Nev. Admin. Code § 449.99718 - Design, construction, equipment and maintenance
1.
A recovery center must be designed, constructed, equipped and maintained in a
manner that protects the health and safety of the patients and personnel of the
recovery center and members of the general public.
2. A recovery center shall comply with all
applicable:
(a) Federal and state
laws;
(b) Local ordinances,
including, without limitation, zoning ordinances; and
(c) Life safety, environmental, health, fire
and local building codes, related to the construction and maintenance of the
recovery center. If there is a difference between state and local requirements,
the more stringent requirements apply.
3. Except as otherwise provided in this
section:
(a) Each recovery center shall comply
with the provisions of NFPA 101: Life Safety Code, as adopted by reference
pursuant to NAC
449.0105.
(b) Any new construction, remodeling or
change in use of a recovery center must comply with the applicable provisions
of the guidelines adopted by reference in paragraphs (c), (d) and (e) of
subsection 1 of NAC
449.0105, unless the remodeling
is limited to refurbishing an area within the recovery center, including,
without limitation, painting the area, replacing the flooring, repairing
windows or replacing window and wall coverings.
4. A recovery center shall be deemed to be in
compliance with the provisions of subsection 3 if:
(a) The recovery center:
(1) Was licensed as a facility for
intermediate care pursuant to
NRS
449.040 to
449.094, inclusive, before
September 21, 2017;
(2) Is seeking
to change its operation as an intermediate care facility to a recovery
center;
(3) Does not change the use
of the physical space in the recovery center; and
(4) Does not have any deficiencies in the
construction of the recovery center that are likely to cause serious injury,
harm or impairment to the health and welfare of the public; or
(b) Before September 21, 2017, the
recovery center initially applied for licensure as an intermediate care
facility pursuant to NRS 449.040 to
449.094, inclusive, and:
(1) The recovery center submitted building
plans to the Division in the manner set forth in NAC
449.0115;
(2) The Division determines that the plans
comply with the standards for construction of intermediate care facilities,
which are set forth in NAC
449.685 to
449.728, inclusive;
(3) Construction of the recovery center has
commenced;
(4) The center is
constructed in accordance with such standards; and
(5) There are no deficiencies in the
construction of the recovery center that are likely to cause serious injury,
harm or impairment to the health and welfare of the public.
5. A recovery center
shall submit building plans for new construction or remodeling to the entity
designated to review such plans by the Division pursuant to NAC
449.0115. The entity's review of
those plans is advisory only and does not constitute approval for the licensing
of the recovery center. Before the construction or remodeling may begin, the
plans for the construction or remodeling must be approved by the Division. The
Division shall not approve a recovery center for licensure until all
construction or remodeling has been completed and a survey is conducted at the
site of the recovery center.
Notes
NRS 439.200, 449.0302, 449.0303