Nev. Admin. Code § 444.8392 - Elevated mound system: Inspections

1. The construction of an elevated mound system must be inspected and verified by an engineer when:
(a) The basal area of the elevated mound has been scarified;
(b) The distribution lines have been placed in the aggregate absorption bed;
(c) The topsoil cap has been placed; and
(d) If a dosing system is used, all the pumps, switches and alarms associated with the dosing system have been installed. The engineer shall verify that the operational liquid levels in the dosing tank are set as specified by the design plans.
2. The engineer must develop a manual for the operation and maintenance for the elevated mound system and submit the manual to the health authority for review before a permit or other type of approval authorizing occupancy may be issued.
3. The engineer shall, within 30 days after the date on which the project is completed, submit a letter to the health authority stating that the system was constructed in accordance with the approved plans.

Notes

Nev. Admin. Code § 444.8392
Added to NAC by Bd. of Health by R129-98, eff. 3-25-99

NRS 439.200, 444.650

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.