N.J. Admin. Code § 7:14A-22.3 - Activities for which a treatment works approval is required
(a) Except
as provided in N.J.A.C. 7:14A-22.4, no person shall engage in any of the
following activities except in conformance with a valid treatment works
approval from the Department:
1. Building,
installing, modifying, or operating any treatment works including, but not
limited to, sewer extensions, sewer interceptors, domestic and industrial
wastewater treatment systems, holding tanks, equalization tanks and wastewater
treatment and recycling systems.
2.
Building, installing, modifying or operating any sewer line, pumping station or
force main which serves more than two buildings or will convey 8,000 gallons
per day or more of flow to a treatment works.
i. Increasing the projected flow in an
existing sewer line by 8,000 gallons per day or more shall require a treatment
works approval permit, irrespective or whether or not additional sewer line
construction is involved;
3. Building, installing, operating or
modifying any residuals treatment units, including, but not limited to,
facilities for composting, heat drying, thickening, digestion, air drying,
thermal reduction, dewatering and storage of sludge;
4. Building, installing, operating or
modifying any domestic or industrial treatment works that discharges directly
to the surface water or groundwater of the State;
5. Building, installing, operating or
modifying any individual subsurface sewage disposal system if required pursuant
to
N.J.A.C.
7:9A-3.9;
6. Building, installing, operating or
modifying any industrial treatment works located in any area of the State where
the Department is the control authority (non-delegated area) for an industrial
pre-treatment program pursuant to 40 CFR 403 and N.J.A.C. 7:14A-19;
or
7. Building, installing,
operating or modifying any process unit, storage unit or conveyance facilities
that treat and/or convey RWBR. Projects utilizing RWBR shall be authorized
under a NJPDES discharge permit.
(b) Industrial treatment works approval
applications submitted pursuant to (a)4 and 5 above will generally be processed
within 30 days of receipt of a complete application in accordance with
N.J.A.C.
7:14A-22.6.
(c) Projects for which flow is the
determining factor for the requirement of a treatment works approval pursuant
to this section, the projected flow criteria specified in
N.J.A.C.
7:14A-23.3 shall be used.
Notes
See: 28 N.J.R. 380(a), 28 N.J.R. 2779(a), 28 N.J.R. 3494(a), 28 N.J.R. 3858(a), 28 N.J.R. 4697(a), 28 N.J.R. 5028(a), 29 N.J.R. 1704(a).
Amended by R.2009 d.7, effective
See: 40 N.J.R. 1478(a), 41 N.J.R. 142(a).
In (a)4, substituted "; or" for ", with the exception of individual subsurface disposal systems exempted pursuant to N.J.A.C. 7:14A-22.4(a)3."; added new (a)5 and (a)7; recodified former (a)5 as (a)6; and in (a)6, substituted "; or" for a period at the end.
Notice of readoption with technical changes.
See: 47 N.J.R. 3027(a).