N.H. Admin. Code § Puc 2502.22 - Historical generation baseline

"Historical generation baseline" means:

(a) For a hydroelectric facility, the average annual electrical production, in megawatt-hours, from the later of January 1, 1986, or the date of first commercial operation through December 31, 2005, adjusted as if any upgrade or expansion completed during the period had been in place over the entire period as described in RSA 362-F:2, X(b); or
(b) For other facilities, the average annual electrical production, in megawatt-hours, for 2004 through 2006, or for the first 36 months after the facility began operation if that date is after December 31, 2001, as described in RSA 362-F:2, X(a).

Notes

N.H. Admin. Code § Puc 2502.22

#9037, INTERIM, eff 11-27-07, EXPIRED: 5-25-08

New. #9169, eff 6-3-08

Amended byVolume XXXV Number 01, Filed January 8, 2015, Proposed by #10741, Effective 12/5/2014. Amended by Volume XXXVIII Number 06, Filed February 8, 2018, Proposed by #12473, Effective 2/1/2018, Expires 2/1/2028.

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.