Nev. Admin. Code § 444.8386 - Capping fill trench: Inspections. ( NRS 439.200 , 444

1. An engineer shall inspect the construction of a capping fill:
(a) Upon the completion of the installation of the distribution lines in the absorption trenches.
(b) When the fill area has been scarified. The engineer shall inspect the fill and native soils to ensure that they are not excessively moist and are of similar texture.
(c) When the capping fill has been placed:
(1) To ensure that there is an adequate interface of the fill and soils at the surface; and
(2) To verify the dimensions of the capping fill.
2. The engineer shall, within 30 days after the date on which the construction of the system is completed, submit a letter to the health authority stating the system was constructed in accordance with the approved plans.

Notes

Nev. Admin. Code § 444.8386
Added to NAC by Bd. of Health by R129-98, eff. 3-25-99

NRS 439.200, 444.650