N.J. Admin. Code § 19:6-2.42 - Pile foundations
(a) The
allowable axial load on a pile shall be the least value permitted by
consideration of the following factors (for battered piles, the axial load
shall be computed from the resultant of all vertical loads and lateral forces
occurring simultaneously):
1. The capacity of
the pile as a structural member.
2.
The allowable bearing pressure on soil strata underlying the pile
tips.
3. The resistance to
penetration of the piles, including resistance to driving, resistance to
jacking, the rate of penetration, or other equivalent criteria as established
in this section.
4. The capacity as
indicated by load test, where load tests are required.
5. The maximum loads prescribed in this
section.
(b) Rules
concerning the capacity of the pile as a structural member are:
1. Embedded portion of the pile: The
compressive stress on any cross section of a pile produced by that portion of
the design load that is considered to be transmitted to that section shall not
exceed the allowable values for the construction materials as established in
table 615.11. The tensile stress shall not exceed the values established in
this article for like material.
2.
Portion of the pile that is not embedded: That portion of any pile that is free
standing in air or water shall be designed as a column in accordance with the
provisions of this subchapter, fixed at a point five feet below the soil
contact level in class 8-65 material or better and ten feet below in any other
material. The conditions of lateral and rotational restraint offered by the
pile cap shall be considered in determining the equivalent unbraced
length.
3. Load distribution along
embedded portion of the pile: The portion of the design load acting on any
cross section of a pile may be determined by analysis, considering time
dependent changes in distribution of the load. As an alternative method for the
purposes of this section, it may be assumed that:
i. For piles embedded 40 feet or more in
materials of class 10-65 or better, and bearing on or in materials of classes
1-65 to 5-65: 75 per cent of the load shall be assumed to be carried by the
tip. For shorter piles, with similar conditions of embedment and bearing, 100
per cent of the load shall be assumed carried by the tip.
ii. For piles embedded in materials of class
10-65 or better and bearing on or in materials of classes 6-65 to 10-65, the
full load shall be assumed to act as a cross section located at 2/3 of the
embedded length of the pile measured up from the tip. Where tapered piles are
used, the stress at all sections of the pile shall be determined on the basis
that the full load acts at a location 2/3 of the embedded length of the pile
measured up from the tip and that 1/3 of the full load acts at the tip. The
stresses so computed shall not exceed the allowable values in table
615.11.
iii. For conditions not
covered in subparagraphs i and ii of this subsection the provisions relating to
analysis shall apply.
(c) Rules concerning allowable bearing
pressure on soil strata underlying the pile tips are:
1. Bearing capacity: The allowable pile load
shall be limited by the provision that the pressures in materials at and below
the pile tips, produced by the loads on individual piles and by the aggregate
of all piles in a group or foundation, shall not exceed the allowable bearing
values established in section 21 of this subchapter. The provisions of sections
24 and 25 of this subchapter shall apply. The transfer of load from piles and
soil shall be determined by the recognized method of analysis. As an
alternative, for purposes of this section, piles or pile groups may be assumed
to transfer their loads to the underlying materials by spreading the load
uniformly at an angle of 60 degrees with the horizontal, starting at a polygon
circumscribing the piles, located as follows:
i. For piles embedded entirely in materials
of classes 4-65 to 8-65, the polygon shall be circumscribed at a level located
2/3 of the embedded length of the pile, measured up from the tip.
ii. For piles penetrating through soils of
classes 9-65, 10-65, or 11-65 into bearing soils of class 8-65 or better, the
polygon shall be circumscribed at the bottom of the strata of class 9-65,
10-65, or 11-65 materials.
iii. In
the case of piles having enlarged bases, the lateral distribution of the load
to the soil may be assumed to begin at the junction of the shaft and the
enlarged base and to extend as follows:
(1)
In the case where the enlarged base is formed in loose or medium compact (N
value less than 30) soils in class 6-65 or 7-65 that extend 20 feet or more
below the junction of the base and shaft, or that are of lesser extent but are
directly underlain by soil of class 5-65 or better, the bearing area may be
taken at the plane six feet below said junction but not lower than the bottom
of the soils strata of class 6-65 or 7-65.
(2) Where the enlarged base is formed in
compact (N value 30 to 60) soils of class 6-65 or 7-65 or in any soil of these
classes that extends less than 20 feet below the junction of the base and the
shaft and that is underlain by soil of class 8-65 or poorer, the bearing area
shall be taken at planes less than six feet below said junction, with a lower
limit of three feet where the material is very compact (N value 60, or greater)
and the extent of the class 6-65 or 7-65 material is ten feet below the
junction of shaft and base. (Provisions of section 48 of this subchapter
relating to the minimum depth of bearing stratum below the junction of base and
shaft shall apply.) For conditions intermediate between that described in item
(1) above and the lower limit conditions described here, the location of the
bearing area may be determined by linear interpolation between the indicated
limits of N value and extent of bearing material below the junction of shaft
and base, giving equal weight to both variables.
(3) Where the enlarged base is formed in or
on soils of class 4-65 or 5-65, the bearing area shall be taken at a depth
below the junction of the shaft and base consonant with the size and depth of
the base formed, and as evaluated from the required test piles.
iv. For all piles bearing on soils
of classes 1-65 to 3-65, analysis of load distribution will not be required if
the requirements relating to capacity of the pile as a structural member, to
resistance to penetration, to load test where required, and to maximum
tabulated loads are satisfied.
v.
For piles in soils of classes 9-65 and 10-65, for cases not described above, or
for any case where the method of installing the pile utilizes a temporary
casing, the provisions relating to analysis shall apply.
vi. In no case shall the area considered as
supporting the load extend beyond the intersection of the 60 degrees planes of
adjacent piles or pile groups.
2. Bearing stratum: The plans for the
proposed work shall establish, in accordance with the requirements relating to
allowable bearing pressure, the bearing strata to which the piles in the
various sections of the building are to be penetrated and the approximate
elevations of the top of such bearing strata. Where penetration of a given
distance into the bearing strata is required for adequate distribution of the
loads, such penetration shall be shown on the plans. The indicated elevations
of the top of the bearing strata shall be modified by such additional data as
may be obtained during construction. All piles shall penetrate to or into the
designated bearing strata.
(d) Where subsurface investigation, as
described in this subchapter, or general experience in the area indicates that
the soil must be penetrated by the pile, consists of glacial deposits
containing boulders, or fills containing riprap, excavated detritus, masonry,
concrete, or other obstructions in sufficient numbers to present a hazard to
the installation of the piles, the selection of type of pile and penetration
criteria shall be subject to the approval of the chief engineer, but in no case
shall the minimum penetration resistance be less than that stipulated in tables
617.3 and 617.4.
1. Piles installed by use of
steam-powered, air-powered, diesel-powered or hydraulic impact hammers:
i. The minimum required driving resistance
and the requirements for hammer energies for various types and capacities of
piles are given in tables 617.3 and 617.4. To obtain the required total driving
resistance, the indicated driving resistances shall be added to any driving
resistance experienced by the pile during installation, but which will be
dissipated with time (resistance exerted by nonbearing materials or by
materials which are to be excavated). For purposes of this section, the
resistance exerted by nonbearing materials may be approximated as the
resistance to penetration of the pile recorded when the pile has penetrated to
the bottom of the lowest stratum of nominally unsatisfactory bearing material.
(Class 11-65 or to the bottom of the lowest stratum of soft or loose deposits
of class 9-65, but only where such strata are completely penetrated by the
pile. The provisions of sections 44 through 48 of this subchapter shall also
apply.)
ii. Alternate for
similitude method: The requirement of piling to the penetration resistances
given in tables 617.3 and 617.4 will be waived where the following five
conditions prevail:
(1) The piles bear on, or
in, soil of class 5-65 through class 10-65;
(2) The stratigraphy, as defined by not less
than one boring for every 4,000 square feet of building area, shall be
reasonably uniform or divisible into areas of uniform conditions;
(3) Regardless of pile type or capacity, one
load test, as described in this section, shall be conducted in each area of
uniform conditions, but not less than two typical piles for the entire
foundation installation of the building or group of buildings on the site, nor
less than one pile for every 15,000 square feet of building area, or one pile
for every 100 piles installed, whichever is less, shall be load
tested;
(4) Except as permitted by
the provisions of item (6) below, all building piles within the area of
influence of a given load-tested pile of satisfactory performance shall be
installed to the same or greater driving resistance as the successful
load-tested pile. The same equipment that was used to install the load-tested
pile shall be used to install all other building piles, and the equipment shall
be operated identically with respect to steam or air pressure, type and
condition of cap block, length of hose, accessories, and all other variables.
Also, all other piles shall be of same type, size and shape as the load-tested
pile. All building piles within the area of influence represented by a given
satisfactory load-tested pile shall bear in, or on, the same bearing stratum as
the load-tested pile;
(5) A report
by the architect or engineer shall be submitted establishing to the
satisfaction of the chief engineer that the soil bearing pressures do not
exceed the values permitted by the provisions of this subchapter and that the
probable differential settlements will not cause stress conditions in the
building in excess of those permitted by the provisions of this
subchapter.
(6) Where the structure
of the building or the spacing and length of the piling is such as to cause the
building and its foundation to act as an essentially rigid body, the building
piles may be driven to length and/or penetration into the bearing stratum
without regard to penetration resistance, subject to the requirements of item
(5) above relating to submission of report.
2. Piles installed by jacking or static
forces: The carrying capacity of a pile installed by jacking or static forces
shall be not more than 50 per cent of the load or force used to install the
pile to the required penetration, except for piles jacked into position for
underpinning. The working load of a temporary underpinning shall not exceed the
total jacking force at final penetration. The working load of each permanent
underpinning pile shall not exceed the larger of the following values: 2/3 of
the total jacking force used to obtain the required penetration if the load is
held constant for seven hours without measurable settlement; or 1/2 of the
total jacking force at final penetration if the load is held for a period of
one hour without measurable settlement. The jacking resistance used to
determine the working load shall not include the resistance offered by
nonbearing materials which will be dissipated with time.
3. Piles installed by use of vibratory
hammer: The capacity of piles installed by vibratory hammers shall not exceed
the value established by the principle of similitude as follows:
i. Comparison piles, as required by the
provisions of subsection (e) of this section, shall be installed using an
impact hammer and driving resistance corresponding to the proposed pile
capacities as determined in subsection (d) of this section, or to tip
elevations and driving resistances as determined by the architect or
engineer.
ii. For each comparison
pile, install an identical index pile by use of the vibratory hammer at a
location at least four feet, but not more than six feet, from each comparison
pile. The index piles shall be installed to the same tip elevation as the
comparison pile, except that where the comparison piles bear on soils of
classes 1-65 to 5-65, the index piles shall bear in, or on, similar material.
All driving data for the index piles shall be recorded.
iii. The index piles shall be load tested in
accordance with the provisions of subsection (e) of this section. Should the
specified load test criteria indicate inadequate capacity of the index piles,
steps i, ii and iii of this paragraph shall be repeated, using longer, larger,
or other types of piles.
iv. All
building piles within the area of influence of a given satisfactorily tested
index pile shall be installed to the same or lesser rate of penetration (inches
per minute) as the successful index pile. The same equipment that was used to
install the index pile, identically operated as to rpm, manifold pressure, and
so forth, shall be used to install the building piles. Also, all building piles
shall be of the same type, size and shape as the index pile. All building piles
within the area of influence as represented by a given satisfactory tested
index pile bear in, or on, the same bearing stratum as the index
pile.
(e)
Load test of piling shall be required as follows:
1. Piles installed by static forces and piles
installed by bored holes: The load bearing capacity of all types and capacities
of piles installed by static forces or in bored holes (other than underpinning
piles installed by jacking) shall be demonstrated by load test.
2. Piles driven by impact hammers: The load
bearing capacity of piles installed by impact hammers shall be demonstrated by
load test when the proposed pile capacity exceeds the following values.
i. Caisson piles: No load test
required.
ii. Piles installed upon
end to rock of class 1-65, 2-65 or 3-65--100 tons, except as provided in
subparagraph iv of this paragraph, and except that no load tests will be
required for piles up to 200 tons capacity wherein the pile load does not
exceed 80 per cent of the load determined on the basis of limiting stresses in
the pile materials and provided that the pipe or shell be driven to the
resistance indicated in table 617.3;
iii. Piles bearing on rock or hardpan (soil
classes 1-65 to 5-65) other than as described in subparagraph ii above and
except as provided in subparagraph iv below.
iv. Piles bearing on materials of class 8 or
better, wherein, on the assumption that 100 per cent of the load reaches the
pile tip (or, in the case of piles having an enlarged base or other enlargement
of the bearing area, the top of the enlargement), the bearing pressure on the
soil underlying the tips or bases can be demonstrated to be equal to or less
than the values of basic allowable pressure indicated in table 613.7, provided
that the class and density of the bearing material supporting the piles be
confirmed by not less than one boring at each column location, then the chief
engineer may reduce the required number of load tests.
v. All other types of piles: 30
tons.
3. Piles installed
by use of vibratory hammers: The load bearing capacity of all types and
capacities of piles (other than caisson piles) shall be demonstrated by load
test.
4. Load test procedures:
Before any load test is made, the proposed apparatus and structure to be used
in making the load test shall be satisfactory to the chief engineer and, when
required by the chief engineer, all load tests shall be made under the
surveillance of the chief engineer or his representative. A complete record of
such tests shall be filed with the chief engineer:
i. Areas of the foundation site within which
the subsurface soil conditions are substantially similar in character shall be
established. In addition, for friction piles bearing on soil materials of class
6-65 or poorer, the uniformity of each such area shall be verified by
installing at least three penetration test piles, distributed over the area.
Continuous records of penetration resistance shall be made for such piles. If
the records of penetration resistance are not similar or are not in reasonable
agreement with the information obtained from the borings, the assumed areas of
similar subsurface conditions shall be modified in accordance with the
information derived from the penetration-test piles and additional
penetration-test piles shall be installed as required to verify the uniformity
of such areas.
ii. For piles
installed by jacking or static forces or by impact hammers, one load test shall
be conducted in each area of uniform conditions, but not less than two typical
piles for the entire foundation installation of the building or group of
buildings on the site, and not less than one pile for each 15,000 square feet
of the area of the building wherein said piles are to be used shall be load
tested. For piles installed by use of vibratory hammers, one comparison pile
shall be installed and one index pile shall be load tested in each area of
uniform conditions, but not less than two index piles shall be tested for the
entire foundation installation of the building or group of buildings on the
site, nor less than one index pile tested for every 7,500 square feet of the
area of the building wherein said piles are to be used. For piles whose
capacity is determined on the basis of similitude, the provisions of this
subsection shall apply.
iii. The
load test shall be conducted by a method that will maintain constant load under
increasing settlement. Settlement observations shall be made by means of dial
extensometers. The extensometers shall provide readings to the nearest 0.001
inch. In addition, settlement observations shall be taken using an engineer's
level reading to 0.001 foot, properly referenced to a well established
benchmark:
(1) Test loads shall be applied by
direct weight or by means of a hydraulic jack acting against a deadweight or a
reaction frame supported by anchor piles. The loading platform or box shall be
carefully constructed to provide a concentric load on the pile. If direct
weight is employed, the loading increments shall be applied without impact or
jar. The weight of the loading platform or box shall be obtained prior to the
test and this weight shall be considered as the first increment of load. If a
hydraulic jack is employed, facilities for maintaining each increment of
desired load constant under increasing settlement shall be provided. The gauge
and the jack shall be calibrated as a unit for each project.
(2) The test load shall be twice the proposed
working load of the pile. The test load shall be applied in seven increments at
a load of 50 per cent, 75 per cent, 100 per cent, 125 per cent, 150 per cent,
175 per cent and 200 per cent of the proposed working load. After the proposed
working load has been applied and for each increment thereafter, the test load
shall remain in place until there is no measurable settlement in a two-hour
period. The total test load shall remain in place until settlement does not
exceed 0.001 foot in 48 hours. The total load shall be removed in decrements
not exceeding 25 per cent of the total load at one-hour intervals or longer.
The rebound shall be recorded after each decrement is removed, and the final
rebound shall be recorded 24 hours after the entire test load has been
removed.
(3) Under each load
increment, settlement observations shall be made and recorded at one-half
minute, one minute, two minutes, four minutes, and each four minutes thereafter
after application of load increment, except in the instance of the total load,
where, after the four minutes reading, the time interval shall be successively
doubled until the final settlement limitation is reached and the load is
removed.
(4) The allowable pile
load shall be the lesser of the two values computed as follows:
(A) Fifty per cent of the applied load
causing a net settlement of the pile of not more than 0.01 inch per ton of
applied load. Net settlement in this paragraph means gross settlement due to
the total test load minus the rebound after removing 100 per cent of the test
load.
(B) Fifty per cent of the
applied load causing a net settlement of the pile of 0.75 inch. Net settlement
in this paragraph means gross settlement as defined in paragraph 1 of this
subsection, less the amount of elastic shortening in the pile section due to
total test load.
5. Foundation piles: Except as provided in
subsection (d) of this section, all building piles within the area of influence
of a given load-tested pile of satisfactory performances shall be installed to
the same or greater penetration resistance (or static load) as the successful
load-tested pile. The same equipment that was used to install the load-tested
pile shall be used to install all other building piles, and the equipment shall
be operated identically with respect to speed, height of fall, stroke,
pressure, type and conditions of cap block, length of hose, accessories, and
all other variables. Also all other piles shall be of the same type, size, and
shape as the load-tested pile. All building piles within the area of influence
represented by a given satisfactory load-tested pile shall bear in, or on, the
same bearing stratum as the load-tested pile. For friction piles where the
actual pile lengths vary more than 50 per cent from that of the test pile, the
chief engineer may require investigation to determine the adequacy of the
piles.
6. Pile groups: When the
chief engineer has reason to doubt the safe load sustaining capacity of pile
groups, he may require, at the expense of the owner, group load tests up to 150
per cent of the proposed group load.
7. "Casing off": Any temporary supporting
capacity that the soil might provide to the pile during a load test, but which
would be dissipated with time, shall be obviated by "casing off" or by other
suitable means. For purposes of this section, temporary supporting capacity
shall include the resistances offered by any strata of nominally unsatisfactory
bearing materials (class 11-65) or of soft or loose deposits of class 9-65 or
10-65 that are completely penetrated by the pile, or any resistance offered by
granular soils that will be dissipated by reason of vibration.
(f) Rules concerning maximum loads
are:
1. Basic maximum loads: except as
permitted by the provisions of paragraph 2 below, the maximum allowable pile
load, determined in accordance with the provisions of this subchapter, shall
not exceed the values specified in table 617.5
2. Substantiation of higher allowable loads:
The pile capacities tabulated in table 617.5 may be exceeded where a higher
value can be substantiated on the basis of test and analysis as follows:
i. Load tests: The provisions of subsection
(e) of this section shall be supplemented as follows:
(1) Not less than one single-pile test shall
be conducted for each 10,000 square feet of pile foundation area, or one such
load test for every 100 piles installed, whichever is less;
(2) Final load increments shall remain in
place for a total of not less than 96 hours;
(3) Single test piles shall be subjected to
cyclical loading or suitably instrumented so that the movements of the pile tip
and butt may be independently determined. Other alternate methods or devices,
acceptable to the chief engineer, which will permit evaluation to the transfer
of load from piles to soil may be used;
(4) If required, group load tests shall be
performed in groups of numerically average size. Except where the proposed
foundation is limited to a single and/or two-pile groups, each test group shall
contain not less than three piles;
(5) Individual pile loadings shall not exceed
those determined from a single-pile load test;
(6) The provisions of subsection (e) of this
section shall apply.
ii.
Analysis and report: A report shall be submitted by the architect or engineer
establishing to the satisfaction of the chief engineer (on the basis of soil
and load tests and foundation analysis, including analysis of the group action
of the piles) that the proposed construction under a 100 per cent overload of
the foundation is safe against failure of the pile and soil materials, and
showing that the probable total magnitude and distribution of settlement to be
expected under design conditions will not result in instability of the building
or stresses in the structure in excess of the allowable values.
iii. Penetration resistance: The penetration
resistance shall not be less than that required by the provisions of subsection
(d) of this section or, where applicable values are not indicated therein,
shall be determined from the required load tests. The pile material shall be
capable of withstanding the driving stresses without being damaged.