N.J. Admin. Code § 7:14A-22.10 - Requirements for stage III treatment works approval applications
(a) No person shall
operate a treatment works for which a treatment works approval from the
Department is required except in conformance with the provisions of this
subchapter.
(b) For treatment works
approvals that have been issued concurrently as stage II and stage III
approvals ("construct and operate"), operation of the facilities may occur upon
completion of the project, inspection and approval of the facilities by the
licensed professional engineer overseeing the construction, approval by the
local municipality or sewerage authority, and submission to the Department of
Form WQM005, Certification of Approval.
(c) For treatment works approvals that have
been issued as stage II ("construct only"), except for the temporary operation
of treatment works for the purpose of performance testing, operation may begin
only after written approval in the form of a stage III treatment works approval
is issued by the Department. Requirements for a stage III approval include:
1. Inspection and approval of the facilities
by the licensed professional engineer overseeing the construction and
submission of a properly completed form WQM005 to the Department;
2. Submission of a written request for
operation from the applicant or duly authorized agent and a written statement
in which proof that all conditions of the stage II TWA to construct have been
satisfied;
3. An appropriate fee
for a permit modification pursuant to
7:14A-22.25; and
4. Submission of "as-built" plans and
specifications if different than the approved plans and
specifications.
Notes
See: 40 N.J.R. 1478(a), 41 N.J.R. 142(a).
In (c)3, updated the N.J.A.C. reference.