Nev. Admin. Code § 333A.140 - Criteria for evaluation of applicants
As set forth in NRS 333A.080, the Division will use the following criteria for evaluation in determining whether an applicant meets the requirements of a qualified service company:
1. Design;
2. Engineering;
3. Installation;
4. Maintenance and repairs associated with performance contracts;
5. Experience in conversions to different sources of energy or fuel and other services related to operating cost-savings measures provided that is done in association with a comprehensive energy, water or waste disposal cost-savings retrofit;
6. Monitoring projects after the projects are installed;
7. Data collection and reporting of savings;
8. Overall project experience and qualifications;
9. Management capability;
10. Ability to access long-term financing;
11. Experience with projects of similar size and scope; and
12. Such other factors determined by the Division to be relevant and appropriate to the ability of a company to perform the projects.
Notes
NRS 333A.080, 341.070
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.