Ohio Admin. Code 3318:1-5-04 - Limitations on state funding for the renovation of existing school buildings
(A)
Pursuant to section 3318.03 of the Revised Code, the
Ohio facilities construction commission may, at the request of a school
district board of education, approve a master plan, which includes renovation
projects that exceed the cost of new construction for the student population
assigned. The projected cost for such renovation projects shall be determined
pursuant to rule 3318-4-01
3318:1-3-01 of the Administrative Code, and such
renovation projects shall meet the requirements of rule
3318-5-02
3318:1-5-02 of the Administrative Code. In no case
shall the state contribution to such renovation project exceed the state share
of the cost of new construction.
(1) The cost
of new construction for the same grade configuration and projected enrollment
shall be determined according to rule 3318-4-01
3318:1-3-01
of the Administrative Code that defines the calculation of the project budget.
The cost shall not include items such as an allowance for demolition, swing
space, environmental abatement or warm, safe and dry expenditures to stabilize
an existing structure prior to replacement or other items as determined by the
commission.
(2) The maximum amount
of the co-funded portion of a renovation project shall be the cost for a new
facility determined under paragraph (A)(1) of this rule, which shall be
calculated at the time the master plan is approved for funding by the
controlling board, or, for segments of accelerated urban projects, at the time
the project agreement for that segment is signed.
(B) The cost of the work associated with the
preservation or restoration of items including, but not limited to, ornamental
plaster, terra cotta pieces, and antique painting will not be co-funded by the
state. The cost of work associated with preservation, restoration or
replacement of existing building systems with like materials including but not
limited to, clay tile or slate roofing material will be co-funded by the state
only up to the average budgeted cost for Ohio school design manual compliant
building systems.
(C) The
commission, prior to award of any contract or before approval of any change
order, shall require that a district certify the availability of local
resources to fund renovation costs in excess of the maximum co-funded dollar
amount calculated under paragraph (A) of this rule, which is necessary to
achieve the renovations in the accepted assessment report and master plan and
to fund any anticipated work described in paragraph (B) of this rule.
Notes
Promulgated Under: 119.03
Statutory Authority: 123.21
Rule Amplifies: 3318.03
Prior Effective Dates: 11/17/2006, 08/10/2012, 04/26/2018