N.H. Admin. Code § Puc 1203.01 - Initiation of Utility Service
(a) The utility may
require all applicants for service under a utility's filed tariff to make
application to the utility in writing, in accordance with the forms prescribed
by the utility.
(b) An applicant
for service may initially make an oral application for service. If the utility
requires written confirmation as provided for in (a) above, the utility shall
require such written confirmation of the oral application to be made within 10
calendar days.
(c) The location to
which an applicant requests service shall be:
(1) Within the utility's authorized franchise
area; and
(2) Equipped with
existing utility facilities in compliance with local occupancy
requirements.
(d) The
utility shall make reasonable efforts to determine if the applicant has an
outstanding balance with the utility at the time of the applicant's request for
service.
(e) An applicant for
residential service shall not be held responsible for an outstanding balance
incurred in the name of someone other than the applicant unless:
(1) The applicant and the individual in whose
name the balance was incurred resided together at the time the balance was
incurred; and
(2) The applicant and
the individual in whose name the balance was incurred will continue to reside
together at the location for which new service has been requested.
(f) Notwithstanding (c) (2) above,
upon receiving a request for service to a location where facilities do not
exist, all utilities shall provide all facilities necessary for service, or
initiate a request for such facilities, where the provision of service to the
location is economically feasible and the customer has obtained all necessary
easements and permits and paid all applicable fees under the utility's tariff,
and those facilities shall be exempt from the timing constraints of Puc
1203.01(h) below.
(g) The utility
may charge for connection of service as specified in its tariff.
(h) Upon compliance by an applicant with all
application requirements, the utility shall complete the service connection,
where facilities exist which support the requested service, without undue
delay.
(i) At the time a customer
contracts for construction involving the installation or modification of
utility services, the utility shall provide the customer with written or
electronic notice stating that there might be additional charges assessed by
other providers for service requested by the customer from those
providers.
(j) A utility shall not
connect service at a rate other than the applicable tariffed rate or rate
schedule unless a special contract for such service is in effect.
(k) A gas utility shall ask the customer
applying for new service whether the service will be used to heat the location
and for any other information necessary to determine if the appropriate rate
will be a heating or non-heating rate.
(l) The utility shall not deny service to any
otherwise qualified applicant based upon any of the following characteristics:
(1) Income;
(2) Home ownership;
(3) Race;
(4) Color;
(5) Creed;
(6) Sex;
(7) Gender identity;
(8) Sexual orientation;
(9) Marital status;
(10) Age, with the exception of unemancipated
minors;
(11) National origin;
or
(12) Disability.
Notes