuing a written determination ending this
timeline pursuant to
310 CMR
4.00.
4. Permit application fee:
a. Residential nonwater-dependent use
projects for four dwelling units or less: $665.
b. Other nonwater-dependent use projects:
$2,005.
c. Licenses with extended
terms, or facilities described in
310 CMR
9.16(3)(b)2.: $3,350.
(a)
(2) (
WW15) Permits
for waterways
1. Category: non-water
Dependent project with initial full application.
2. Description: license or permit pursuant to
310 CMR
9.04:
Geographic Areas Subject to
Jurisdiction and 9.05:
Activities Subject to
Jurisdiction, when an applicant initially submits a partial
application and completes the application after the public hearing.
3. Schedule for timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017,
a. Within 45 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative review.
b. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 45
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental administrative review.
d. Within 60 days of the close of the public
comment period and notification by the applicant that the public notice has
been published, the Department shall complete a technical review by issuing a
statement of deficiencies or a written determination ending this timeline
pursuant to
310 CMR 4.00.
e. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
f. Within 60
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review by issuing a written determination ending this
timeline pursuant to
310 CMR
4.00.
4. Permit application fee:
a. Residential nonwater-dependent use
projects for four dwelling units or less: $665
b. Other nonwater-dependent use projects:
$2,005.
c. Licenses with extended
terms, or facilities described in
310 CMR
9.16(3)(b)2.:
$3,350.
(a)
(3)
(
WW16) Permits for waterways
1. Category: waterways license or permit for
nonwater-dependent projects within a Municipal Harbor Plan.
2. Description: license or permit pursuant to
310 CMR
9.04:
Geographic Areas Subject to
Jurisdiction and 9.05:
Activities Subject to
Jurisdiction, within an area subject to a Municipal Harbor Plan
approved under
301 CMR 23.00:
Review
and Approval of Municipal Harbor Plans.
3. Schedule for timely action: for projects
for which applications are filed and/or fees received on or after, March 24,
2017,
a. Within 45 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative review.
b. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 45
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental administrative review.
d. Within 75 days of the close of the public
comment period and notification by the applicant that the public notice has
been published, the Department shall complete a technical review by issuing a
statement of deficiencies or a written determination ending this timeline
pursuant to
310 CMR 4.00.
e. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
f. Within 45
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review and issue final written determination ending this
timeline pursuant to
310 CMR
4.00.
4. Permit application fee:
a. Residential nonwater-dependent use
projects (for four dwelling units or less): $665.
b. Other nonwater-dependent use projects:
$2,005.
c. Licenses with extended
terms, or facilities described in
310 CMR
9.16(3)(b)2.:
$3,350.
(a)
(4)
(
WW17) Permits for waterways.
1. Category: waterways license or permit for
nonwater-dependent projects with Joint MEPA Application.
2. Description: license or permit when
applicants file a Final Environmental Impact Report under
301 CMR
11.07(4)
that serves as an application meeting the
requirements of
310 CMR
9.11(3)(a)
through (c):
Appraisal
Procedure.
3. Schedule for
timely action: for projects for which applications are filed and/or fees
received on or after, March 24, 2017,
a.
Within 90 days of receipt of an application and payment of the permit
application fee, the Department shall complete an administrative
review.
b. The applicant may remedy
identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
c. Within 25 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental administrative
review.
d. Within 30 days of the
close of the public comment period and notification by the applicant that the
public notice has been published, the Department shall complete a technical
review by issuing a statement of deficiencies or a written determination ending
this timeline pursuant to
310 CMR 4.00.
e. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
f. Within 30
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review and issue a written determination ending this
timeline pursuant to
310 CMR
4.00.
4. Permit application fee:
a. Residential nonwater-dependent use
projects for four dwelling units or less: $665.
b. Other nonwater-dependent use projects:
$2,005.
c. Licenses with extended
terms, or facilities described in
310 CMR
9.16(3)(b)2.:
$3,350.
(c) (
WW03) Permits
for waterways.
1. Category: amendment of
waterways license or permit.
2.
Description: amendment of license or permit pursuant to
310 CMR
9.04:
Geographic Areas Subject to
Jurisdiction and 9.05:
Activities Subject to
Jurisdiction.
3. Schedule
for timely action: for projects for which applications are filed and/or fees
received on or after March 24, 2017,
a. Within
30 days of receipt of an application and payment of the permit application fee,
the Department shall complete an administrative review.
b. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 30
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental administrative review.
d. Within 60 days of the close of the public
comment period and notification by the applicant that the public notice has
been published, the Department shall complete a technical review by issuing a
statement of deficiencies or a written document ending this timeline pursuant
to
310 CMR 4.00.
e. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
f. Within 60
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review by issuing a written document ending this
timeline pursuant to
310 CMR
4.00.
4. Permit application fee:
a. Residential water-dependent use projects
for four dwelling units or less: $100.
b. Other water-dependent use projects:
$125.
c. Residential
nonwater-dependent use projects for four dwelling units or less:
$530.
d. Other nonwater-dependent
use projects: $1,000.
e. Licenses
with extended terms, or facilities described in
310 CMR
9.16(3)(b)2.:
$1,335.
(d)
(
WW04) Permits for waterways.
1. Category: determinations of applicability
pursuant to
310 CMR
9.06:
Requests for Determination of
Applicability.
2. Schedule
for timely action: for projects for which applications are filed and/or fees
received on or after March 24, 2017,
a. Within
24 days of receipt of an application and payment of the permit application fee,
the Department shall complete an administrative completeness review in
accordance with the standards of
310 CMR
9.06(1) and (2).
b Within 48 days of making a determination of
administrative completeness, or of the close of any public comment period
pursuant to
310 CMR
9.06(3), the Department
shall complete a technical review.
c. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
d. Within 48
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
3. Permit application fee:
$100.
(e)
(
WW05) Permits for waterways.
1. Category: certificates of compliance
pursuant to
310 CMR
9.19:
Certificate of
Compliance.
2. Schedule
for timely action: for projects for which applications are filed and/or fees
received on or after March 24, 2017,
a. Within
24 days of receipt of an application and payment of the permit application fee,
the Department shall complete an administrative completeness review in
accordance with the standards of
310 CMR
9.16:
Fees and 9.19:
Certificate of
Compliance.
b. Within 292
days of making a determination of administrative completeness, the Department
shall complete its technical review.
c. If the Department has required changes as
necessary to bring the project into compliance, the Department will complete
technical review within 146 days of receipt of materials from the applicant in
response to the Department's statement identifying
deficiencies.
3. Permit
application fee:
a. Water-dependent use
projects, except facilities described in
310 CMR
9.16(3)(b)2.:
$100.
b. Nonwater-dependent use
projects: $215.
c. Licenses with
extended terms, or facilities described in
310 CMR
9.16(3)(b)2.:
$430.
(f)
(WW06) Permits for waterways.
1. Category: waterways license, small
structures accessory to residences.
2. Description: license for small dock/pier
projects meeting the requirements of
310
CMR
9.10(1):
Projects Eligible for Simplified Procedures.
3. Schedule for timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 24
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental administrative review.
d. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review by issuing a statement of deficiencies or a written document ending this
timeline pursuant to
310 CMR 4.00.
e. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
f. Within 72
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review and issue a written document ending this timeline
pursuant to
310 CMR
4.00.
4. Permit application fee: $75.
(f)
(1) (
WW12) Permits
for waterways.
1. Category: Waterways License
renewal, small structures accessory to residences.
2. Description: license renewal for small
dock/pier projects meeting the requirements of
310
CMR
9.10(6):
Renewal
and Transfer of Licenses from the Department.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 24
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental administrative review.
d. Within 48 days of notification by the
applicant that the public notice has been published or the close of the public
comment period, whichever is later, the Department shall complete a technical
review.
e. The applicant may remedy
identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
f. Within 48 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $35.
(f)
(2)
(WW24) Permits for waterways.
1. Category:
waterways general license, small structures accessory to residences.
2. Description: certification under the
general license for small dock/pier projects meeting the requirements of
310 CMR
9.29(2):
Projects
Eligible for General License Certification.
3. Schedule for timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017,
a. Within 60 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 45
days of making a determination of administrative completeness, the Department
shall complete a technical review.
4. Permit application fee: $75.
(f)
(3) (
WW25) permits
for waterways.
1. Category: permits for test
projects.
2. Description: Permits
for
in situ testing of water-dependant pilot technologies
pursuant to
310 CMR
9.30:
Permitting of Test
Projects.
3. Schedule for
timely action: for projects for which applications are filed and/or fees
received on or after March 24, 2017,
a. Within
24 days of receipt of an application and payment of the permit application fee,
the Department shall complete an administrative completeness review.
b. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 24
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental administrative review.
d. Within 30 days of making a determination
of administrative completeness, the Department shall complete a technical
review.
e. The applicant may remedy
identified deficiencies within 60 days of the Department's statement
identifying deficiencies, if any.
f. Within 30 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies, the Department shall complete a supplemental technical
review.
4. Permit
application fee: $440.
Water Quality Certifications
(g)
(WW07) Permits
for wetlands and waterways.
1. Category:
water quality certifications for major dredging projects.
2. Description: Water Quality Certification
pursuant to
314 CMR 9.00:
401
Water Quality Certification for Discharge of Dredged or Fill Material,
Dredging, and Dredged Material Disposal in Waters of the United States Within
the Commonwealth for major dredging and dredge material disposal
projects, limited to projects involving dredging of 5,000 cubic yards (c.y.) or
greater.
3. Schedule for timely
action: for projects for which applications are filed and fees received on or
after March 24, 2017,
a. Within 24 days of
receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 96 days of making a determination
of administrative completeness, the Department shall complete a technical
review, including public comment review, if any.
c. The permit applicant may remedy identified
deficiencies within 180 days of the Department's statement identifying
deficiencies, if any.
d. Within 96
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review, including public comment review.
4. Permit application fee:
$490.
(h)
(WW08) Permits for wetlands and waterways.
1. Category: water quality certifications for
minor dredging projects.
2.
Description: Water Quality Certification pursuant to
314 CMR 9.00:
401
Water Quality Certification for Discharge of Dredged or Fill Material,
Dredging, and Dredged Material Disposal in Waters of the United States Within
the Commonwealth for minor dredging and dredge material disposal
projects, limited to projects involving dredging less than 5,000 c.y. but more
than 100 c.y.
3. Schedule for
timely action: for projects for which applications are filed and fees received
on or after March 24, 2017,
a. Within 24 days
of receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review, including public comment review, if any.
c. The permit applicant may remedy identified
deficiencies within 180 days of the Department's statement identifying
deficiencies, if any.
d. Within 72
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review, including public comment review.
4. Permit application fee:
$95.
(i)
(WW09) Permits for wetlands and waterways.
1. Category: amendment of water quality
certifications for dredging projects.
2. Description: amendment of Water Quality
Certification pursuant to
314 CMR 9.00:
401
Water Quality Certification for Discharge of Dredged or Fill Material,
Dredging, and Dredged Material Disposal in Waters of the United States Within
the Commonwealth for dredging and dredge material disposal
projects.
3. Schedule for timely
action: for projects for which applications are filed and fees received on or
after March 24, 2017,
a. Within 24 days of
receipt of an application and payment of the permit application fee, the
Department shall complete an administrative completeness review.
b. Within 48 days of making a determination
of administrative completeness, the Department shall complete a technical
review, including public comment review, if any.
c. The permit applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
d. Within 48
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review, including public comment review.
4. Permit application fee:
a. Increase in dredge volume by 50% or less
with no change in dredge footprint: $90.
b. Change in dredge or disposal construction
methods or plans: $190.
c. Change
in one or more certification conditions relating to dredging or disposal:
$280.
(j)
(WW10) Permits for wetlands & waterways.
1. Category: water quality certifications for
major projects.
2. Description:
Water Quality Certification pursuant to
314 CMR 9.00:
401
Water Quality Certification for Discharge of Dredged or Fill Material,
Dredging, and Dredged Material Disposal in Waters of the United States Within
the Commonwealth for major fill and excavation projects in waters and
wetlands, except for those exempted under the provisions of
314 CMR
9.03:
Activities Not Requiring an
Application. Major fill and excavation projects are limited to
projects:
a. with a cumulative loss of more
than 5,000 sq. ft. loss of bordering and isolated vegetated wetland and land
under water, except for routine maintenance projects meeting the criteria of
314 CMR
9.04(5):
Routine
Maintenance and agricultural limited projects meeting the criteria of
314 CMR
9.04(1):
More than
5000 sq. ft.; or
b. with a
loss of any amount of vegetated wetland or land under water involving:
i. Outstanding Resource Waters;
ii. rare species in Isolated Vegetated
Wetland;
iii. salt marsh;
iv. an individual 404 Permit;
v. activities where the Department invokes
discretionary authority pursuant to
314 CMR
9.04(11):
Discretionary Authority to require an application for an
individual Water Quality Certification.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 96 days of making a determination
of administrative completeness, the Department shall complete a technical
review, including public comment review, if any.
c. The permit applicant may remedy identified
deficiencies within 180 days of the Department's statement identifying
deficiencies, if any.
d. Within 96
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review, including public comment review.
4. Permit application fee:
$490.
(k)
(
WW11) Permits for wetlands & waterways.
1. Category: water quality certifications for
minor projects.
2. Description:
Water Quality Certification pursuant to
314 CMR 9.00:
401
Water Quality Certification for Discharge of Dredged or Fill Material,
Dredging, and Dredged Material Disposal in Waters of the United States Within
the Commonwealth for minor fill and excavation projects in waters and
wetlands, except for those exempted under the provisions of
314 CMR
9.03:
Activities Not Requiring an
Application. Minor fill and excavation projects are limited to
projects:
a. with a cumulative loss of less
than 5000 sq. ft. loss of bordering and isolated vegetated wetland and land
under water, involving:
i. real estate
subdivisions required to file applications for individual water quality
certifications under the provisions of
314 CMR
9.04(3):
Real Estate
Subdivision;
ii.
activities exempt under M.G.L. c. 131, § 40 under the provisions of
314 CMR
9.04(4):
Activities
Exempt under M.G.L. c. 131, § 40;
iii. any activity subject to the provisions
of
314 CMR
9.04(13);
b. with a cumulative loss of more than 5,000
sq. ft. of vegetated wetland or land under water involving routine maintenance
meeting the criteria of
314 CMR
9.04(5):
Routine
Maintenance; and
c. with
any cumulative loss of vegetated wetland or land under water involving an
agricultural limited projects meeting the criteria of
314 CMR
9.04(10):
Activities
Exempt under M.G.L. c. 131, § 40.
3. Schedule for timely action: for projects
for which applications are filed and fees received on or after March 24, 2017,
a. Within 24 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative completeness review.
b. Within 72 days of making a determination
of administrative completeness, the Department shall complete a technical
review, including public comment review, if any.
c. The permit applicant may remedy identified
deficiencies within 180 days of the Department's statement identifying
deficiencies, if any.
d. Within 72
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review, including public comment review.
4. Permit application fee: $95.
Combined Permits
(k)
(1)
(
WW26) Combined permits for waterways and water
quality certifications.
1. Category: combined
permits for waterways and water quality certifications.
2. Description: combined permit for water
quality certification and waterways license pursuant to
314 CMR 9.00:
401
Water Quality Certification for Discharge of Dredged or Fill Material,
Dredging, and Dredged Material Disposal in Waters of the United States Within
the Commonwealth and
310 CMR
9.00:
Waterways.
3. Schedule for timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017,
a. Within 30 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative review.
b. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 30
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental administrative review.
d. Within 96 days of the close of the public
comment period and notification by the applicant that the public notice has
been published, the Department shall complete a technical review.
e. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
f. Within 96
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
4. Permit application fee: the application
fee is the sum of fees associated with each individual permit category included
in the combined permit. Eligible categories include WW07, $490, WW08, $95,
WW10, $490, WW11, $95, WW01a, $215, and WW01b, $330.
(k)
(2) (
WW27) Combined
permit amendment for waterways and water quality certifications.
1. Category: combined permit amendment for
waterways and water quality certifications.
2. Description: combined permit amendment for
water quality certification (WW09) and waterways license (WW03) pursuant to
314 CMR 9.00:
401
Water Quality Certification for Discharge of Dredged or Fill Material,
Dredging, and Dredged Material Disposal in Waters of the United States Within
the Commonwealth and
310 CMR
9.00:
Waterways.
3. Schedule for timely action: for projects
for which applications are filed and/or fees received on or after March 24,
2017,
a. Within 30 days of receipt of an
application and payment of the permit application fee, the Department shall
complete an administrative review.
b. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
c. Within 30
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental administrative review.
d. Within 60 days of the close of the public
comment period and notification by the applicant that the public notice has
been published, the Department shall complete a technical review.
e. The applicant may remedy identified
deficiencies within 60 days of the Department's statement identifying
deficiencies, if any.
f. Within 60
days of receipt of materials from the applicant in response to the Department's
statement identifying deficiencies, the Department shall complete a
supplemental technical review.
4. Permit application fee: $302.
Wetlands
(m) (
WW13) Permits
for wetlands.
1. Category: permits for
renovation of abandoned cranberry bogs.
2. Description: permits pursuant to
310 CMR 23.00:
Renovation of Abandoned Cranberry Bogs for renovation of
abandoned cranberry bogs.
3.
Schedule for timely action: for projects for which applications are filed and
fees received on or after March 24, 2017,
a.
Within 24 days of receipt of an application and payment of the permit
application fee, the Department shall complete an administrative completeness
review.
b. Within 72 days of the
close of the public comment or administrative completeness period or public
hearing, if any, whichever occurs later, the Department shall complete a
technical review.
c. The permit
applicant may remedy identified deficiencies within 180 days of the
Department's statement identifying deficiencies, if any.
d. Within 72 days of receipt of materials
from the applicant in response to the Department's statement identifying
deficiencies or the close of public hearing, if any, whichever later, the
Department shall complete a supplemental technical review.
4. Permit application fee: $785.
(n)
(
WW18) Permits for Wetlands.
1. Category: Notice of Intent and Abbreviated
Notice of Intent.
2. Description:
Notice of Intent and Abbreviated Notice of Intent pursuant to M.G.L. c. 131,
§ 40 and
310 CMR
10.05(4):
Notices of
Intent. The designation of the Department's file number shall not
imply that the plans and supporting documents have been judged adequate for the
issuance of an Order, but only that copies of the minimum submittal
requirements contained in the general instructions have been filed.
3. Schedule for timely action: for projects
for which Notices of Intent or Abbreviated Notices of Intent are filed and fees
received on or after March 24, 2017,
a. Within
21 days of receipt of a Notice of Intent or Abbreviated Notice of Intent and
payment of the permit application fee, the Department shall complete an
administrative completeness review.
b. The permit applicant may remedy identified
deficiencies within 21 days of the Department's statement identifying
deficiencies, if any.
c. Within 21
days of the Department's receipt of materials from the applicant in response to
the Department's statement identifying deficiencies, the Department shall
complete a final review resulting in a decision to issue or deny a file
number.
4. Permit
application fee: The fee, created pursuant to M.G.L. c. 131, § 40, is for
work proposed under a single Notice of Intent. When the application involves
more than one activity the fee shall be determined by adding the fees for each
proposed activity, except that when work involves activities within the
riverfront area as well as another resource area, the fee shall be determined
by adding an additional 50% to the fee calculated for activities in another
resource area(s) or the buffer zone to another resource area for each of the
proposed activities within the riverfront area:
a. Category 1: $110
b. Category 2: $500
c. Category 3: $1050
d. Category 4: $1450
e. Category 5: $4 per linear foot f. Category
6: $2 per linear foot with a maximum of $200 for a single-family house project
and a maximum of $2000 for any other activity.
(o) (
WW19) Permits
for Wetlands.
1. Category: Superseding
Determination of Applicability.
2.
Description: Superseding Determination of Applicability pursuant to
310 CMR
10.05(3)(c):
Appeal
to the Department.
3.
Schedule: for projects for which Requests for Superseding Determination of
Applicability are filed and fees received on or after March 24, 2017,
a. Within 70 days of receipt of Request for
Superseding Determination of Applicability and payment of the application fee,
the Department shall complete technical review.
b. The permit applicant may remedy identified
deficiencies within 70 days of the Department's statement identifying
deficiencies, if any.
c. Within 40
days of the Department's receipt of materials from the applicant in response to
the Department's statement identifying deficiencies, the Department shall
complete a supplemental review.
4. Permit application fee:
$120.
(p)
(
WW20) Permits for Wetlands.
1. Category: Superseding Order of
Conditions.
2. Description:
Superseding Order of Conditions pursuant to
310 CMR
10.05(7):
Requests
for Actions by the Department (Appeals).
3. Schedule: for projects for which Requests
for Superseding Order of Conditions are filed and fees received on or after
March 24, 2017,
a. Within 70 days of receipt
of Request for Superseding Order of Conditions and payment of the application
fee, the Department shall complete technical review.
b. The permit applicant may remedy identified
deficiencies within 70 days of the Department's statement identifying
deficiencies, if any.
c. Within 40
days of the Department's receipt of materials from the applicant in response to
the Department's statement identifying deficiencies, the Department shall
complete a supplemental review.
4. Permit application fee:
a. Superseding Order of Conditions for
individual single-family homes with associated structures: $120.
b. All Other Superseding Order of Conditions:
$245.
(q)
(
WW21) Permits for Wetlands.
1. Category: Superseding Order of Resource
Area Delineation.
2. Description:
Superseding Order of Resource Area Delineation pursuant to
310 CMR
10.05(7):
Requests
for Actions by the Department (Appeals).
3. Schedule: for projects for which Requests
for Superseding Order of Resource Area Delineation are filed and fees received
on or after March 24, 2017,
a. Within 70 days
of receipt of Request for Superseding Determination of Applicability and
payment of the application fee, the Department shall complete technical
review.
b. The permit applicant may
remedy identified deficiencies within 70 days of the Department's statement
identifying deficiencies, if any.
c. Within 40 days of the Department's receipt
of materials from the applicant in response to the Department's statement
identifying deficiencies, the Department shall complete a supplemental
review.
4. Permit
application fee: $120.
(r) (
WW22) Permits
for Wetlands.
1. Category: Request for
Variance.
2. Description: Variance
pursuant to
310 CMR
10.05(10):
Variance.
3.
Schedule: for projects for which Requests for Variance are filed and fees
received on or after March 24, 2017,
a.
Within 70 days of receipt of Request for Variance and payment of the
application fee, the Department shall complete technical review.
b. The permit applicant may remedy identified
deficiencies within 70 days of the Department's statement identifying
deficiencies, if any.
c. Within 40
days of the Department's receipt of materials from the applicant in response to
the Department's statement identifying deficiencies, the Department shall
complete a supplemental review.
4. Permit application fee:
$9,830.
(s)
(
WW23) Permits for Wetlands.
1. Category: Request for Variance with a
claim of unconstitutional taking of property.
2. Description: Variance with a claim of
unconstitutional taking of property pursuant to
310 CMR
10.05(10):
Variance.
3.
Schedule: for projects for which Requests for Variance are filed and fees
received on or after March 24, 2017,
a. Within
70 days of receipt of Request for Variance and payment of the application fee,
the Department shall complete technical review.
b. The permit applicant may remedy identified
deficiencies within 70 days of the Department's statement identifying
deficiencies, if any.
c. Within 40
days of the Department's receipt of materials from the applicant in response to
the Department's statement identifying deficiencies, the Department shall
complete a supplemental review.
4. Permit application fee: $245.