N.J. Admin. Code § 7:14A-22.13 - Administrative requirements for wastewater holding tanks (non-industrial)
(a) Wastewater holding
tanks for temporary use may be approved by the Department in the following
circumstances:
1. Simultaneous or subsequent to the
issuance of a Stage II "dry/construct only" treatment works approval issued by the
Department pursuant to
7:14A-22.9(a), for
projects located in sewer ban areas; or
2. To serve a proposed project that is located in
an area not presently served by sanitary sewers and where a treatment works approval
has been issued and a contract has been awarded which contains a scheduled
completion date for the construction of downstream facilities necessary for the
elimination of the holding tank.
(b) An administrative authority may, pursuant to
7:9A-3.12, approve the temporary use of
a sewage holding tank for a period of up to 180 days for an existing structure
served by a malfunctioning septic system that is causing a public health
hazard.
(c) Wastewater holding tanks as
a permanent means of sewage disposal may be approved in the following circumstances:
1. The holding tank will be utilized to eliminate
a failed subsurface disposal system which has been certified by the local board of
health or the Department to be a health hazard, connection to a domestic treatment
works is not possible or practical, and the holding tank will not be utilized for
additional sources of wastewater flow resulting from a building expansion, change in
use, or other source;
i. For holding tanks to
serve a facility with a projected flow of less than 2,000 gallons per day, the
applicant shall demonstrate in accordance with
7:9A-3.4(d)1 through
(d)5, that the existing system was legally
constructed and cannot be repaired or rehabilitated and there are no feasible
alternatives or substitutes.
ii. For
holding tanks to serve a facility with a projected flow of 2,000 gallons or more, in
addition to demonstrating that the existing system cannot be repaired or
rehabilitated, an amendment to the appropriate wastewater management plan pursuant
to 7:15-4.3 may be required, unless in
accordance with 7:15-4.2 the use of the holding tank is
mandated by an administrative consent order executed between the Department and the
applicant; or
2. The holding
tank will be utilized at a marina or dock which serves watercraft that are equipped
with marine sanitation devices.
(d) The holding tank shall meet the technical
design requirements specified in
7:14A-23.5.
(e) The entity identified as the receiving
treatment plant for the final treatment and disposal of hauled wastewater shall have
sufficient capacity to handle the additional flow and not be subject to a sewer
connection ban.
Notes
See: 38 N.J.R. 5153(a).