Nev. Admin. Code § 444.8392 - Elevated mound system: Inspections
1. The construction
of an elevated mound system must be inspected and verified by an engineer when:
(a) The basal area of the elevated mound has
been scarified;
(b) The
distribution lines have been placed in the aggregate absorption bed;
(c) The topsoil cap has been placed;
and
(d) If a dosing system is used,
all the pumps, switches and alarms associated with the dosing system have been
installed. The engineer shall verify that the operational liquid levels in the
dosing tank are set as specified by the design plans.
2. The engineer must develop a manual for the
operation and maintenance for the elevated mound system and submit the manual
to the health authority for review before a permit or other type of approval
authorizing occupancy may be issued.
3. The engineer shall, within 30 days after
the date on which the project is completed, submit a letter to the health
authority stating that the system was constructed in accordance with the
approved plans.