Nev. Admin. Code § 459.953469 - Commencement of construction before issuance of permit to construct
1. If the Division determines that a new
process is being constructed in the interest of mitigating the effects of
acutely hazardous conditions on public safety, the environment or the health of
personnel, and timely implementation of the new process is critical to ensure
the preservation of those objectives, the Division may allow the owner or
operator to commence construction on the new process before the permit to
construct is issued.
2. The owner
or operator of a new process may commence construction before a permit to
construct is issued if:
(a) The owner or
operator submits with its application for a permit to construct a letter
detailing the reasons for the request to begin construction before the issuance
of the permit to construct; and
(b)
The Division determines the application to be complete and has not identified
any significant unmitigated hazard.
3. The Division may:
(a) Impose such conditions as it determines
necessary in authorizing an owner or operator to commence construction before a
permit to construct is issued; and
(b) Revoke the authorization if it determines
that the owner or operator has not complied with the conditions
imposed.
Notes
NRS 459.3818, 459.3829