Nev. Admin. Code § 444.8362 - Absorption bed: Inspections
1. The construction
of an individual sewage disposal system that includes an absorption bed must be
inspected and verified by an engineer or, if the system is designed by a
homeowner as part of a residential system for his or her home, the homeowner.
The inspections must be conducted as follows:
(a) Following excavation, the bottom of the
absorption bed must be examined to ensure that there is no loose soil and that
no smearing conditions exist; and
(b) Upon completion of the installation of
the distribution lines in the absorption bed, the individual sewage disposal
system must be inspected to ensure that the system complies with the approved
design plans.
2. If a
residential system that includes an absorption bed is designed by a homeowner:
(a) The homeowner shall contact the
administrative authority for an inspection; and
(b) The administrative authority shall
inspect the construction by conducting an on-site inspection or, at the
discretion of the administrative authority, reviewing photographic
documentation provided by the homeowner, before the covering is placed on the
system, to ensure that the system complies with the approved plans.
3. If an individual sewage
disposal system is designed by an engineer, the engineer shall, within 30 days
after the date on which construction of the system is completed, submit a
letter to the administrative authority stating that the system was constructed
in accordance with the approved plans.
Notes
NRS 439.200, 444.650
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.