Minn. R. Part 7081.0180 - SOIL INTERPRETATION FOR SYSTEM DESIGN
Site and soil information gathered in parts 7081.0160 and 7081.0170 must be interpreted for suitability for MSTS siting, design, and construction, with consideration of the following:
Systems proposed to be located in flood fringes must determine feasibility of relocating the system outside the floodplain.
The limiting layer in the soil shall be determined based on the depth of bedrock or periodically saturated soil if encountered. The depth to the periodically saturated soil shall be determined according to part 7080.1720, subpart 5, item E, and the depth of bedrock shall be as defined under part 7080.1100, subpart 8.
Notes
Statutory Authority: MS s 115.03; 115.55
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.