Minn. R., Part 6135.0620 - RATE TABLE II, WIDE UNDERWATER CROSSINGS
The following table applies to underwater crossings involving a disturbance of ten feet or more in width at the water's edge.
Total Length in Feet Per Each Crossing | ||||||
Type of Utility | 0-100 | 101 -200 | 201 -300 | 301 -400 | 401 -500 | 500+ |
RATE PER CROSSING | ||||||
Pipeline | $293 | $361 | $440 | $507 | $575 | $575 plus $73 per 100 feet or fraction thereof additional |
Electric Transmission | 225 | 270 | 327 | 383 | 440 | $440 plus $56 per 100 feet or fraction thereof additional |
Electric Distribution, Telephone, Telegraph, and Fiberoptic | 147 | 192 | 225 | 259 | 293 | $293 plus $39 per 100 feet or fraction thereof additional |
The length of an underwater crossing is measured by the number of feet of line between banks or shores. The license fee is determined by calculating separately the length of each crossing on the same application, finding the rate for each crossing by referring to the appropriate column, and then adding together the resulting rate determinations.
Example. Pipeline application. Three underwater crossings.
Length (feet) | Rate | |
Crossing #1 | 461 | $575 |
Crossing #2 | 24 | 293 |
Crossing #3 | 231 | 440 |
License fee | $1,308 |
Notes
Statutory Authority: MS s
14.388;
L
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.