Mont. Admin. r. 17.8.1212 - REQUIREMENTS FOR AIR QUALITY OPERATING PERMIT CONTENT RELATING TO MONITORING, RECORDKEEPING, AND REPORTING
(1) Each air quality
operating permit shall contain the following requirements with respect to
monitoring:
(a) All monitoring and analysis
procedures or test methods required under the applicable monitoring and testing
requirements, including ARM
17.8.1501 through
17.8.1514 and any other procedures and
methods that may be promulgated pursuant to sections 504(b) or 114(a) (3) of the
FCAA. If more than one monitoring or testing requirement applies, the permit may
specify a streamlined set of monitoring or testing provisions if the specified
monitoring or testing is adequate to assure compliance at least to the same extent
as the monitoring or testing applicable requirements that are not included in the
permit as a result of such streamlining;
(b) Where the applicable requirement does not
require periodic testing or instrumental or noninstrumental monitoring (which may
consist of recordkeeping designed to serve as monitoring), periodic monitoring
sufficient to yield reliable data from the relevant time period that are
representative of the source's compliance with the air quality operating permit, as
reported pursuant to (3). Such monitoring requirements shall assure use of terms,
test methods, units, averaging periods, and other statistical conventions consistent
with the applicable requirement. Recordkeeping provisions may be sufficient to meet
the requirements of this section; and
(c) as necessary, requirements concerning the use,
maintenance, and, where appropriate, installation of monitoring equipment or
methods.
(2) Each air quality
operating permit shall incorporate all applicable recordkeeping requirements and
require, where applicable, the following:
(a)
Records of required monitoring information that include the following:
(i) the date, place as defined in the permit, and
time of sampling or measurements;
(ii)
the date(s) analyses were performed;
(iii) the company or entity that performed the
analyses;
(iv) the analytical techniques
or methods used;
(v) the results of such
analyses; and
(vi) the operating
conditions at the time of sampling or measurement.
(b) Retention of records of all required
monitoring data and support information for a period of at least five years from the
date of the monitoring sample, measurement, report, or application. Support
information includes all calibration and maintenance records and all original
strip-chart recordings for continuous monitoring instrumentation, and copies of all
reports required by the permit. All monitoring data, support information, and
required reports and summaries may be maintained in a computerized form at the plant
site if the information is made available to department personnel upon request,
which may be for either hard copies or computerized format. Strip-charts must be
retained in their original form at the plant site and shall be made available to
department personnel upon request.
(3) All applicable reporting requirements must be
included in the permit. Each air quality operating permit shall incorporate the
following requirements relating to reporting:
(a)
submittal of reports of any required monitoring at least every six months. All
instances of deviations from the permit requirements must be clearly identified in
such reports. All required reports must be certified by a responsible official
consistent with ARM
17.8.1207.
(b) prompt reporting of deviations from permit
requirements, including those attributable to upset conditions as defined in the
permit, the probable cause of such deviations, and any corrective actions or
preventive measures taken. To be considered prompt, deviations shall be reported as
part of the routine reporting requirements under (3)(b), and if applicable, in
accordance with the malfunction reporting requirements under ARM
17.8.110, unless otherwise specified in
an applicable requirement.
(4) The requirement to obtain a permit under this
subchapter may not be used as the basis for establishing new monitoring,
recordkeeping, or reporting requirements, except as may be required under
(1)(b).
Notes
75-2-217, 75-2-218, MCA; IMP, 75-2-217, 75-2-218, MCA;
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.