Chapter 89-08-02 - Construction Permits
- § 89-08-02-01 - Determining if a permit is required
- § 89-08-02-01.1 - Exceptions to the need for a permit
- § 89-08-02-02 - Contents of application
- § 89-08-02-03 - Permit does not absolve liability for damages
- § 89-08-02-03.1 - Time to complete construction of structure
- § 89-08-02-03.2 - Extending time to complete construction of structure
- § 89-08-02-04 - Emergency construction permits
- § 89-08-02-05 - Extension of emergency construction permits
- § 89-08-02-06 - Removal of emergency structures
- § 89-08-02-07 - As built plans
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
- § 89-08-02-01 - [Effective until 7/1/2024] Determining the capacity of dams, dikes, or other devices
- § 89-08-02-01 - [Effective 7/1/2024] Determining if a permit is required, version 2
- § 89-08-02-01.1 - [Effective 7/1/2024] Exceptions to the need for a permit
- § 89-08-02-02 - [Effective until 7/1/2024] Contents of application
- § 89-08-02-02 - [Effective 7/1/2024] Contents of application, version 2
- § 89-08-02-03 - Permit does not absolve liability for damages
- § 89-08-02-03.1 - Time to complete construction of structure
- § 89-08-02-03.2 - Extending time to complete construction of structure
- § 89-08-02-04 - [Effective until 7/1/2024] Emergency construction permits
- § 89-08-02-04 - [Effective 7/1/2024] Emergency construction permits, version 2
- § 89-08-02-05 - Extension of emergency construction permits
- § 89-08-02-06 - Removal of emergency structures
- § 89-08-02-07 - As built plans