(A) A petition for an alternative emission
limitation demonstration period under paragraph (D) of rule
3745-103-62
of the Administrative Code shall include all of
the following information:
(1) In accordance
with paragraph (D)(4) of rule
3745-103-62
of the Administrative Code, all of the following
information:
(a) Documentation that the owner
or operator solicited bids for a NOx emission control
system designed for application to the specific boiler and designed to achieve
the applicable emission limitation in rule
3745-103-57,
3745-103-58,
or
3745-103-59
of the Administrative Code on an annual average basis. This documentation
must
shall
include a copy of all bid specifications;
.
(b) A copy of the performance guarantee
submitted by the vendor of the installed NOx emission
control system to the owner or operator showing that such system was designed
to meet the applicable emission limitation in rule
3745-103-57,
3745-103-58,
or
3745-103-59
of the Administrative Code on an annual average basis;
.
(c) Documentation describing the operational
and combustion conditions that are the basis of the performance
guarantee;
.
(d)
Certification by the primary vendor of the NOx emission control system that
such equipment and associated auxiliary equipment was properly installed
according to the modifications and procedures specified by the vendor; and
.
(e) Certification by the designated
representative that the owner(s)
owner or operator installed technology that meets the
requirements of paragraph (A)(2) of rule
3745-103-62
of the Administrative Code.
(2) In accordance with paragraph (D)(9) of
rule
3745-103-62
of the Administrative
Code,
(a) The operating
conditions of the NOx emission control system including
load range, oxygen range, coal volatile matter range, and, for tangentially
fired boilers, distribution of combustion air within the
NOx emission control system;
.
(b) Certification by the designated
representative that the owner(s)
owner or operator have achieved and are following the
operating conditions, boiler modifications, and upgrades that formed the basis
for the system design and performance guarantee;
.
(c) Any planned equipment modifications and
upgrades for the purpose of achieving the maximum NOx
reduction performance of the NOx emission control system
that were not included in the design specifications and performance guarantee,
but that were achieved prior to submission of this application and are being
followed;
.
(d) A
list of any modifications or replacements of equipment that
are to
shall
be done prior to the completion of the demonstration period for the purpose of
reducing emissions of NOx
;
and
.
(e) The parametric testing that
will
shall be
conducted to determine the reason or reasons if the unit fails to achieve the
applicable emission limitation and to verify the proper operation of the
installed NOx emission control system during the
demonstration period. The tests shall include tests in rule
3745-103-66
of the Administrative Code, which may be modified as follows:
(i) The owner or operator of the unit may add
tests to those listed in rule
3745-103-66
of the Administrative Code, if such additions provide data relevant to the
failure of the installed NOx emission control system to
meet the applicable emissions limitation in rule
3745-103-57,
3745-103-58,
or
3745-103-59
of the Administrative Code; or
(ii)
The owner or operator of the unit may remove tests listed in rule
3745-103-66
of the Administrative Code that are shown, to the satisfaction of the director,
not to be relevant to NOx emissions from the affected
unit; and
(iii) In the event the
performance guarantee or the NOx emission control system
specifications require additional tests not listed in rule
3745-103-66
of the Administrative Code, or specify operating conditions not verified by
tests listed in rule
3745-103-66
of the Administrative Code, the owner or operator of the unit shall include
such additional tests.
(3) In accordance with paragraph (D)(10) of
rule
3745-103-62
of the Administrative Code, all of the following
information for the operating period:
(a) The
average NOx emission rate (in pound per MMBtu) of the
specific unit;
.
(b) The
highest hourly NOx emission rate (in pound per MMBtu) of
the specific unit;
.
(d) Total heat input (in MMBtu) for the unit
for each hour of operation, calculated in accordance with the requirements of
40 CFR Part 75
; and
.
(e)
Total integrated hourly unit load (in MWe-hrs), on a gross basis.
(B) A petition for an
alternative emission limitation shall include all
of the following information in accordance with paragraph (E)(6) of rule
3745-103-62
of the Administrative Code.
(1) Total heat
input (in MMBtu) for the unit for each hour of operation, calculated in
accordance with the requirements of 40 CFR Part 75
;
.
(2) Hourly NOx
emission rate (in pound per MMBtu), calculated in accordance with the
requirements of 40 CFR Part 75
; and
.
(3)
Total integrated hourly unit load (in MWe-hrs), on a gross basis.
Notes
Promulgated Under: 119.03
Statutory Authority: 3704.03(E)
Rule Amplifies: 3704.03(A), 3704.03(E)
Prior Effective Dates: 06/27/2002, 01/12/2007, 11/10/2011, 10/20/2017
Promulgated Under: 119.03
Statutory Authority: 3704.03(E)
Rule Amplifies: 3704.03(A), 3704.03(E)
Prior Effective Dates: 6/27/02, 1/12/07, 11/10/11