Nev. Admin. Code § 449.74361 - New construction or remodeling: Submission and approval of building plans; prerequisites to approval of facility for licensure
1. Except as otherwise provided in subsection
4, before any new construction of a facility or any remodeling of an existing
facility is begun:
(a) The facility shall
submit a copy of the building plans for the new construction or remodeling to
the entity designated to review such plans by the Division pursuant to the
provisions of NAC
449.0115. The entity's review of
those plans is advisory only and does not constitute approval for licensure of
the facility.
(b) The building
plans must be approved by the Division.
2. The Bureau shall not approve a facility
for licensure until all construction is completed and a survey is conducted at
the site of the facility.
3. The
Division shall not issue a license to operate a facility until the Bureau has
approved the construction of the facility.
4. The provisions of subsection 1 do not
apply to plans for remodeling a facility if the remodeling is limited to
refurbishing an area within the facility, including, without limitation,
painting in the area, replacing flooring in the area, repairing windows in the
area or replacing window and wall coverings in the area.
Notes
NRS 449.0302
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.