N.J. Admin. Code § 7:14A-24.10 - Additional requirements for stormwater discharges associated with construction activity
(a) This section sets
forth additional requirements applicable to "stormwater discharge associated with
small construction activity" as defined at
N.J.A.C.
7:14A-1.2, and to stormwater discharge associated
with construction activity described under subparagraph 1x of the
7:14A-1.2 definition of "stormwater
discharge associated with industrial activity." The Department may issue general
and/or individual NJPDES permits for such discharges. The NJPDES permit program for
such discharges shall be designed to reduce pollutants in such discharges. The
program components include:
1. NJPDES permit
conditions requiring that operating entities for construction sites implement
appropriate erosion and sediment control BMPs. NJPDES permits shall require
compliance with the Soil Erosion and Sediment Control Act,
4:24-39 et seq., and implementing
rules;
2. NJPDES permit conditions
requiring that operating entities for construction sites control waste such as
discarded building materials, concrete truck washout, chemicals, litter, sanitary
waste, and other solid or hazardous waste at the construction site that may cause
adverse impacts to water quality;
3. For
construction activities described under subparagraph 1x of the
7:14A-1.2 definition of "stormwater
discharge associated with industrial activity," NJPDES permit conditions imposing
any additional requirements necessary to achieve the applicable technology-based
standards of "best available technology" and "best conventional technology" based on
the Department's best professional judgment, effluent limitations and standards
promulgated under Section 301 of the Federal Act (
33 U.S.C. §
1311) , or new source performance standards
promulgated under Section 306 of the Federal Act (
33 U.S.C. §
1316);
4. NJPDES permit conditions requiring that
operating entities for construction sites develop, submit for review, and implement
a stormwater pollution prevention plan for construction activity. (This stormwater
pollution prevention plan shall include site descriptions, descriptions of
appropriate control measures, copies of approved State or local requirements,
maintenance procedures, inspection procedures, and identification of non-stormwater
discharges.);
5. The review of
stormwater pollution prevention plans, including the consideration of potential
water quality impacts of construction activity;
6. The implementation of applicable provisions of
7:50-4.81 through 4.85 (coordinated
permitting in the Pinelands Area);
7.
The receipt and consideration of information submitted by the public; and
8. Site inspection and enforcement of control
measures.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.